Footing/Foundation/Slab
|
8/21/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
8/27/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/28/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
8/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/3/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/3/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/4/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/4/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/5/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
9/6/2019
|
Approved
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
9/6/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/6/2019
|
No Access for Inspection
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
9/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
9/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/9/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
9/9/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Excavation/Setback/Form/Re-Bar
|
9/9/2019
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
9/10/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/10/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
9/10/2019
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/11/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/12/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
9/13/2019
|
Conditional Approval
|
RICKEY JACKSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2019
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/16/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/16/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/16/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/17/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/17/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/18/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/19/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/19/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/20/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/25/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/26/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/26/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
9/26/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
9/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
9/26/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
9/26/2019
|
Off-Hour Fees Due
|
|
|
Deputy Pre-Stress Concrete
|
9/30/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Excavation/Setback/Form/Re-Bar
|
9/30/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Pre-Stress Concrete
|
10/1/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/1/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/1/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/3/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
10/3/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/4/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
10/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/7/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/8/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
10/10/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/11/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
10/11/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Excavation/Setback/Form/Re-Bar
|
10/11/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Pre-Stress Concrete
|
10/15/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/16/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/16/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/17/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
10/17/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/18/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/21/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/21/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/23/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/24/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
10/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/28/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/28/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/29/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/31/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/5/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
11/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/7/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
11/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/13/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/13/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/15/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/15/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/19/2019
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Pre-Stress Concrete
|
11/20/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/20/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
11/20/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/21/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
11/25/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Excavation/Setback/Form/Re-Bar
|
11/25/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Pre-Stress Concrete
|
11/26/2019
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/26/2019
|
Partial Approval
|
MILLARD ARDOIN
|
|
Deputy Pre-Stress Concrete
|
11/27/2019
|
Approved
|
HAMID PISHEHVAR
|
|
Excavation/Setback/Form/Re-Bar
|
11/27/2019
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
12/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/3/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Masonry Wall/Backfill
|
12/3/2019
|
Partial Approval
|
ROBERT COLE
|
|
Deputy Pre-Stress Concrete
|
12/4/2019
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
12/4/2019
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Pre-Stress Concrete
|
12/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/5/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
12/6/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/11/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/13/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/16/2019
|
Approved
|
MILLARD ARDOIN
|
|
Excavation/Setback/Form/Re-Bar
|
12/16/2019
|
Partial Inspection
|
MILLARD ARDOIN
|
|
Deputy Pre-Stress Concrete
|
12/17/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/17/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
12/17/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/19/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
12/20/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/23/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
12/23/2019
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
12/23/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/26/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/26/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
12/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/26/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
12/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/27/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/27/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
12/27/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/31/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/2/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/3/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/3/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
1/6/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
1/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
1/8/2020
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Masonry Frame
|
1/8/2020
|
Partial Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
1/9/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/10/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/14/2020
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/14/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/15/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/21/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/24/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
1/24/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/27/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/29/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/31/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/31/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/6/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
2/7/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
5/12/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
5/13/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Wood Construction
|
5/19/2020
|
Conditional Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
6/8/2020
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
7/20/2020
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/4/2020
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
8/4/2020
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
3/2/2021
|
Permit Finaled
|
HAMID PISHEHVAR
|
|
Footing/Foundation/Slab
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Final
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Reinforced Masonry Frame
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Smoke Detectors
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Verify Sprinkler Sign Off
|
3/2/2021
|
Approved
|
HAMID PISHEHVAR
|