696 S NEW HAMPSHIRE AVE 90005

Certificate Information: 696 S NEW HAMPSHIRE AVE 90005

Application / Permit
18010-10003-00973
Plan Check / Job No.
B20LA16569
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
Foundation only permit for a New 38-story mixed-use retail and 375 units residential building with subterranean parking
Permit Issued
Issued on 10/28/2020
Issuing Office
Metro
Current Status
Permit Finaled on 6/21/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/14/2020 APPLICANT
Building Plans Picked Up 10/14/2020 APPLICANT
Assigned to Plan Check Engineer 10/21/2020 LARRY LEE
Corrections Issued 10/21/2020 LARRY LEE
Applicant returned to address corrections 10/23/2020 LARRY LEE
Plan Check Approved 10/26/2020 LARRY LEE
Issued 10/28/2020 APPLICANT
Permit Finaled 6/20/2023 RAFAEL ESPINOZA

Permit Application Clearance Information

Address approval Cleared 9/10/2020 ELAINE LEI
Bicycle Parking Cleared 9/10/2020 ELAINE LEI
Frnt yard landscape/Water mgmt Cleared 9/10/2020 JOE LUCKEY
Green Code Cleared 9/10/2020 LARRY LEE
Opn space landscape/Water mgmt Cleared 9/10/2020 JOE LUCKEY
Site Plan review Cleared 9/10/2020 JOE LUCKEY
Tract Map conditions Cleared 9/10/2020 JOE LUCKEY
ZA Case Cleared 9/10/2020 JOE LUCKEY
ZA Case Cleared 9/10/2020 JOE LUCKEY
ZA Case Cleared 9/10/2020 JOE LUCKEY
ZA Case Cleared 9/10/2020 JOE LUCKEY
ZA Case Cleared 9/10/2020 JOE LUCKEY
ZA Case Cleared 9/10/2020 JOE LUCKEY
Eng Process Fee Ord 176,300 Cleared 9/14/2020 ELAINE LEI
Hydrant and Access approval Cleared 9/14/2020 KURT CORRAL
Trees in Parkway Cleared 9/16/2020 ADRIAN SANCHEZ
DAS Clearance Cleared 9/17/2020 LARRY LEE
Density Bonus 12.22.A.25 Cleared 9/17/2020 DORIS KWOK
Work Adjacent to Public Way Cleared 9/18/2020 LARRY LEE
Internal circulation Cleared 9/21/2020 TAIMOUR TANAVOLI
Fire Marshall Fire Life Safety Cleared 9/29/2020 MENOA AGHAJANI
Low Impact Development Cleared 9/29/2020 MARTIN FRAGOSO
Project located in CRA area Cleared 10/6/2020 DAVID URITA
Building over 3-story or 36-ft Cleared 10/7/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/7/2020 CALOSHA APPROVED
Methane Ordinance Cleared 10/7/2020 WILLIAM JOHNS
Miscellaneous Cleared 10/22/2020 JOE LUCKEY
Miscellaneous Cleared 10/22/2020 JOE LUCKEY

Contact Information

Architect Arambula,, Luis; Lic. No.: C26306 2712 TUCKER LANE      ROSSMOOR, CA 907204757
Contractor Holland Construction Inc; Lic. No.: 944880-B 1111 MAIN STREET STE 700      VANCOUVER, WA 98660
Engineer Cords,, Donald Alan; Lic. No.: GE2529 3553 TEXAS ST      SAN DIEGO, CA 92104
Engineer Smith,, Chris Wayne; Lic. No.: S6106 1852 CORINTH AVE #11      LOS ANGELES, CA 90025

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 12/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/10/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/10/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Methane Barrier 12/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/16/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/16/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Methane Barrier 12/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/18/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Methane Barrier 12/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/22/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 12/22/2020 Partial Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 12/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/31/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/8/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/13/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 1/13/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/20/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/21/2021 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 1/21/2021 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/22/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/29/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/29/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/4/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/5/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/5/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/8/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 2/8/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 2/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 2/12/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/12/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/16/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/16/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/24/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/26/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 2/26/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/26/2021 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/2/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/4/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/8/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/8/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/9/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/9/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 3/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/16/2021 Conditional Approval LANNY MERRICK
Deputy Shotcrete 3/16/2021 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 3/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/17/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/17/2021 Corrections Issued RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/18/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/18/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/22/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/22/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/25/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 3/25/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/26/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/26/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/26/2021 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/30/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/30/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/1/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/1/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/14/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/14/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/14/2021 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 4/15/2021 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 4/15/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/16/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/16/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/16/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/21/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/21/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/23/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/23/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/26/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/28/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 4/28/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 5/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/7/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 5/7/2021 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 5/10/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/10/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 5/10/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Methane Barrier 5/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/11/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/11/2021 Partial Approval DAVID TSAU
Deputy Pre-Stress Concrete 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/13/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/13/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/14/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/17/2021 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/17/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 5/17/2021 Off-Hour Fees Due
Reinforced Concrete Frame 5/17/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/19/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/19/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/20/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/21/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/21/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/26/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/26/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Steel/Welding 5/27/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/2/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/7/2021 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/8/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/8/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/11/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/11/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/14/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/14/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/14/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/14/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/14/2021 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/15/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/15/2021 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/15/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/15/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 6/15/2021 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/17/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/22/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/22/2021 Partial Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/23/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/23/2021 Partial Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/25/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/28/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/29/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 7/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/1/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/1/2021 Partial Approval RAFAEL ESPINOZA
Deputy Methane Barrier 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/2/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/6/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/8/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/8/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 7/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Pre-Stress Concrete 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 7/27/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/27/2021 Conditional Approval JONATHAN QUACH
Masonry Wall/Backfill 7/27/2021 Partial Approval JONATHAN QUACH
Reinforced Concrete Frame 7/27/2021 Partial Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Pre-Stress Concrete 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/28/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 7/29/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/29/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/29/2021 Partial Approval JAMES POWERS
Masonry Wall/Backfill 7/29/2021 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/29/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/30/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/30/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/3/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/3/2021 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/9/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/9/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/9/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/10/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/11/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/11/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/11/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/18/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/18/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/20/2021 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 8/20/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/20/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/25/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/25/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/27/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/27/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/31/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/31/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/31/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/7/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/8/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/15/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 9/15/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/16/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/17/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Pre-Stress Concrete 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 9/23/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Pre-Stress Concrete 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Masonry 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 9/24/2021 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 9/27/2021 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/27/2021 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/27/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/27/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/4/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/5/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/6/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/8/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/13/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/18/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 10/19/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 10/20/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/25/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/25/2021 Partial Approval RAFAEL ESPINOZA
Insulation 10/28/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/29/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/5/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/15/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/16/2021 Partial Approval RAFAEL ESPINOZA
Wall Anchors 11/18/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/24/2021 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 12/3/2021 Partial Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 12/10/2021 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/3/2022 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 2/10/2022 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/16/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/16/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/17/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/17/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/22/2022 Conditional Approval TED RIES
Deputy Steel/Welding 2/22/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 3/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/1/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/21/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/21/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/22/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/25/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/27/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/28/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Other (see comments) 4/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/29/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/2/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/3/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/4/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 5/5/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/5/2022 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/6/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/6/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/9/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/9/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/10/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/12/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/13/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/13/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/17/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/18/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/19/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/20/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/20/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/23/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/24/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/25/2022 Conditional Approval TERRY HERR
Deputy Steel/Welding 5/25/2022 Conditional Approval TERRY HERR
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Final 6/20/2023 Permit Finaled RAFAEL ESPINOZA
Green Building Final 6/20/2023 Approved RAFAEL ESPINOZA
Smoke Detectors 6/20/2023 Approved RAFAEL ESPINOZA