New 3 story, 9-unit, Type V-A apartment over Type I-A basement garage. Automatic fire sprinkler system NFPA-13 type required throughout.
Permit Issued
Issued on 11/23/2020
Issuing Office
Current Status
CofO Issued on 11/22/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/17/2018 APPLICANT
Disabled Access Plans Picked Up 5/14/2018 APPLICANT
Green Plans Picked Up 5/15/2018 APPLICANT
Assigned to Plan Check Engineer 5/17/2018 RODNEY SAMIIAN
Corrections Issued 5/24/2018 RODNEY SAMIIAN
Quality Review Completed 5/30/2018 ABDUL CHEGENI
Building Plans Picked Up 6/1/2018 APPLICANT
Applicant returned to address corrections 6/11/2019 RODNEY SAMIIAN
Applicant returned to address corrections 7/12/2019 RODNEY SAMIIAN
Applicant returned to address corrections 8/13/2019 RODNEY SAMIIAN
Applicant returned to address corrections 2/10/2020 RODNEY SAMIIAN
Applicant returned to address corrections 3/2/2020 RODNEY SAMIIAN
Applicant returned to address corrections 3/9/2020 RODNEY SAMIIAN
Plan Check Approved 3/11/2020 RODNEY SAMIIAN
Issued 11/23/2020 APPLICANT
CofO in Progress 11/22/2022 DAVID BURKHEAD
CofO Issued 11/22/2022 ERNESTO CORRAL
Permit Finaled 11/22/2022 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 12/7/2018 JOHN LIN
Eng Process Fee Ord 176,300 Cleared 12/7/2018 JOHN LIN
Sewer availability Cleared 6/13/2019 JULIUS GARCIA
Hydrant and Access approval Cleared 6/14/2019 GEORGE SUCHAND
DAS Clearance Cleared 10/9/2019 NORLITO MEDRANO
Green Code Cleared 2/7/2020 MICHAEL AYERS
Low Impact Development Cleared 2/25/2020 SARAH YOUSSEF
Frnt yard landscape/Water mgmt Cleared 2/26/2020 MARITZA PRZEKOP
Miscellaneous Cleared 2/26/2020 MARITZA PRZEKOP
Miscellaneous Cleared 2/26/2020 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 2/26/2020 MARITZA PRZEKOP
Specific Plan Cleared 2/26/2020 MARITZA PRZEKOP
Highway dedication Cleared 2/28/2020 ERIK BEASLEY
Roof/Waste drainage to street Cleared 2/28/2020 GUILLERMO PETRA
Fire Marshall Fire Life Safety Cleared 3/5/2020 OSCAR SALGADO JR
Building over 3-story or 36-ft Cleared 3/9/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/9/2020 CALOSHA APPROVED
Miscellaneous Cleared 3/9/2020 ABDUL CHEGENI
Permit Cleared 3/9/2020 ADRIAN CASTRO
Work Adjacent to Public Way Cleared 3/16/2020 ARMEN SARKISIAN

Contact Information

Contractor Raider Planning & Construction Inc; Lic. No.: 450191-B 17560 PARTHENIA STREET      NORTHRIDGE, CA 913253108
Engineer Choi, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804
Engineer Walter, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 1/11/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Other (see comments) 1/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/22/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/22/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/22/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/3/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/3/2021 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 2/4/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/5/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/5/2021 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 2/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 2/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/11/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/11/2021 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 2/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/23/2021 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 2/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/4/2021 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/4/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/18/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/18/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/19/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/14/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/14/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/15/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/15/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/21/2021 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 5/21/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 6/10/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 6/11/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/11/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/11/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 6/16/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/16/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/16/2021 Corrections Issued DAVID BURKHEAD
Insulation 6/18/2021 Corrections Issued DAVID BURKHEAD
Green Building Rough 6/23/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/23/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/23/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 6/25/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/25/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/25/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/30/2021 Partial Inspection DAVID BURKHEAD
Green Building Rough 7/6/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 7/6/2021 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/6/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/6/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 7/13/2021 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/13/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/13/2021 Partial Approval DAVID BURKHEAD
Insulation 7/15/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 7/19/2021 Partial Inspection DAVID BURKHEAD
Insulation 8/2/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 8/3/2021 Partial Inspection DAVID BURKHEAD
Insulation 8/11/2021 Partial Approval DAVID BURKHEAD
Insulation 9/8/2021 Partial Approval DAVID BURKHEAD
Special/Order Compliance 9/9/2021 Partial Inspection DAVID BURKHEAD
Insulation 9/17/2021 Partial Inspection DAVID BURKHEAD
Green Building Rough 9/23/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/23/2021 Partial Approval DAVID BURKHEAD
Wood Frame 9/23/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 10/7/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 10/7/2021 Partial Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/7/2021 Partial Approval DAVID BURKHEAD
Wood Frame 10/7/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 11/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/19/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/1/2021 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 12/6/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/6/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/6/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/9/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 12/9/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/9/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/10/2021 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 12/17/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/17/2021 Approved DAVID BURKHEAD
Wood Frame 12/17/2021 Partial Approval DAVID BURKHEAD
Insulation 12/20/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/21/2021 Partial Approval DAVID BURKHEAD
Green Building Rough 12/23/2021 Approved DAVID BURKHEAD
Reinforced Concrete Frame 12/23/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/28/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/30/2021 Partial Approval DAVID BURKHEAD
Insulation 1/3/2022 Partial Approval DAVID BURKHEAD
Wood Frame 1/5/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/7/2022 Partial Approval DAVID BURKHEAD
Insulation 1/12/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/13/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/19/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 1/24/2022 Approved DAVID BURKHEAD
Interior/Exterior Lathing 1/26/2022 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 1/28/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 2/18/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/22/2022 Approved DAVID BURKHEAD
Interior/Exterior Lathing 3/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 4/14/2022 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 4/25/2022 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 4/27/2022 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/9/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 5/11/2022 Corrections Issued DAVID BURKHEAD
Masonry Wall/Backfill 5/16/2022 Approved DAVID BURKHEAD
Deputy Reinf. Masonry 5/17/2022 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 6/10/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 6/16/2022 Approved DAVID BURKHEAD
Footing/Foundation/Slab 7/7/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/24/2022 Partial Approval EDWIN GREGORYONA
Final 10/17/2022 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/17/2022 Approved DAVID BURKHEAD
Green Building Final 10/17/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/17/2022 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 10/17/2022 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 10/17/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/17/2022 Approved DAVID BURKHEAD
Final 10/25/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 10/25/2022 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 10/25/2022 Partial Inspection DAVID BURKHEAD
Smoke Detectors 10/25/2022 Not Ready for Inspection DAVID BURKHEAD
Final 11/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Green Building Final 11/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Smoke Detectors 11/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Final 11/15/2022 Partial Approval DAVID BURKHEAD
Green Building Final 11/15/2022 Approved DAVID BURKHEAD
Smoke Detectors 11/15/2022 Approved DAVID BURKHEAD
Final 11/18/2022 Partial Inspection DAVID BURKHEAD