725 N CROFT AVE 101-404 90069

Certificate Information: 725 N CROFT AVE 101-404 90069

Application / Permit
18010-10000-06099
Plan Check / Job No.
B18LA27171
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 4 STORY , TYPE VA, 31 UNIT, TWO APARTMENT BUILDINGS WITH ROOF DECKS OVER 1 LEVEL, TYPE IA, SUBTERRANEAN PARKING GARAGE.
Permit Issued
Issued on 11/8/2019
Issuing Office
Metro
Current Status
CofO Issued on 2/16/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/18/2018 APPLICANT
Assigned to Plan Check Engineer 1/3/2019 KESETE HAREGOT
Disabled Access Plans Picked Up 1/10/2019 APPLICANT
Green Plans Picked Up 1/10/2019 APPLICANT
Corrections Issued 1/13/2019 KESETE HAREGOT
Quality Review Completed 2/4/2019 QUAN NGHIEM
Building Plans Picked Up 2/5/2019 APPLICANT
Applicant returned to address corrections 3/22/2019 KESETE HAREGOT
Applicant returned to address corrections 4/3/2019 KESETE HAREGOT
Applicant returned to address corrections 4/18/2019 KESETE HAREGOT
Applicant returned to address corrections 4/30/2019 KESETE HAREGOT
Applicant returned to address corrections 6/14/2019 KESETE HAREGOT
Applicant returned to address corrections 7/2/2019 KESETE HAREGOT
Applicant returned to address corrections 8/7/2019 KESETE HAREGOT
Plan Check Approved 11/7/2019 KESETE HAREGOT
Issued 11/8/2019 LADBS
CofO in Progress 2/10/2023 EDWIN GREGORYONA
Permit Finaled 2/16/2023 TED RIES
CofO Issued 2/16/2023 TED RIES
Permit Finaled 2/16/2023 TED RIES

Permit Application Clearance Information

Address approval Cleared 4/24/2019 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 4/24/2019 ERIK BEASLEY
Highway dedication Cleared 4/24/2019 ERIK BEASLEY
Permit Cleared 4/24/2019 ERIK BEASLEY
Hydrant and Access approval Cleared 6/24/2019 JEREMY CARTER
Driveway location Cleared 6/25/2019 EDUARDO HERMOSO
Low Impact Development Cleared 7/1/2019 AMMAR ELTAWIL
CPC Cleared 7/2/2019 SOPHIE GABEL-SCHEINBAU
Roof/Waste drainage to street Cleared 7/2/2019 DANIEL KOZUBAL
Frnt yard landscape/Water mgmt Cleared 7/15/2019 JOE LUCKEY
Green Code Cleared 7/16/2019 COLIN LOREDO
Opn space landscape/Water mgmt Cleared 7/16/2019 DIANA JIMENEZ
"Q" conditions Cleared 7/18/2019 AMANDA BRIONES
ZI Cleared 7/18/2019 AMANDA BRIONES
DAS Clearance Cleared 7/19/2019 SHINE LIN
Fire Marshall Fire Life Safety Cleared 7/24/2019 VIDAL GARCIA
Sewer availability Cleared 7/30/2019 ELENA LOPEZ
Building over 3-story or 36-ft Cleared 8/7/2019 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 9/23/2019 ROSA SILVA
Construction near power lines Cleared 11/5/2019 RIDWAN HARDY
Construction within easement Cleared 11/5/2019 RIDWAN HARDY

Contact Information

Architect Tsai,, Kuo-Huei; Lic. No.: C33710 834 S BROADWAY SUITE 1206      LOS ANGELES, CA 90014
Contractor Etco Homes Inc; Lic. No.: 879789-B 8447 WILSHIRE BLVD #400      BEVERLY HILLS, CA 902113209
Engineer Hahn,, Brandon Michael; Lic. No.: L7582 28368 CONSTELLATION RD UNIT 300      VALENCIA, CA 91355
Engineer Lamb,, Russell Craig; Lic. No.: GE2207 24592 CHRISANTA DR      MISSION VIEJO, CA 92691
Engineer Le,, Thang Huu; Lic. No.: S4978 507 MAGELLAN RD      ARCADIA, CA 91007
Geologist Trigg,, Kevin Anthony; Lic. No.: EG1619 228 AVENIDA LA CUESTA      SAN CLEMENTE, CA 92672

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 11/22/2019 Partial Inspection LARRY ARNICK
Deputy Reinf. Concrete 12/12/2019 Conditional Approval LARRY ARNICK
Pre-Inspection 1/8/2020 Partial Inspection LARRY ARNICK
Pre-Inspection 4/30/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 5/4/2020 Conditional Approval LARRY ARNICK
Pre-Inspection 5/11/2020 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 5/12/2020 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 6/25/2020 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 7/7/2020 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/16/2020 Partial Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/17/2020 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/20/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 7/21/2020 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 7/23/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Shotcrete 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/24/2020 Conditional Approval JONATHAN QUACH
Deputy Other (see comments) 8/28/2020 Conditional Approval LARRY ARNICK
Green Building Rough 9/8/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 9/8/2020 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/8/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 9/9/2020 Conditional Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 9/9/2020 Partial Approval JONATHAN QUACH
Footing/Foundation/Slab 9/10/2020 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 9/21/2020 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 9/22/2020 Approved LARRY ARNICK
Deputy Reinf. Concrete 9/23/2020 Conditional Approval LARRY ARNICK
Pre-Inspection 9/28/2020 Partial Approval LARRY ARNICK
Pre-Inspection 9/30/2020 Partial Approval LARRY ARNICK
Deputy Shotcrete 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/8/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/14/2020 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 10/15/2020 Conditional Approval LARRY ARNICK
Pre-Inspection 10/20/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 10/21/2020 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 10/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/23/2020 Conditional Approval LARRY ARNICK
Deputy Wood Construction 10/29/2020 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/29/2020 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/30/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 11/4/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 11/5/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 11/9/2020 Partial Inspection LARRY ARNICK
Deputy Reinf. Concrete 11/17/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 11/19/2020 Partial Approval RONALD PACHECO
Floor/Roof Diaphrgm/Shear Wall 12/3/2020 Partial Approval EDWIN GREGORYONA
Pre-Inspection 1/5/2021 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/6/2021 Partial Approval LARRY ARNICK
Pre-Inspection 1/6/2021 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/7/2021 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/8/2021 Partial Inspection LARRY ARNICK
Deputy Wood Construction 1/11/2021 Conditional Approval LARRY ARNICK
Pre-Inspection 1/11/2021 Partial Approval LARRY ARNICK
Pre-Inspection 1/27/2021 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 2/2/2021 Partial Approval LARRY ARNICK
Green Building Rough 2/9/2021 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/9/2021 Partial Inspection EDWIN GREGORYONA
Wood Frame 2/9/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/18/2021 Partial Inspection EDWIN GREGORYONA
Green Building Rough 2/23/2021 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/23/2021 Partial Inspection EDWIN GREGORYONA
Wood Frame 2/23/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/26/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 3/12/2021 Partial Approval EDWIN GREGORYONA
Insulation 3/19/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/23/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/9/2021 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/9/2021 Partial Inspection EDWIN GREGORYONA
Wood Frame 4/9/2021 Partial Inspection EDWIN GREGORYONA
Green Building Rough 4/20/2021 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/20/2021 Approved EDWIN GREGORYONA
Wood Frame 4/20/2021 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 4/22/2021 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/29/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/3/2021 Partial Approval JONATHAN QUACH
Green Building Rough 5/3/2021 Not Ready for Inspection JONATHAN QUACH
Deputy Wood Construction 5/5/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/5/2021 Partial Inspection EDWIN GREGORYONA
Deputy Wood Construction 5/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 5/14/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/19/2021 Approved EDWIN GREGORYONA
Wood Frame 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/7/2021 Partial Approval EDWIN GREGORYONA
Pre-Inspection 6/7/2021 No Access for Inspection EDWIN GREGORYONA
Wood Frame 6/8/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 6/14/2021 No Access for Inspection EDWIN GREGORYONA
Wood Frame 6/15/2021 Partial Inspection EDWIN GREGORYONA
Wood Frame 6/18/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 6/23/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 6/24/2021 Partial Approval EDWIN GREGORYONA
Pre-Inspection 6/30/2021 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 7/2/2021 Partial Approval JONATHAN QUACH
Drywall Nailing 7/12/2021 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 7/19/2021 Partial Approval EDWIN GREGORYONA
Wood Frame 7/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/30/2021 Conditional Approval JONATHAN QUACH
Drywall Nailing 8/4/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/17/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/25/2021 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 9/1/2021 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 9/3/2021 Approved EDWIN GREGORYONA
Drywall Nailing 9/8/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/13/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/22/2021 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 10/13/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/29/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/8/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/17/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/22/2021 Partial Inspection EDWIN GREGORYONA
Pre-Inspection 1/25/2022 Approved EDWIN GREGORYONA
Special/Order Compliance 6/8/2022 Approved EDWIN GREGORYONA
Final 7/26/2022 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 7/26/2022 Approved EDWIN GREGORYONA
Green Building Final 7/26/2022 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 7/26/2022 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 7/26/2022 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 7/26/2022 Partial Inspection EDWIN GREGORYONA
Wood Frame 7/26/2022 Approved EDWIN GREGORYONA
Final 9/21/2022 Partial Inspection EDWIN GREGORYONA
Green Building Final 9/21/2022 Not Ready for Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 9/21/2022 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 9/21/2022 Approved EDWIN GREGORYONA
Special/Order Compliance 1/31/2023 Approved EDWIN GREGORYONA
Final 2/9/2023 Conditional Approval EDWIN GREGORYONA
Green Building Final 2/9/2023 Approved EDWIN GREGORYONA
Pre-Inspection 2/9/2023 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 2/9/2023 SGSOV Approved EDWIN GREGORYONA