2828 W LONDON ST 1-16 90026

Certificate Information: 2828 W LONDON ST 1-16 90026

Application / Permit
18010-20000-02214
Plan Check / Job No.
B18VN08251
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED 2 STORY 16 UNIT APT OVER PRIVATE GROUND LEVEL PRIVATE GARAGE, TOTAL OF 3-STORY BLDG.. <SPRINKLERS REQ'D THROUGHOUT NFPA-13>
Permit Issued
Issued on 12/30/2019
Issuing Office
Valley
Current Status
CofO Issued on 4/26/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/15/2018 APPLICANT
Disabled Access Plans Picked Up 6/15/2018 APPLICANT
Assigned to Plan Check Engineer 6/28/2018 ABDUL CHEGENI
Green Plans Picked Up 6/28/2018 APPLICANT
Corrections Issued 7/25/2018 ABDUL CHEGENI
Quality Review Completed 8/2/2018 STEVEN KIM
Building Plans Picked Up 8/2/2018 APPLICANT
Applicant returned to address corrections 6/3/2019 ABDUL CHEGENI
Applicant returned to address corrections 7/23/2019 ABDUL CHEGENI
Applicant returned to address corrections 9/16/2019 ABDUL CHEGENI
Plan Check Approved 12/30/2019 ABDUL CHEGENI
Issued 12/30/2019 LADBS
CofO in Progress 4/26/2023 TED RIES
Permit Finaled 4/26/2023 TED RIES
CofO Issued 4/26/2023 TED RIES
Permit Finaled 4/26/2023 TED RIES

Permit Application Clearance Information

Address approval Cleared 8/8/2018 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 8/8/2018 ADRIAN SANCHEZ
Highway dedication Cleared 8/8/2018 ADRIAN SANCHEZ
Permit Cleared 8/8/2018 ADRIAN SANCHEZ
Fire Marshall Fire Life Safety Cleared 9/18/2018 GEORGE SUCHAND
ZI Cleared 10/29/2018 DAISY BENICIA
ZI Cleared 10/29/2018 DAISY BENICIA
DAS Clearance Cleared 11/29/2018 ABDUL CHEGENI
Sewer availability Cleared 4/23/2019 LEE GUILBEAUX
Low Impact Development Cleared 4/30/2019 ANDRES COVARRUBIAS
Building over 3-story or 36-ft Cleared 6/3/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/3/2019 CALOSHA APPROVED
GPI Written Notices Cleared 6/3/2019 ABDUL CHEGENI
Grading Pre-Inspection Cleared 6/3/2019 ABDUL CHEGENI
Roof/Waste drainage to street Cleared 6/4/2019 MARKOS PEREZ-BRAN
Frnt yard landscape/Water mgmt Cleared 7/2/2019 SHEILA GERSHON
Green Code Cleared 7/2/2019 MICHAEL AYERS
Hydrant and Access approval Cleared 7/2/2019 GILBERT URREA
Opn space landscape/Water mgmt Cleared 7/2/2019 SHEILA GERSHON
Work Adjacent to Public Way Cleared 12/9/2019 BOK GOH
Miscellaneous Cleared 12/30/2019 ABDUL CHEGENI

Contact Information

Contractor Ds Builders Group Inc; Lic. No.: 1045516-B 22647 VENTURA BOULEVARD #534      WOODLAND HILLS, CA 91364
Engineer Gharai, Armin; Lic. No.: C61464 6701 CORIE LN      WEST HILLS, CA 91307
Engineer Korganyan,, Karen; Lic. No.: L8510 5642 ETIWANDA AVE 9      TARZANA, CA 91356
Engineer Vidal, Juan Alonso; Lic. No.: GE861 15331 DOGWOOD ST      WESTMINSTER, CA 92683

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/10/2020 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 11/10/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 11/10/2020 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 11/20/2020 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 11/20/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 11/20/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/23/2020 Conditional Approval DANIEL MC AULIFFE
Insulation 12/7/2020 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 12/21/2020 Partial Approval DANIEL MC AULIFFE
Green Building Rough 12/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Barrier 12/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Rough 12/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
METHANE-Subgrade 12/21/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 12/21/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 12/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Shotcrete 12/28/2020 Conditional Approval DANIEL MC AULIFFE
METHANE-Subgrade 2/12/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/5/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 3/5/2021 Partial Approval DANIEL MC AULIFFE
METHANE-Barrier 3/5/2021 Approved DANIEL MC AULIFFE
METHANE-Subgrade 3/5/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/20/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 4/21/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/7/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/7/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 6/3/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/4/2021 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/12/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 7/14/2021 Partial Approval DANIEL MC AULIFFE
Green Building Rough 7/14/2021 Approved DANIEL MC AULIFFE
METHANE-Rough 7/14/2021 Approved DANIEL MC AULIFFE
Verify Sprinkler Sign Off 7/14/2021 Approved DANIEL MC AULIFFE
Wood Frame 7/14/2021 Partial Approval DANIEL MC AULIFFE
Wood Frame 8/26/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Wood Construction 9/9/2021 Approved DANIEL MC AULIFFE
Wood Frame 9/9/2021 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/4/2021 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 10/14/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/14/2021 Approved RAFAEL ESPINOZA
Insulation 10/25/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/3/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 12/16/2021 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 2/23/2022 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/23/2022 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 3/14/2022 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 6/7/2022 Not Ready for Inspection TED RIES
Final 6/7/2022 Not Ready for Inspection TED RIES
Footing/Foundation/Slab 6/7/2022 Not Ready for Inspection TED RIES
Green Building Final 6/7/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 6/7/2022 Not Ready for Inspection TED RIES
Reinforced Masonry Frame 6/7/2022 Not Ready for Inspection TED RIES
SGSOV-Seismic Gas S/O Valve 6/7/2022 SGSOV Not Ready TED RIES
Smoke Detectors 6/7/2022 Not Ready for Inspection TED RIES
Structural Steel Frame 6/7/2022 Not Ready for Inspection TED RIES
Drywall Nailing 7/28/2022 Conditional Approval TED RIES
Final 7/28/2022 Partial Inspection TED RIES
Footing/Foundation/Slab 7/28/2022 Conditional Approval TED RIES
Green Building Final 7/28/2022 Approved TED RIES
Reinforced Concrete Frame 7/28/2022 Conditional Approval TED RIES
Reinforced Masonry Frame 7/28/2022 Conditional Approval TED RIES
SGSOV-Seismic Gas S/O Valve 7/28/2022 SGSOV Not Ready TED RIES
Smoke Detectors 7/28/2022 Approved TED RIES
Structural Steel Frame 7/28/2022 Conditional Approval TED RIES
SGSOV-Seismic Gas S/O Valve 12/14/2022 SGSOV Not Ready TED RIES
Drywall Nailing 1/27/2023 Not Ready for Inspection TED RIES
Final 1/27/2023 Not Ready for Inspection TED RIES
Footing/Foundation/Slab 1/27/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 1/27/2023 Not Ready for Inspection TED RIES
Reinforced Masonry Frame 1/27/2023 Not Ready for Inspection TED RIES
SGSOV-Seismic Gas S/O Valve 1/27/2023 SGSOV Not Ready TED RIES
Structural Steel Frame 1/27/2023 Not Ready for Inspection TED RIES
Drywall Nailing 3/31/2023 Approved TED RIES
Final 3/31/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 3/31/2023 Approved TED RIES
Reinforced Concrete Frame 3/31/2023 Approved TED RIES
Reinforced Masonry Frame 3/31/2023 Approved TED RIES
SGSOV-Seismic Gas S/O Valve 3/31/2023 SGSOV Approved TED RIES
Structural Steel Frame 3/31/2023 Approved TED RIES