7900 N BALBOA BLVD 91406

Certificate Information: 7900 N BALBOA BLVD 91406

Application / Permit
18010-20000-02921
Plan Check / Job No.
B18VN10110
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
OFFICE BUILDING WITH DECK ON THE SECOND FLOOR. STRIPE PARKING AREA. (STORE FRONT SYSYTEM UNDER DEFFERED PERMIT)
Permit Issued
Issued on 1/18/2019
Issuing Office
Valley
Current Status
Issued on 1/18/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/13/2018 APPLICANT
Disabled Access Plans Picked Up 6/21/2018 APPLICANT
Assigned to Plan Check Engineer 7/5/2018 RUDOLF KINAR MELIKOFF
Corrections Issued 7/10/2018 RUDOLF KINAR MELIKOFF
Quality Review Completed 7/12/2018 STEVEN KIM
Building Plans Picked Up 7/13/2018 APPLICANT
Green Plans Picked Up 7/13/2018 APPLICANT
Applicant returned to address corrections 12/21/2018 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 12/28/2018 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 1/11/2019 RUDOLF KINAR MELIKOFF
Plan Check Approved 1/17/2019 RUDOLF KINAR MELIKOFF
Issued 1/18/2019 LADBS

Permit Application Clearance Information

City owned building/parcel Cleared 11/1/2018 HAROOT AVANESIAN
"T" removal Cleared 11/9/2018 MARC WOERSCHING
CPC Cleared 11/9/2018 MARC WOERSCHING
Miscellaneous Cleared 11/9/2018 MARC WOERSCHING
Prkng lot landscape/Water mgmt Cleared 11/9/2018 MARC WOERSCHING
ZA Case Cleared 11/9/2018 MARC WOERSCHING
ZA Case Cleared 11/9/2018 MARC WOERSCHING
"Q" conditions Cleared 11/14/2018 STEVEN WECHSLER
"Q" conditions Cleared 11/14/2018 STEVEN WECHSLER
"Q" conditions Cleared 11/14/2018 STEVEN WECHSLER
DAS Clearance Cleared 11/14/2018 RUDOLF KINAR MELIKOFF
Green Code Cleared 11/14/2018 MICHAEL AYERS
ZI Cleared 11/14/2018 STEVEN WECHSLER
ZI Cleared 11/14/2018 STEVEN WECHSLER
Address approval Cleared 11/15/2018 MARKOS PEREZ-BRAN
Eng Process Fee Ord 176,300 Cleared 11/15/2018 MARKOS PEREZ-BRAN
Highway dedication Cleared 11/15/2018 MARKOS PEREZ-BRAN
Hydrant and Access approval Cleared 11/19/2018 GEORGE SUCHAND
Driveway location Cleared 12/19/2018 KEN AITCHISON
Flood clearance Cleared 12/19/2018 SYLVIA DHIMDIS
Metro Rail approval Cleared 12/19/2018 RUDOLF KINAR MELIKOFF
Miscellaneous Cleared 12/19/2018 KEN AITCHISON
Transportation Demand Ord. Cleared 12/19/2018 KEN AITCHISON
Low Impact Development Cleared 12/20/2018 RYAN HUDSON
Roof/Waste drainage to street Cleared 12/20/2018 MARKOS PEREZ-BRAN
Sewer availability Cleared 12/20/2018 MARKOS PEREZ-BRAN
Miscellaneous Cleared 1/14/2019 MARC WOERSCHING

Contact Information

Contractor Argubright Construction Inc; Lic. No.: 493620-B 18140 INDEX STREET      NORTHRIDGE, CA 91325
Engineer Manesh,, Behnam Abraham; Lic. No.: C38454 17337 VENTURA BLVD STE 112      ENCINO, CA 91316
Engineer Rahbar,, Farzin S; Lic. No.: S2833 24372 VANOWEN STREET STE 104      WEST HILLS, CA 91307

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 1/30/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 1/30/2019 Corrections Issued ROBERT COLE
Deputy Reinf. Concrete 2/20/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 2/20/2019 Not Ready for Inspection ROBERT COLE
Excavation/Setback/Form/Re-Bar 2/26/2019 Partial Approval ROBERT COLE
Footing/Foundation/Slab 2/26/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 4/24/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 4/25/2019 Partial Inspection ROBERT COLE
Deputy Reinf. Concrete 4/26/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 5/1/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 5/1/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 5/6/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 5/8/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 5/8/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 5/10/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 5/10/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 5/14/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 5/15/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 5/21/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 6/19/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 6/20/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 6/26/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 7/1/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 7/3/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 7/3/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 7/12/2019 Conditional Approval JAMES STEPHENS
Deputy Drilled-In Anchors 7/25/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 7/31/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 8/8/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 8/19/2019 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/21/2019 Partial Inspection ROBERT COLE
Excavation/Setback/Form/Re-Bar 8/26/2019 Partial Approval ROBERT COLE
Footing/Foundation/Slab 8/27/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 9/11/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 9/12/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/12/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 9/13/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 9/13/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 9/16/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 9/17/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 9/18/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/18/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 9/19/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 9/20/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 10/1/2019 Conditional Approval ROBERT COLE
Light Gage Steel Frame 10/1/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 10/2/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/3/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 10/4/2019 Conditional Approval JAMES STEPHENS
Masonry Wall/Backfill 10/15/2019 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 10/16/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 10/17/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 10/21/2019 Partial Approval ROBERT COLE
Green Building Rough 10/21/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 10/22/2019 Conditional Approval ROBERT COLE
Deputy Wood Construction 10/23/2019 Conditional Approval ROBERT COLE
Insulation 10/30/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 11/1/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 11/5/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/6/2019 Partial Approval ROBERT COLE
Green Building Rough 11/6/2019 Not Ready for Inspection ROBERT COLE
Deputy Wood Construction 11/7/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Partial Approval ROBERT COLE
Green Building Rough 11/13/2019 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/20/2019 Partial Approval ROBERT COLE
Green Building Rough 11/20/2019 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 12/11/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 12/12/2019 Conditional Approval ROBERT COLE
Deputy Wood Construction 12/31/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 12/31/2019 Partial Approval ROBERT COLE
Green Building Rough 12/31/2019 Not Ready for Inspection ROBERT COLE
Deputy Wood Construction 1/15/2020 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 1/28/2020 Conditional Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 2/7/2020 Partial Approval JAMES STEPHENS
Light Gage Steel Frame 2/27/2020 Partial Inspection ROBERT COLE
Deputy Steel/Welding 2/28/2020 Conditional Approval ROBERT COLE
Drywall Nailing 3/18/2020 Partial Inspection ROBERT COLE
Green Building Rough 3/18/2020 Not Ready for Inspection ROBERT COLE
Insulation 3/18/2020 Partial Inspection ROBERT COLE
Insulation 3/31/2020 Partial Approval ROBERT COLE
Drywall Nailing 5/8/2020 Partial Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 5/8/2020 Partial Approval ROBERT COLE
Green Building Rough 5/8/2020 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 5/8/2020 Partial Approval ROBERT COLE
Drywall Nailing 5/29/2020 Partial Approval ROBERT COLE
Green Building Rough 5/29/2020 Not Ready for Inspection ROBERT COLE
Insulation 5/29/2020 Partial Approval ROBERT COLE
Drywall Nailing 6/19/2020 Partial Approval ROBERT COLE
Green Building Rough 6/19/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 11/17/2020 Partial Approval DANNY RODRIGUEZ
Green Building Rough 11/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 2/10/2021 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 8/23/2022 Approved DANIEL VARNUM
Final 8/23/2022 Partial Inspection DANIEL VARNUM
Footing/Foundation/Slab 8/23/2022 Approved DANIEL VARNUM
Green Building Final 8/23/2022 Approved DANIEL VARNUM
Green Building Rough 8/23/2022 Approved DANIEL VARNUM
Reinforced Masonry Frame 8/23/2022 Partial Approval DANIEL VARNUM
SGSOV-Seismic Gas S/O Valve 8/23/2022 SGSOV Approved DANIEL VARNUM
Smoke Detectors 8/23/2022 Approved DANIEL VARNUM
Structural Steel Frame 8/23/2022 Partial Approval DANIEL VARNUM
Verify Sprinkler Sign Off 8/23/2022 Partial Inspection DANIEL VARNUM
Final 6/5/2026 Conditional Approval EDWIN GREGORYONA
Reinforced Masonry Frame 6/5/2026 Approved EDWIN GREGORYONA
Structural Steel Frame 6/5/2026 Approved EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/5/2026 Approved EDWIN GREGORYONA