525 S SANTA FE AVE 90013

Certificate Information: 525 S SANTA FE AVE 90013

Application / Permit
18010-10005-05907
Plan Check / Job No.
B19LA22718
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(52) Foundation Only
Work Description
PROPOSED "EARLY START- FOUNDATION ONLY" FOR A NEW 35 STORY MIXED USE HIGHRISE BUILDING. 475 LIVE/WORK UNITS, OFFICE, RETAIL AND 2 LEVELS OF BASEMENT GARAGE. 6% (29 UNITS) OF THE TOTAL UNITS (475) WILL BE RESERVED AS VERY LOW INCOME UNITS. THIS PERMIT IS TO BRING UP TO THE SLAB AT EXISTING GRADE A LETTER FROM THE PEER REVIEWERS HAS BEEN PROVIDED DATED 2-6-2020 FOR THIS FOUNDATION ONLY PERMIT
Permit Issued
Issued on 3/3/2022
Issuing Office
Metro
Current Status
Permit Closed on 9/3/2025

Permit Application Status History

Submitted 8/9/2021 APPLICANT
Assigned to Plan Check Engineer 8/9/2021 LARRY LEE
Corrections Issued 10/29/2021 LARRY LEE
Plan Check Approved 3/3/2022 LARRY LEE
Issued 3/3/2022 APPLICANT
Building Plans Picked Up 3/4/2022 APPLICANT
Conditional Approval 8/23/2022 WINSTON DUNNING
Permit Closed 9/3/2025 ADAM BURGESS

Permit Application Clearance Information

Address approval Cleared 10/29/2019 CELINA MORENO
Bicycle Parking Cleared 10/29/2019 ELENA LOPEZ
Driveway location Cleared 10/29/2019 EDUARDO HERMOSO
Encroachment in public way Cleared 10/29/2019 ELENA LOPEZ
Highway dedication Cleared 10/29/2019 CELINA MORENO
Internal circulation Cleared 10/29/2019 EDUARDO HERMOSO
Permit Cleared 10/29/2019 CELINA MORENO
Sewer availability Cleared 10/29/2019 CELINA MORENO
Transportation Demand Ord. Cleared 10/29/2019 EDUARDO HERMOSO
Low Impact Development Cleared 11/14/2019 ORVAL HERNANDEZ-MARCI
Stormwater Pollution Mitigatn Cleared 11/14/2019 ORVAL HERNANDEZ-MARCI
Methane Ordinance Cleared 11/26/2019 WILLIAM JOHNS
Trees in Parkway Cleared 11/26/2019 ADRIAN SANCHEZ
Work Adjacent to Public Way Cleared 12/18/2019 CHIU TAM
Eng Process Fee Ord 176,300 Cleared 1/7/2020 ELAINE LEI
Roof/Waste drainage to street Cleared 1/23/2020 ELAINE LEI
Building over 3-story or 36-ft Cleared 2/18/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/18/2020 CALOSHA APPROVED
Hydrant and Access approval Cleared 2/26/2020 JOHN CONNEALLY
Green Code Cleared 2/28/2020 DONALD CRICHLOW
DCP conditions approval Cleared 4/2/2020 RICHARD TRUONG
Density Bonus 12.22.A.25 Cleared 4/2/2020 RICHARD TRUONG
Fire Marshall Fire Life Safety Cleared 4/2/2020 PEJMAN NOORI
"Q" conditions Cleared 4/16/2020 ERIN STRELICH
"T" removal Cleared 4/16/2020 ERIN STRELICH
CPC Cleared 4/16/2020 ERIN STRELICH
Miscellaneous Cleared 4/16/2020 ERIN STRELICH
Opn space landscape/Water mgmt Cleared 4/16/2020 ERIN STRELICH
Site Plan review Cleared 4/16/2020 ERIN STRELICH
Tract Map conditions Cleared 4/16/2020 ERIN STRELICH
ZI Cleared 4/16/2020 ERIN STRELICH
Miscellaneous Cleared 2/4/2022 KIMBERLY HENRY
DAS Clearance Cleared 3/1/2022 JOHN VASQUEZ

Contact Information

Contractor Carmel Construction West Llc; Lic. No.: 1070377-B 1000 SANSOME STREET 1ST FLOOR      SAN FRANCISCO, CA 94111

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/7/2022 Partial Approval MARK FERRARI
Deputy Reinf. Concrete 3/8/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 3/9/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/14/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 3/15/2022 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 3/16/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/17/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/17/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/18/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/21/2022 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 3/21/2022 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/21/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/25/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/6/2022 Conditional Approval RAFAEL ESPINOZA
Pre-Inspection 4/21/2022 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/27/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/27/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/29/2022 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 4/29/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/5/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 5/5/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 5/6/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/9/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/13/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/13/2022 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/25/2022 Conditional Approval TERRY HERR
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/2/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/7/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/7/2022 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/10/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/10/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/13/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/13/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/13/2022 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/13/2022 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 6/13/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/13/2022 Off-Hour Fees Due
Deputy Drilled-In Anchors 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/15/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/15/2022 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 6/15/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/17/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/17/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/17/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/17/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/17/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/20/2022 Off-Hour Fees Due
Reinforced Concrete Frame 6/20/2022 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/21/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/21/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/21/2022 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/23/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/23/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 6/27/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/28/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/28/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/1/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/1/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 7/5/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/7/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/7/2022 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/7/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/7/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/8/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/8/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/8/2022 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Other (see comments) 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 7/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/12/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/12/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/14/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/14/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/14/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/15/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/15/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/18/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/20/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/21/2022 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 7/21/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/22/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/25/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/26/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/26/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/28/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/28/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/29/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/29/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/2/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/2/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/2/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 8/2/2022 Partial Approval TED RIES
Deputy Drilled-In Anchors 8/3/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/3/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/3/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 8/3/2022 Partial Approval TED RIES
Deputy Drilled-In Anchors 8/4/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/4/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/4/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 8/5/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/5/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/5/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 8/8/2022 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/8/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/8/2022 Conditional Approval TED RIES
Deputy Shotcrete 8/8/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 8/8/2022 Partial Approval TED RIES
Deputy Drilled-In Anchors 8/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/10/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/10/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/11/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/11/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/15/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/15/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/16/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/16/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/16/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/16/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/17/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/17/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/17/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/17/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/18/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/18/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/19/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/22/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/22/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/24/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/24/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/25/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/25/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 8/26/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 8/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/1/2022 Conditional Approval RAFAEL ESPINOZA