21050 W KITTRIDGE ST 91303

Certificate Information: 21050 W KITTRIDGE ST 91303

Application / Permit
18010-10004-04971
Plan Check / Job No.
B19LA14902
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Supplemental to 18010-10000-04971. To capture the remaining approval and fees for the New 7-story, 395-unit, Apartment building. 5 stories of TYPE IIIA over 2-story TYPE IA podium and WITH 7 STORY TYPE IA PARKING STRUCTURE WITH ROOF TOP PARKING
Permit Issued
Issued on 7/23/2019
Issuing Office
Metro
Current Status
Permit Finaled on 3/2/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 7/23/2019 HERNAN ARREOLA
Issued 7/23/2019 LADBS
Permit Finaled 3/2/2021 HAMID PISHEHVAR

Permit Application Clearance Information

No Data Available.

Contact Information

Architect Olsen,, Eric H; Lic. No.: C27721 3802 OSTROM AVE      LONG BEACH, CA 90808
Contractor Hanover R S Construction Llc; Lic. No.: 970389-B 5847 SAN FELIPE SUITE 3600      HOUSTON, TX 77057
Engineer Kim,, Carl Chong-Soo; Lic. No.: GE2620 10246 FALL CT      TRUCKEE, CA 96161
Engineer Maingot,, Martin Rex; Lic. No.: S5623 4722 CASTLEWOOD STREET      SUGAR LAND, TX 77479

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/21/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/23/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 8/27/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 8/28/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 8/29/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/30/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/3/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 9/3/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/4/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 9/4/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/5/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/6/2019 Approved JEFFREY DURAN
Masonry Wall/Backfill 9/6/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 9/6/2019 No Access for Inspection JEFFREY DURAN
Green Building Rough 9/7/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 9/7/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 9/7/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/9/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 9/9/2019 Conditional Approval JAMES STEPHENS
Excavation/Setback/Form/Re-Bar 9/9/2019 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 9/10/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 9/10/2019 Partial Approval JEFFREY DURAN
Special/Order Compliance 9/10/2019 Corrections Issued JEFFREY DURAN
Deputy Reinf. Masonry 9/11/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/11/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/12/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/12/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 9/13/2019 Conditional Approval RICKEY JACKSON
Excavation/Setback/Form/Re-Bar 9/14/2019 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 9/14/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/16/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/16/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 9/16/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/17/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/17/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/18/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/18/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/19/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/19/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/20/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/20/2019 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/23/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 9/25/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 9/26/2019 Partial Approval JEFFREY DURAN
Green Building Rough 9/26/2019 Not Ready for Inspection JEFFREY DURAN
Green Building Rough 9/26/2019 Off-Hour Fees Due
Reinforced Concrete Frame 9/26/2019 Off-Hour Fees Due
Reinforced Concrete Frame 9/26/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 9/26/2019 Not Ready for Inspection JEFFREY DURAN
Verify Sprinkler Sign Off 9/26/2019 Off-Hour Fees Due
Deputy Pre-Stress Concrete 9/30/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/30/2019 Not Ready for Inspection ROBERT COLE
Deputy Pre-Stress Concrete 10/1/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 10/1/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/1/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/2/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/2/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/3/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/3/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 10/3/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/4/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/4/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/4/2019 Not Ready for Inspection JEFFREY DURAN
Footing/Foundation/Slab 10/5/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 10/7/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/7/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/8/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/9/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/9/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/10/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/10/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 10/10/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/11/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 10/11/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 10/11/2019 Not Ready for Inspection ROBERT COLE
Deputy Pre-Stress Concrete 10/15/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/15/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/16/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/16/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 10/17/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 10/17/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/18/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/18/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/18/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/18/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 10/21/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/21/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 10/22/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/22/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/23/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/23/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/24/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 10/24/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/25/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/25/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/28/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/28/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/29/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/29/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/30/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/30/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/31/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/31/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/4/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/4/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/4/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/4/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/4/2019 Partial Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 11/5/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/5/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 11/5/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/5/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 11/5/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/6/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/6/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/7/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/7/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/8/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/8/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/8/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/8/2019 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/12/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 11/12/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/13/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/13/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/14/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/14/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/15/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 11/15/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/15/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/18/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/18/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/19/2019 Conditional Approval RICKEY JACKSON
Deputy Pre-Stress Concrete 11/20/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/20/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 11/20/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/21/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/22/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 11/22/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 11/25/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 11/25/2019 Not Ready for Inspection ROBERT COLE
Deputy Pre-Stress Concrete 11/26/2019 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 11/26/2019 Partial Approval MILLARD ARDOIN
Deputy Pre-Stress Concrete 11/27/2019 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 11/27/2019 Partial Approval HAMID PISHEHVAR
Deputy Pre-Stress Concrete 12/2/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/2/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/3/2019 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 12/3/2019 Partial Approval ROBERT COLE
Deputy Pre-Stress Concrete 12/4/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 12/4/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 12/5/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/5/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/5/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 12/6/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/6/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/6/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 12/6/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/9/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/9/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/10/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/11/2019 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/12/2019 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 12/13/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/13/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 12/16/2019 Approved MILLARD ARDOIN
Excavation/Setback/Form/Re-Bar 12/16/2019 Partial Inspection MILLARD ARDOIN
Deputy Pre-Stress Concrete 12/17/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/17/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 12/17/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/18/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/18/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 12/19/2019 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/19/2019 Not Ready for Inspection JEFFREY DURAN
Footing/Foundation/Slab 12/20/2019 Partial Approval JOHN KITCKO
Deputy Pre-Stress Concrete 12/23/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 12/23/2019 Approved JEFFREY DURAN
Green Building Rough 12/23/2019 Partial Approval JEFFREY DURAN
Reinforced Masonry Frame 12/23/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 12/23/2019 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/24/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/26/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 12/26/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 12/26/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/26/2019 Partial Inspection JEFFREY DURAN
Footing/Foundation/Slab 12/26/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/27/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/27/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 12/27/2019 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/30/2019 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/31/2019 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/2/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/3/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/3/2020 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 1/6/2020 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 1/7/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 1/8/2020 Partial Approval DANIEL VARNUM
Reinforced Masonry Frame 1/8/2020 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 1/9/2020 Not Ready for Inspection JEFFREY DURAN
Deputy Steel/Welding 1/10/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 1/14/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/14/2020 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/15/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/16/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/21/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/22/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/24/2020 Not Ready for Inspection JEFFREY DURAN
Light Gage Steel Frame 1/24/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/27/2020 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/29/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/30/2020 Not Ready for Inspection JEFFREY DURAN
Deputy Steel/Welding 1/31/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 1/31/2020 Not Ready for Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 2/6/2020 Partial Approval JEFFREY DURAN
Deputy Steel/Welding 2/7/2020 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 5/12/2020 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 5/13/2020 Approved HAMID PISHEHVAR
Deputy Wood Construction 5/19/2020 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 6/8/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 7/20/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/4/2020 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 8/4/2020 Partial Inspection JEFFREY FULTON
Final 3/2/2021 Permit Finaled HAMID PISHEHVAR
Footing/Foundation/Slab 3/2/2021 Approved HAMID PISHEHVAR
Green Building Final 3/2/2021 Approved HAMID PISHEHVAR
Green Building Rough 3/2/2021 Approved HAMID PISHEHVAR
Reinforced Concrete Frame 3/2/2021 Approved HAMID PISHEHVAR
Reinforced Masonry Frame 3/2/2021 Approved HAMID PISHEHVAR
Smoke Detectors 3/2/2021 Approved HAMID PISHEHVAR
Verify Sprinkler Sign Off 3/2/2021 Approved HAMID PISHEHVAR