6001 W 96TH ST ITF WEST-Station 90045

Certificate Information: 6001 W 96TH ST ITF WEST-Station 90045

Application / Permit
18010-10003-04883
Plan Check / Job No.
B19LA07902
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(3) Airport Building
Work Description
LAX APM: EARLY START FOR FOUNDATION PERMIT (CIDH PILE, LOWER COLUMN AND CONCOURSE BENT CAPS) FOR NEW WEST INTERMODAL TRANSPORTATION FACILITY (ITF WEST) STATION FOR LAX AUTOMATED PEOPLE MOVER PROJECT.
Permit Issued
Issued on 8/14/2019
Issuing Office
Metro
Current Status
Permit Finaled on 9/29/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/13/2019 APPLICANT
Assigned to Plan Check Engineer 8/13/2019 JOHN FRANCIA
Corrections Issued 8/13/2019 JOHN FRANCIA
Plan Check Approved 8/14/2019 JOHN FRANCIA
Issued 8/14/2019 LADBS
Permit Finaled 9/29/2021 JONATHAN ALLEN

Permit Application Clearance Information

DAS Clearance Cleared 5/9/2019 MINYE PAK
Address approval Cleared 5/17/2019 MARYAM AZARBAYJANI
Eng Process Fee Ord 176,300 Cleared 5/17/2019 MARYAM AZARBAYJANI
Highway dedication Cleared 5/17/2019 MARYAM AZARBAYJANI
Permit Cleared 5/17/2019 MARYAM AZARBAYJANI
Roof/Waste drainage to street Cleared 5/17/2019 MARYAM AZARBAYJANI
Sewer availability Cleared 5/17/2019 MARYAM AZARBAYJANI
City owned building/parcel Cleared 6/21/2019 HAROOT AVANESIAN
CPC Cleared 6/25/2019 KIT AWAKUNI
CPC Cleared 6/26/2019 KIT AWAKUNI
CPC Cleared 6/26/2019 KIT AWAKUNI
Miscellaneous Cleared 7/2/2019 DIANA JIMENEZ
Miscellaneous Cleared 7/2/2019 DIANA JIMENEZ
Project Permit Cleared 7/3/2019 MINYE PAK
Work Adjacent to Public Way Cleared 7/10/2019 MARYAM AZARBAYJANI
Construction near power lines Cleared 7/15/2019 OSCAR CASTRO
Encroachment in public way Cleared 7/17/2019 MARYAM AZARBAYJANI
Specific Plan Cleared 7/17/2019 PEDRO AYALA
Low Impact Development Cleared 7/18/2019 ORVAL HERNANDEZ-MARCI
Trees in Parkway Cleared 7/18/2019 ADRIAN SANCHEZ
Airport buildings Cleared 7/19/2019 DOMINIQUE MEDINA
Green Code Cleared 7/23/2019 DONALD CRICHLOW
Hydrant and Access approval Cleared 7/23/2019 JOHN CONNEALLY
Building over 3-story or 36-ft Cleared 8/14/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/14/2019 CALOSHA APPROVED

Contact Information

Architect Gonzales,, Anthony Chris; Lic. No.: C19409 452 35TH STREET      MANHATTAN BEACH, CA 90266
Contractor Fluor Flatiron Balfour Beatty Dragados; Lic. No.: 1036344-B 5050 BUSINESS CENTER DRIVE   SUITE 250    FAIRFIELD, CA 94534
Engineer Fontaine,, Eric Stuart; Lic. No.: S5930 870 ANTILLA WAY      SAN MARCOS, CA 92078
Engineer Hilmy,, Said Ibrahim; Lic. No.: S3680 1 PETERS CANYON RD STE 140      IRVINE, CA 92606
Engineer Kashighandi,, Pirooz; Lic. No.: GE3104 1417 S WESTGATE AVE 207      LOS ANGELES, CA 90025
Engineer Olmedo,, Joshua Jonathan; Lic. No.: C88523 4144 IOWA ST 2      SAN DIEGO, CA 92104
Engineer Sanders,, Jason Caleb; Lic. No.: C83976 1638 1/2 EDGEMONT ST      SAN DIEGO, CA 92102
Engineer Werts,, Chester Anthony; Lic. No.: C49861 5449 40TH AVE SW      OLYMPIA, WA 98512

Inspector Information

NICK LAROCCA, (213) 473-2153 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 10/21/2019 Conditional Approval ALAN NOVAK
Deputy Grading 10/22/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/22/2019 Approved JONATHAN ALLEN
Grading Pre-Inspection 10/22/2019 Approved JONATHAN ALLEN
Piling/Pier/Caisson 10/22/2019 Partial Approval JONATHAN ALLEN
Deputy Grading 10/23/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/23/2019 Approved JONATHAN ALLEN
Grading Pre-Inspection 10/23/2019 Approved JONATHAN ALLEN
Deputy Grading 10/24/2019 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 10/24/2019 Conditional Approval JONATHAN ALLEN
Grading Pre-Inspection 10/24/2019 Not Ready for Inspection JONATHAN ALLEN
Deputy Grading 10/25/2019 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 10/25/2019 Approved JONATHAN ALLEN
Grading Pre-Inspection 10/26/2019 Off-Hour Fees Due
Deputy Reinf. Concrete 10/28/2019 Approved JONATHAN ALLEN
Deputy Grading 10/29/2019 Approved JONATHAN ALLEN
Grading Pre-Inspection 10/29/2019 Approved JONATHAN ALLEN
Piling/Pier/Caisson 10/29/2019 Off-Hour Fees Due
Piling/Pier/Caisson 10/30/2019 Partial Approval JONATHAN ALLEN
Final 10/31/2019 Off-Hour Fees Due
Green Building Final 10/31/2019 Off-Hour Fees Due
Piling/Pier/Caisson 10/31/2019 Off-Hour Fees Due
Smoke Detectors 10/31/2019 Off-Hour Fees Due
Deputy Grading 11/1/2019 Approved JONATHAN ALLEN
Final 11/1/2019 Not Ready for Inspection JONATHAN ALLEN
Green Building Final 11/1/2019 Approved JONATHAN ALLEN
Piling/Pier/Caisson 11/1/2019 Partial Approval JONATHAN ALLEN
Smoke Detectors 11/1/2019 Approved JONATHAN ALLEN
Piling/Pier/Caisson 11/2/2019 Partial Inspection TED RIES
Deputy Grading 11/4/2019 Approved JONATHAN ALLEN
Final 11/4/2019 Partial Approval JONATHAN ALLEN
Green Building Final 11/4/2019 Approved JONATHAN ALLEN
Piling/Pier/Caisson 11/4/2019 Partial Approval JONATHAN ALLEN
Smoke Detectors 11/4/2019 Approved JONATHAN ALLEN
Deputy Grading 11/5/2019 Approved JONATHAN ALLEN
Deputy Other (see comments) 11/19/2019 Approved JONATHAN ALLEN
Deputy Grading 12/2/2019 Conditional Approval JONATHAN ALLEN
Deputy Grading 12/3/2019 Approved JONATHAN ALLEN
Deputy Grading 12/4/2019 Approved JONATHAN ALLEN
Final 12/26/2019 Off-Hour Fees Due
Final 12/26/2019 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 12/26/2019 Off-Hour Fees Due
Piling/Pier/Caisson 12/26/2019 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 1/22/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 1/24/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 2/7/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 2/10/2020 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 2/12/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 3/9/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 3/10/2020 Approved JONATHAN ALLEN
Pre-Inspection 3/11/2020 Approved JONATHAN ALLEN
Pre-Inspection 3/12/2020 Approved JONATHAN ALLEN
Pre-Inspection 3/13/2020 Approved JONATHAN ALLEN
Pre-Inspection 3/16/2020 Approved JONATHAN ALLEN
Pre-Inspection 5/14/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 5/15/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 5/18/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 5/19/2020 Approved JONATHAN ALLEN
Pre-Inspection 5/26/2020 Approved JONATHAN ALLEN
Pre-Inspection 5/27/2020 Approved JONATHAN ALLEN
Pre-Inspection 5/28/2020 Approved JONATHAN ALLEN
Pre-Inspection 6/12/2020 Approved JONATHAN ALLEN
Pre-Inspection 6/29/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 6/30/2020 Approved NICK LAROCCA
Pre-Inspection 7/1/2020 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 8/3/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 8/4/2020 Approved JONATHAN ALLEN
Pre-Inspection 8/6/2020 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/7/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 8/7/2020 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/10/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 8/10/2020 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 8/11/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/11/2020 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/11/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 8/11/2020 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 8/12/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/12/2020 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 8/13/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/13/2020 Approved JONATHAN ALLEN
Pre-Inspection 8/13/2020 Approved JONATHAN ALLEN
Deputy Pre-Stress Concrete 8/14/2020 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 8/14/2020 Approved JONATHAN ALLEN
Pre-Inspection 8/14/2020 Approved JONATHAN ALLEN
Pre-Inspection 8/17/2020 Approved JONATHAN ALLEN
Pre-Inspection 8/26/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 8/27/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 8/28/2020 Not Ready for Inspection ALBERT COMISARI
Pre-Inspection 9/16/2020 Partial Approval JONATHAN ALLEN
Pre-Inspection 9/17/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/18/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/21/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/22/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/23/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/24/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/25/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/28/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/29/2020 Approved JONATHAN ALLEN
Pre-Inspection 9/30/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/1/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/2/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/7/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/8/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/9/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/13/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/14/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/15/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/19/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/20/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/21/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/23/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/26/2020 Approved JONATHAN ALLEN
Pre-Inspection 10/27/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/2/2020 Conditional Approval ALBERT COMISARI
Pre-Inspection 11/4/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/5/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/6/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/12/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/13/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/16/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/17/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/18/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/19/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/20/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/23/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/24/2020 Approved JONATHAN ALLEN
Pre-Inspection 11/25/2020 Approved JONATHAN ALLEN
Reinforced Concrete Frame 11/30/2020 Not Ready for Inspection ALBERT COMISARI
Reinforced Concrete Frame 12/1/2020 Approved JONATHAN ALLEN
Reinforced Concrete Frame 12/2/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/3/2020 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 12/4/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/7/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/8/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/9/2020 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 12/10/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/11/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/14/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/15/2020 Conditional Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/16/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/17/2020 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 12/18/2020 Not Ready for Inspection ALBERT COMISARI
Reinforced Concrete Frame 12/21/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/22/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/23/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/24/2020 Conditional Approval ALBERT COMISARI
Reinforced Concrete Frame 12/29/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/30/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 12/31/2020 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/4/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/5/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/6/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/7/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/8/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/13/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/14/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/15/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/19/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/20/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/21/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/22/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/26/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 1/27/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 1/29/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/1/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/3/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/4/2021 Partial Approval ALAN NOVAK
Reinforced Concrete Frame 2/5/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 2/8/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 2/9/2021 Approved JONATHAN ALLEN
Reinforced Concrete Frame 2/10/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/11/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/12/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/16/2021 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 2/17/2021 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 8/9/2021 Not Ready for Inspection JONATHAN ALLEN