15950 W ROYAL OAK ROAD 91436

Certificate Information: 15950 W ROYAL OAK ROAD 91436

Application / Permit
18010-20000-03075
Plan Check / Job No.
B18VN10337
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 169'1-1/2" X 99'11" IRREGULAR SHAPED TWO-STORY SINGLE FAMILY DWELLING WITH 22' X 35' ATTACHED 3 CAR GARAGE, NEW 14'6" X 20'6" ONE CAR ATTACHED CARPORT AND 21'4" X 21'10" , 30' X 11' , 14' X 15' PATIO COVERS AND WITH 6' X 18' PORCH . FIRE SPRINKLERS THROUGHOUT NFPA-13D REQUIRED. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 5/7/2019
Issuing Office
Valley
Current Status
CofO Issued on 2/5/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/15/2018 APPLICANT
Green Plans Picked Up 7/9/2018 APPLICANT
Assigned to Plan Check Engineer 7/19/2018 MENA WASSEF
Corrections Issued 7/25/2018 MENA WASSEF
Quality Review Completed 7/26/2018 CHON CHIO KUO
Building Plans Picked Up 7/30/2018 APPLICANT
Plan Check Approved 5/7/2019 RARES BODEA
Issued 5/7/2019 LADBS
CofO in Progress 1/7/2022 DAVID SANDOVAL
CofO Issued 2/5/2022 MICHAEL SMITH
Permit Finaled 2/5/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 8/6/2018 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 8/6/2018 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 8/6/2018 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 8/6/2018 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 8/6/2018 LEE GUILBEAUX
Permit Cleared 8/6/2018 LEE GUILBEAUX
Sewer availability Cleared 8/6/2018 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 8/6/2018 LEE GUILBEAUX
Disturb/Remove Protected Trees Cleared 4/22/2019 JOHN KIM
Distance to fire station Cleared 4/24/2019 OSCAR SALGADO JR
Green Code Cleared 4/24/2019 MICHAEL AYERS
Hydrant and Access approval Cleared 4/24/2019 OSCAR SALGADO JR
GPI Written Notices Cleared 4/26/2019 MENA WASSEF
Grading Pre-Inspection Cleared 4/26/2019 MENA WASSEF
Low Impact Development Cleared 5/7/2019 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 5/7/2019 JOHN LIN

Contact Information

Contractor Owner-Builder       ,
Engineer Barajas,, Jorge Luis; Lic. No.: L8399 3635 SHADOW GROVE RD      PASADENA, CA 91107
Engineer Daneshfar,, Kourosh Dan; Lic. No.: C68377 19722 ARMINTA ST      WINNETKA, CA 91306
Engineer Irvine,, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD STE 1      PASADENA, CA 91107
Engineer Yuzon,, Benigno S; Lic. No.: S3454 25531 PRADO DELAS BELLOTAS      CALABASAS, CA 91302
Geologist Feffer,, Joshua Rafael; Lic. No.: EG2138 12253 GORHAM AVE      LOS ANGELES, CA 90049

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 8/5/2019 Partial Approval RONALD COWAN
Excavation/Setback/Form/Re-Bar 8/21/2019 Partial Approval RONALD COWAN
Footing/Foundation/Slab 8/21/2019 Partial Approval RONALD COWAN
Deputy Reinf. Concrete 8/23/2019 Approved RONALD COWAN
Reinforced Concrete Frame 8/28/2019 Approved RONALD COWAN
Footing/Foundation/Slab 9/5/2019 Partial Approval RONALD COWAN
Reinforced Concrete Frame 9/5/2019 Partial Approval RONALD COWAN
Deputy Reinf. Concrete 9/6/2019 Approved RONALD COWAN
Footing/Foundation/Slab 9/24/2019 Approved RONALD COWAN
Deputy Steel/Welding 10/7/2019 Approved RONALD COWAN
Floor/Roof Diaphrgm/Shear Wall 10/11/2019 Partial Approval RONALD COWAN
Floor/Roof Diaphrgm/Shear Wall 10/18/2019 Partial Approval RONALD COWAN
Floor/Roof Diaphrgm/Shear Wall 1/21/2020 Partial Approval RONALD COWAN
Deputy Wood Construction 1/29/2020 Approved RONALD COWAN
ELECTRICAL-Rough 4/21/2020 Approved RONALD COWAN
HVAC-Rough 4/21/2020 Approved RONALD COWAN
PLUMBING-Rough 4/21/2020 Approved RONALD COWAN
BUILDING-Rough-Frame 4/23/2020 Approved RONALD COWAN
Green Building Rough 4/23/2020 Approved RONALD COWAN
Verify Sprinkler Sign Off 4/23/2020 Approved RONALD COWAN
Shower Pan 5/4/2020 Approved RONALD COWAN
Insulation 5/7/2020 Approved RONALD COWAN
Drywall Nailing 5/14/2020 Approved RONALD COWAN
Interior/Exterior Lathing 5/14/2020 Partial Approval RONALD COWAN
Interior/Exterior Lathing 5/18/2020 Approved RONALD COWAN
ELECTRICAL-Final 9/24/2021 Corrections Issued RONALD COWAN
HVAC-Final 9/24/2021 Corrections Issued RONALD COWAN
PLUMBING-Final 9/24/2021 Corrections Issued RONALD COWAN
Service/Power Release 9/24/2021 Approved RONALD COWAN
Final 10/4/2021 Corrections Issued RONALD COWAN
Green Building Final 10/4/2021 Approved RONALD COWAN
SGSOV-Seismic Gas S/O Valve 10/4/2021 SGSOV Approved RONALD COWAN
Smoke Detectors 10/4/2021 Approved RONALD COWAN
ELECTRICAL-Final 10/6/2021 Approved RONALD COWAN
Gas Test 10/6/2021 Approved RONALD COWAN
Service/Power Release 10/6/2021 Approved RONALD COWAN
Final 1/6/2022 OK to Issue CofO DAVID SANDOVAL