15126 LOGOS CT 91343

Certificate Information: 15126 LOGOS CT 91343

Application / Permit
18010-20000-02896
Plan Check / Job No.
B18VN10049
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY 46'-0" X 35'-0" SFD WITH ATT. 2-CAR GARAGE, & BALCONY PLAN 'C'; FIRE SPRINKLERS REQ'D (PER VTT-74408-SL: PART OF 10 SLS & 1 UNIT TO BE VERY LOW INCOME). "Small lot subdivision pursuant to Tentative Tract No./Preliminary Parcel Map No. VTT-74408-SL. A CofO (temporary or final) shall not be issued until after the final map has been recorded."
Permit Issued
Issued on 6/4/2019
Issuing Office
Valley
Current Status
CofO Issued on 3/30/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/13/2018 APPLICANT
Green Plans Picked Up 7/24/2018 APPLICANT
Assigned to Plan Check Engineer 8/9/2018 ALEXANDER SBARDELLATI
Corrections Issued 8/23/2018 ALEXANDER SBARDELLATI
Quality Review Completed 9/7/2018 CHON CHIO KUO
Building Plans Picked Up 9/19/2018 APPLICANT
Applicant returned to address corrections 10/22/2018 ALEXANDER SBARDELLATI
Applicant returned to address corrections 11/14/2018 ALEXANDER SBARDELLATI
Applicant returned to address corrections 11/19/2018 ALEXANDER SBARDELLATI
Plan Check Approved 3/22/2019 ALEXANDER SBARDELLATI
Issued 6/4/2019 LADBS
CofO in Progress 3/24/2022 SEAN WIRCH
CofO Issued 3/30/2022 MICHAEL SMITH
Permit Finaled 3/30/2022 MICHAEL SMITH

Permit Application Clearance Information

Internal circulation Cleared 9/20/2018 KEN AITCHISON
"Q" conditions Cleared 10/12/2018 STEVEN WECHSLER
CPC Cleared 10/12/2018 STEVEN WECHSLER
CPC Cleared 10/12/2018 STEVEN WECHSLER
Frnt yard landscape/Water mgmt Cleared 10/12/2018 STEVEN WECHSLER
Miscellaneous Cleared 10/12/2018 STEVEN WECHSLER
Tract Map conditions Cleared 10/12/2018 STEVEN WECHSLER
Address approval Cleared 10/23/2018 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 10/23/2018 ADRIAN SANCHEZ
Highway dedication Cleared 10/29/2018 LEE GUILBEAUX
Miscellaneous Cleared 10/29/2018 LEE GUILBEAUX
Permit Cleared 10/29/2018 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 10/29/2018 LEE GUILBEAUX
Sewer availability Cleared 10/29/2018 LEE GUILBEAUX
Miscellaneous Cleared 11/8/2018 STEVEN WECHSLER
Hydrant and Access approval Cleared 11/19/2018 GEORGE SUCHAND
Low Impact Development Cleared 12/6/2018 IDA MEISAMI-FARD
Density Bonus 12.22.A.25 Cleared 3/5/2019 MICHAEL ZIRBES
"T" removal Cleared 3/14/2019 STEVEN WECHSLER
Green Code Cleared 3/22/2019 MICHAEL AYERS

Contact Information

Architect Tabrizi, Sammi; Lic. No.: C34954 21731 AMBAR DRIVE      WOODLAND HILLS, CA 91364
Contractor J S Construction & Engineering Inc; Lic. No.: 1044634-B 28924 TIMBERLANE ST      AGOURA HILLS, CA 91301
Engineer Martirossyan, Armen; Lic. No.: C64223 802 PORTOLA AVE      GLENDALE, CA 91206
Engineer Pukkanasut, Jirayus; Lic. No.: C73728 1000 S COAST DRIVE #A204      COSTA MESA, CA 92626

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 8/15/2019 Partial Approval JOSEPH SAGEN
Excavation/Setback/Form/Re-Bar 8/19/2019 Approved JOSEPH SAGEN
Footing/Foundation/Slab 8/19/2019 Approved JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 10/8/2019 Partial Approval JOSEPH SAGEN
ELECTRICAL-Rough 11/19/2019 Approved JOSEPH SAGEN
HVAC-Rough 11/25/2019 Approved JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 11/26/2019 Partial Approval JOSEPH SAGEN
PLUMBING-Rough 12/10/2019 Approved JOSEPH SAGEN
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Partial Approval JOSEPH SAGEN
Green Building Rough 2/19/2020 Not Ready for Inspection JOSEPH SAGEN
Verify Sprinkler Sign Off 2/19/2020 Not Ready for Inspection JOSEPH SAGEN
BUILDING-Rough-Frame 3/2/2020 Partial Approval JOSEPH SAGEN
Green Building Rough 3/2/2020 Approved JOSEPH SAGEN
Interior/Exterior Lathing 3/2/2020 Partial Approval JOSEPH SAGEN
Verify Sprinkler Sign Off 3/2/2020 Not Ready for Inspection JOSEPH SAGEN
Drywall Nailing 4/16/2020 Approved JOSEPH SAGEN
Gas Test 5/10/2021 No Access for Inspection JOSEPH SAGEN
Gas Test 5/11/2021 Approved JOSEPH SAGEN
PLUMBING-Final 6/2/2021 Not Ready for Inspection JOSEPH SAGEN
SGSOV-Seismic Gas S/O Valve 6/2/2021 SGSOV Approved JOSEPH SAGEN
Service/Power Release 7/19/2021 Not Ready for Inspection JOSEPH SAGEN
ELECTRICAL-Final 8/25/2021 Not Ready for Inspection JOSEPH SAGEN
ELECTRICAL-Final 9/20/2021 Not Ready for Inspection JOSEPH SAGEN
Service/Power Release 9/28/2021 Approved JOSEPH SAGEN
Special/Order Compliance 10/12/2021 Not Ready for Inspection JOSEPH SAGEN
ELECTRICAL-Final 12/9/2021 Approved SEAN WIRCH
BUILDING-Rough-Frame 3/22/2022 Approved SEAN WIRCH
Final 3/22/2022 OK to Issue CofO SEAN WIRCH
Green Building Final 3/22/2022 Approved SEAN WIRCH
Smoke Detectors 3/22/2022 Approved SEAN WIRCH
Verify Sprinkler Sign Off 3/22/2022 Approved SEAN WIRCH