Deputy Grading
|
9/21/2021
|
Conditional Approval
|
CARLOS MATAMOROS
|
|
Piling/Pier/Caisson
|
10/18/2021
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
11/12/2021
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
11/16/2021
|
Partial Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
11/18/2021
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
11/19/2021
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
1/28/2022
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/31/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
1/31/2022
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Pre-Inspection
|
1/31/2022
|
Approved
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
2/1/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
3/1/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Reinforced Concrete Frame
|
3/2/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
3/8/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/9/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
3/9/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/10/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/11/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/14/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/15/2022
|
Approved
|
MICHAEL PELHAM
|
|
Piling/Pier/Caisson
|
3/16/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Grading
|
3/17/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/18/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/22/2022
|
Approved
|
MICHAEL PELHAM
|
|
Deputy Grading
|
3/23/2022
|
Approved
|
MICHAEL PELHAM
|
|
Piling/Pier/Caisson
|
4/5/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
4/11/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Piling/Pier/Caisson
|
4/11/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
4/19/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
5/9/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
5/9/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
5/12/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
5/20/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
6/1/2022
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
6/3/2022
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Reinforced Concrete Frame
|
6/7/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
6/8/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
6/23/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Shotcrete
|
6/27/2022
|
Approved
|
MICHAEL PELHAM
|
|
Reinforced Concrete Frame
|
6/29/2022
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
7/1/2022
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/5/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Shotcrete
|
7/6/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
7/13/2022
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
7/14/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
7/16/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Concrete
|
7/18/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
8/4/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Reinforced Concrete Frame
|
8/5/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Shotcrete
|
8/8/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Shotcrete
|
8/9/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
9/27/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
9/30/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
9/30/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
10/8/2022
|
Off-Hour Fees Due
|
|
|
Footing/Foundation/Slab
|
10/11/2022
|
Off-Hour Fees Due
|
|
|
Footing/Foundation/Slab
|
10/11/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2022
|
Partial Approval
|
EVAN COOPER
|
|
Piling/Pier/Caisson
|
10/31/2022
|
Partial Approval
|
EVAN COOPER
|
|
Piling/Pier/Caisson
|
11/15/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Special/Order Compliance
|
11/18/2022
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
11/22/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
11/23/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
12/5/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
12/14/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Piling/Pier/Caisson
|
12/19/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/20/2022
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
12/30/2022
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Sewer
|
12/30/2022
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
1/3/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/6/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
1/6/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/7/2023
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
1/12/2023
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/12/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
1/12/2023
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2023
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
1/25/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Shotcrete
|
1/27/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
2/2/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/7/2023
|
Not Ready for Inspection
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Shotcrete
|
2/8/2023
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/8/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/13/2023
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
2/17/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/28/2023
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Shotcrete
|
3/3/2023
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/3/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
3/3/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Special/Order Compliance
|
3/3/2023
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/7/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
3/7/2023
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/16/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/24/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/5/2023
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
PLUMBING-Rough
|
4/11/2023
|
Corrections Issued
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/28/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/3/2023
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Excavation/Setback/Form/Re-Bar
|
5/25/2023
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/1/2023
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/8/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
6/15/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
6/22/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
6/23/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
6/23/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
7/10/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
7/11/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
7/12/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
7/14/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
7/21/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
7/25/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
8/11/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
8/11/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Rough-Elec/Plmb/HVAC
|
8/11/2023
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
8/14/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
8/16/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
8/22/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Footing/Foundation/Slab
|
8/22/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
8/23/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
8/28/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
9/7/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2023
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Deputy Reinf. Concrete
|
9/18/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
9/25/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Sewer
|
9/25/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Special/Order Compliance
|
9/25/2023
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
9/27/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Shotcrete
|
9/28/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
9/28/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Shotcrete
|
9/29/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/4/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
10/4/2023
|
Approved
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
10/6/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/6/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/11/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
10/12/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/13/2023
|
Conditional Approval
|
ARAM AVEDISIAN
|
|
Piling/Pier/Caisson
|
10/16/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
10/16/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
10/17/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
10/18/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
10/18/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/20/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
10/24/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/24/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
10/24/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Structural Steel Frame
|
10/24/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
10/26/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
10/26/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
10/30/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
11/1/2023
|
Partial Inspection
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
11/1/2023
|
Partial Inspection
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
11/2/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
11/2/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
11/3/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
11/6/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
11/7/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Rough-Elec/Plmb/HVAC
|
11/7/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
11/9/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
11/13/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
11/14/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
11/16/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
11/16/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
ELECTRICAL-Rough
|
11/17/2023
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
11/17/2023
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Structural Steel Frame
|
11/17/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Reinforced Concrete Frame
|
11/21/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
12/5/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Light Gage Steel Frame
|
12/11/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
12/13/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
12/13/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
12/13/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
12/14/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
12/14/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
12/14/2023
|
Approved
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
12/15/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
12/19/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
12/26/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Structural Steel Frame
|
12/26/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
12/27/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
12/28/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Drywall Nailing
|
1/2/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
1/11/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Deputy Reinf. Concrete
|
1/12/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Interior/Exterior Lathing
|
1/16/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Footing/Foundation/Slab
|
1/17/2024
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
1/17/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
1/19/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Shotcrete
|
1/23/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Deputy Shotcrete
|
1/24/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Interior/Exterior Lathing
|
1/24/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
1/29/2024
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Reinforced Concrete Frame
|
1/29/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
1/30/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Special/Order Compliance
|
1/30/2024
|
Partial Inspection
|
BRENDAN LOONEY
|
|
Special/Order Compliance
|
1/30/2024
|
Partial Inspection
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
2/2/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
2/2/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Piling/Pier/Caisson
|
2/2/2024
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Drywall Nailing
|
2/12/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
2/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
2/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
2/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
2/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
2/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Special/Order Compliance
|
2/12/2024
|
Partial Inspection
|
MICHAEL PELHAM
|
|
Structural Steel Frame
|
2/12/2024
|
Approved
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
2/14/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Drywall Nailing
|
2/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
2/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
2/15/2024
|
No Access for Inspection
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
2/16/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
2/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
2/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
2/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Pre-Inspection
|
2/16/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Wood Frame
|
2/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
2/22/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/22/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
2/22/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/27/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
2/28/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Grading Pre-Inspection
|
2/28/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/28/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
2/28/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
2/29/2024
|
Conditional Approval
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
2/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
3/1/2024
|
Approved
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
3/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
3/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
3/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Rough-Elec/Plmb/HVAC
|
3/18/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
3/21/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
PLUMBING-Rough
|
3/21/2024
|
Corrections Issued
|
CHRISTOPHER WILSON
|
|
ELECTRICAL-Rough
|
3/22/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
3/22/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
3/27/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
3/28/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
3/28/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
4/4/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Pool Piping
|
4/4/2024
|
Not Ready for Inspection
|
CHRISTOPHER WILSON
|
|
Piling/Pier/Caisson
|
4/9/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
4/9/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
4/11/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Reinforced Concrete Frame
|
4/11/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
PLUMBING-Rough
|
4/16/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
4/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Rough-Elec/Plmb/HVAC
|
4/16/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Underground Mechanical
|
4/16/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
4/17/2024
|
Approved
|
STEPHANIE SWANSON
|
|
PLUMBING-Rough
|
4/17/2024
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Footing/Foundation/Slab
|
4/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
4/18/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
4/19/2024
|
Approved
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
4/19/2024
|
Approved
|
SEAN HAUPT
|
|
Rough-Elec/Plmb/HVAC
|
4/23/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Underground Mechanical
|
4/23/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Pool Piping
|
4/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Pre-Inspection
|
4/24/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Rough-Elec/Plmb/HVAC
|
4/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
4/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
4/26/2024
|
Approved
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
4/26/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
4/26/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
4/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
4/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Structural Steel Frame
|
4/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
4/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
5/8/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
5/9/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Footing/Foundation/Slab
|
5/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
5/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
5/17/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
5/21/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
5/21/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
5/21/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
5/23/2024
|
Approved
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
5/23/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
5/24/2024
|
Approved
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
5/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Piling/Pier/Caisson
|
5/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
6/11/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Reinforced Concrete Frame
|
6/11/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Structural Steel Frame
|
6/11/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Shotcrete
|
6/17/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
6/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
7/3/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
7/3/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
7/5/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
7/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
7/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
7/15/2024
|
Approved
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
7/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
7/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
7/26/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
7/29/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
8/1/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
8/6/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
8/7/2024
|
Approved
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
8/7/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Shotcrete
|
8/9/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
8/20/2024
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
8/20/2024
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
8/23/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/23/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/23/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
8/23/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/26/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/28/2024
|
Corrections Issued
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
9/5/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
9/5/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
9/5/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Green Building Rough
|
9/5/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Verify Sprinkler Sign Off
|
9/5/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
9/6/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2024
|
Corrections Issued
|
SEAN HAUPT
|
|
Green Building Rough
|
9/9/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Verify Sprinkler Sign Off
|
9/9/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Underground Mechanical
|
9/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
9/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
9/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
9/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
9/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
9/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
9/20/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/20/2024
|
Approved
|
SEAN HAUPT
|
|
Green Building Rough
|
9/20/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Verify Sprinkler Sign Off
|
9/20/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
9/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Reinforced Concrete Frame
|
9/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
9/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/8/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
10/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
10/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
10/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
10/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
10/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
10/18/2024
|
Corrections Issued
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
10/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
10/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
10/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
10/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
10/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Wood Frame
|
10/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
11/2/2024
|
Partial Approval
|
MEL KHACHATOURIAN
|
|
Deputy Reinf. Concrete
|
11/4/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
11/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
11/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
11/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
11/12/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Special/Order Compliance
|
11/12/2024
|
Partial Inspection
|
BOBBY KEY
|
|
Drywall Nailing
|
11/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
11/18/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Steel/Welding
|
11/22/2024
|
Corrections Issued
|
SEAN HAUPT
|
|
Insulation
|
11/22/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
11/25/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
11/25/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
11/25/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Steel/Welding
|
11/27/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Steel/Welding
|
12/3/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
12/4/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
12/4/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
12/4/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Structural Steel Frame
|
12/4/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
12/19/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
12/19/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
12/19/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
12/19/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Wood Frame
|
12/26/2024
|
Approved
|
SEAN HAUPT
|
|
Drywall Nailing
|
1/8/2025
|
Partial Approval
|
BOBBY KEY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/10/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Wood Frame
|
1/10/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
1/23/2025
|
Partial Approval
|
CHRISTOPHER WILSON
|
|
Deputy Grading
|
1/29/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Light Gage Steel Frame
|
2/11/2025
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
2/20/2025
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
2/20/2025
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
2/24/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
2/24/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
2/28/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
3/5/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Gas Test
|
3/5/2025
|
Approved
|
CARLOS MATAMOROS
|
|
Excavation/Setback/Form/Re-Bar
|
3/10/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Structural Steel Frame
|
3/10/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
3/18/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
4/4/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
4/18/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
4/21/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
5/8/2025
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Interior/Exterior Lathing
|
5/8/2025
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Deputy Steel/Welding
|
5/15/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
5/19/2025
|
Partial Approval
|
DANIEL VERA
|
|
HVAC-Rough
|
5/19/2025
|
Not Ready for Inspection
|
DANIEL VERA
|
|
PLUMBING-Rough
|
5/19/2025
|
Not Ready for Inspection
|
DANIEL VERA
|
|
BUILDING-Rough-Frame
|
5/20/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Insulation
|
5/20/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
5/21/2025
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
5/21/2025
|
Corrections Issued
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
5/21/2025
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
5/22/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
5/27/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
5/27/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Wood Frame
|
6/4/2025
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
6/10/2025
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
6/10/2025
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
6/16/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
6/23/2025
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Insulation
|
6/27/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
7/2/2025
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
7/21/2025
|
Partial Approval
|
DANIEL VERA
|
|
Deputy Steel/Welding
|
8/11/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Service/Power Release
|
8/14/2025
|
Corrections Issued
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/15/2025
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/15/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/22/2025
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/22/2025
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
8/22/2025
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
8/25/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
8/25/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
9/2/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
9/23/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
10/9/2025
|
Approved
|
SEAN HAUPT
|
|
Special/Order Compliance
|
10/9/2025
|
Partial Approval
|
GEM DE OCAMPO
|
|
HVAC-Rough
|
11/5/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
11/5/2025
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Sewer
|
2/3/2026
|
Approved
|
CHRISTOPHER WILSON
|
|
Drywall Nailing
|
3/31/2026
|
Approved
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
4/17/2026
|
Corrections Issued
|
CARLOS MATAMOROS
|
|
Service/Power Release
|
4/24/2026
|
Approved
|
CARLOS MATAMOROS
|