Footing/Foundation/Slab
|
3/7/2022
|
Partial Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
3/8/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
3/9/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
3/14/2022
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Deputy Reinf. Concrete
|
3/15/2022
|
Conditional Approval
|
MARK FERRARI
|
|
Deputy Reinf. Concrete
|
3/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/17/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/21/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/25/2022
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
4/6/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
4/21/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/26/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/26/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/27/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/2/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/4/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/5/2022
|
Conditional Approval
|
TED RIES
|
|
Footing/Foundation/Slab
|
5/5/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
5/6/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/9/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/13/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/13/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/17/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/19/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/20/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/25/2022
|
Conditional Approval
|
TERRY HERR
|
|
Deputy Reinf. Concrete
|
5/26/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
5/31/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/1/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/2/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/2/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/3/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/10/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
6/13/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/13/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/13/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/13/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/13/2022
|
Off-Hour Fees Due
|
|
|
Deputy Drilled-In Anchors
|
6/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/14/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/15/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/16/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/20/2022
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
6/20/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
6/21/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/21/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/21/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/22/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/23/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/24/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/27/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
6/27/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
6/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
6/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/28/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
6/30/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/1/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
7/1/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/1/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/1/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/1/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
7/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/5/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
7/5/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/6/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/7/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/8/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/8/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Other (see comments)
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/11/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Other (see comments)
|
7/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/12/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
7/13/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
7/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/14/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/19/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/20/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
7/21/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Reinforced Concrete Frame
|
7/21/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
7/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/26/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/26/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/26/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/26/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/27/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/28/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/2/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/2/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/2/2022
|
Conditional Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/2/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
8/3/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/3/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/3/2022
|
Conditional Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/3/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
8/4/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/4/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/4/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
8/5/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/5/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/5/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
8/8/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Pre-Stress Concrete
|
8/8/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/8/2022
|
Conditional Approval
|
TED RIES
|
|
Deputy Shotcrete
|
8/8/2022
|
Conditional Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
8/8/2022
|
Partial Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
8/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Pre-Stress Concrete
|
8/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/9/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
8/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/10/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
8/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/11/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/11/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
8/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/12/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/15/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/17/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/17/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/17/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/18/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
8/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/19/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Drilled-In Anchors
|
8/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/22/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/22/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/23/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/24/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/24/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/25/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
8/26/2022
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Drilled-In Anchors
|
8/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/29/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Shotcrete
|
8/29/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
9/1/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|