2801 S SANBORN AVE 90291

Certificate Information: 2801 S SANBORN AVE 90291

Application / Permit
18010-20000-04052
Plan Check / Job No.
B18VN14073
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New irregular shape 63'8" x 40' NFPA13-D sprinkler throughout 2-story dwelling with attached garage and roof deck. See comment.
Permit Issued
Issued on 2/13/2020
Issuing Office
Metro
Current Status
CofO Issued on 12/12/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/17/2018 APPLICANT
Green Plans Picked Up 8/29/2018 APPLICANT
Assigned to Plan Check Engineer 9/6/2018 ALDOUS CHIC
Corrections Issued 9/10/2018 ALDOUS CHIC
Quality Review Completed 9/12/2018 OMID HEDAYAT
Building Plans Picked Up 9/17/2018 APPLICANT
Applicant returned to address corrections 11/5/2018 ALDOUS CHIC
Applicant returned to address corrections 12/10/2018 ALDOUS CHIC
Plan Check Approved 12/18/2018 ALDOUS CHIC
Issued 2/13/2020 LADBS
CofO in Progress 12/9/2025 DAVID FEILER
Permit Finaled 12/12/2025 RICHARD STEINBACH
CofO Issued 12/12/2025 RICHARD STEINBACH
Permit Finaled 12/12/2025 RICHARD STEINBACH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/24/2018 JEANETTE VONG
Abandoned oil well Cleared 9/28/2018 JOHN DALLAS
Hydrant and Access approval Cleared 9/28/2018 JOHN CONNEALLY
Miscellaneous Cleared 9/28/2018 HERMINIGILDO AGUSTIN
Coastal Zone Cleared 10/24/2018 SOPHIE GABEL-SCHEINBAU
Coastal Zone Cleared 10/24/2018 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 10/24/2018 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 10/24/2018 SOPHIE GABEL-SCHEINBAU
Specific Plan Cleared 10/24/2018 SOPHIE GABEL-SCHEINBAU
Green Code Cleared 10/26/2018 PARISA ZAHABI
Sewer availability Cleared 11/8/2018 HISASHI KOBAYAKAWA
Low Impact Development Cleared 11/26/2018 MITESH PATEL
Roof/Waste drainage to street Cleared 11/26/2018 MICHAEL CASTILLO

Contact Information

Architect Davis, Paul S; Lic. No.: C27920 12906 VENICE BLVD.      LOS ANGELES, CA 90066
Contractor Epic Construction Inc; Lic. No.: 574409-B 2808 OREGON COURT L5      TORRANCE, CA 90503
Engineer Baad, Katherine Firestone; Lic. No.: C64669 5232 ZAKON RD      TORRANCE, CA 90505
Engineer Cox, Steven Jeffrey; Lic. No.: C48940 130 MAGELLAN ST      THOUSAND OAKS, CA 91360
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Mc, Cormick Charles Norman; Lic. No.: C32534 462 GLENSTONE DR      MOUNTIAN HOME, AR 72653
Engineer Sepich, John Edward; Lic. No.: C37509 4007 MCCULLOUGH AVE 469      SAN ANTONIO, TX 78212
Geologist Hollingsworth, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 6/4/2020 Partial Approval DAVID HEINE
Sewer 6/4/2020 Approved DAVID HEINE
METHANE-Rough 6/26/2020 Partial Approval DAVID HEINE
METHANE-Subgrade 6/26/2020 Approved DAVID HEINE
Excavation/Setback/Form/Re-Bar 8/6/2020 Partial Approval DAVID HEINE
Footing/Foundation/Slab 8/6/2020 Partial Approval DAVID HEINE
METHANE-Barrier 8/6/2020 Approved DAVID HEINE
Reinforced Masonry Frame 8/6/2020 Partial Approval DAVID HEINE
Deputy Reinf. Concrete 8/12/2020 Partial Approval DAVID HEINE
Footing/Foundation/Slab 10/6/2020 Partial Approval DAVID HEINE
Floor/Roof Diaphrgm/Shear Wall 10/30/2020 Partial Approval DAVID HEINE
Floor/Roof Diaphrgm/Shear Wall 11/2/2020 Partial Approval DAVID HEINE
Floor/Roof Diaphrgm/Shear Wall 12/4/2020 Partial Approval DAVID HEINE
PLUMBING-Rough 3/12/2021 Not Ready for Inspection JOHNNY MIRANDA
Underground Mechanical 3/12/2021 Partial Approval JOHNNY MIRANDA
PLUMBING-Rough 5/21/2021 Approved JOHNNY MIRANDA
Floor/Roof Diaphrgm/Shear Wall 1/5/2022 Partial Approval EVAN COOPER
Verify Sprinkler Sign Off 1/5/2022 Corrections Issued EVAN COOPER
ELECTRICAL-Rough 9/1/2022 Partial Approval DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 9/6/2022 Partial Approval DAVID FEILER
HVAC-Rough 9/6/2022 Partial Approval DAVID FEILER
Interior/Exterior Lathing 10/7/2022 Corrections Issued DAVID FEILER
Interior/Exterior Lathing 10/12/2022 Partial Inspection DAVID FEILER
ELECTRICAL-Rough 10/17/2022 Partial Inspection DAVID FEILER
Interior/Exterior Lathing 10/17/2022 Partial Approval DAVID FEILER
Shower Pan 12/13/2022 Approved HERBERT GIRON
Reinforced Masonry Frame 12/28/2022 Partial Approval EVAN COOPER
Reinforced Masonry Frame 1/3/2023 Partial Approval EVAN COOPER
Footing/Foundation/Slab 1/6/2023 Partial Approval EVAN COOPER
ELECTRICAL-Rough 2/27/2023 Approved EVAN COOPER
HVAC-Rough 3/24/2023 Corrections Issued EVAN COOPER
BUILDING-Rough-Frame 3/28/2023 Approved EVAN COOPER
Green Building Rough 3/28/2023 Approved EVAN COOPER
METHANE-Rough 3/28/2023 Approved EVAN COOPER
Verify Sprinkler Sign Off 3/28/2023 Approved EVAN COOPER
Insulation 5/5/2023 Conditional Approval EVAN COOPER
Drywall Nailing 5/22/2023 Approved EVAN COOPER
Insulation 5/22/2023 Approved EVAN COOPER
Interior/Exterior Lathing 7/24/2023 Approved EVAN COOPER
PLUMBING-Rough 1/22/2024 Approved TEMISTOCLES CAAL
Gas Test 3/14/2025 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 4/23/2025 Approved JESUS RODRIGUEZ
Service/Power Release 4/29/2025 Approved JESUS RODRIGUEZ
PLUMBING-Final 5/1/2025 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Final 5/9/2025 Approved JESUS RODRIGUEZ
HVAC-Final 7/1/2025 Approved JESUS RODRIGUEZ
Final 11/6/2025 Not Ready for Inspection JESUS RODRIGUEZ
Footing/Foundation/Slab 11/6/2025 Approved JESUS RODRIGUEZ
Green Building Final 11/6/2025 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 11/6/2025 SGSOV Approved JESUS RODRIGUEZ
Smoke Detectors 11/6/2025 Approved JESUS RODRIGUEZ
Structural Steel Frame 11/6/2025 Approved JESUS RODRIGUEZ
Final 12/9/2025 OK to Issue CofO DAVID FEILER