1808 S LINCOLN BLVD 1-50 90291

Certificate Information: 1808 S LINCOLN BLVD 1-50 90291

Application / Permit
18010-10000-05928
Plan Check / Job No.
B18LA26514
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PDPP. New 5-story mixed use TOC Tier III 50-unit apartment building: 4-story 50-residential units (Type IIIA) over 1-level (Type 1A) commercial use on grade level over 2-level of subterranean parking garage.
Permit Issued
Issued on 8/10/2022
Issuing Office
Metro
Current Status
Issued on 8/10/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/11/2018 APPLICANT
Assigned to Plan Check Engineer 1/3/2019 TU HUA
Corrections Issued 1/16/2019 TU HUA
Quality Review Completed 1/24/2019 BILL STUTSMAN
Building Plans Picked Up 1/31/2019 APPLICANT
Applicant returned to address corrections 9/29/2020 TU HUA
Applicant returned to address corrections 12/22/2020 TU HUA
Applicant returned to address corrections 12/22/2020 HERNAN ARREOLA
Applicant returned to address corrections 9/9/2021 TU HUA
Applicant returned to address corrections 12/21/2021 TU HUA
Applicant returned to address corrections 1/14/2022 TU HUA
Applicant returned to address corrections 1/20/2022 TU HUA
Applicant returned to address corrections 7/29/2022 TU HUA
Plan Check Approved 8/10/2022 TU HUA
Plan Check Approved 8/10/2022 TU HUA
Plan Check Approved 8/10/2022 TU HUA
Issued 8/10/2022 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 5/3/2021 CATHERINE ADROVER
Permit Cleared 5/24/2021 HISASHI KOBAYAKAWA
Address approval Cleared 5/26/2021 HISASHI KOBAYAKAWA
Highway dedication Cleared 6/22/2021 RAYMOND MUGAMBWA
Trees in Parkway Cleared 6/30/2021 JOHN KIM
Building over 3-story or 36-ft Cleared 7/6/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/6/2021 CALOSHA APPROVED
Hydrant and Access approval Cleared 7/15/2021 JOHN CONNEALLY
Driveway location Cleared 7/28/2021 PEDRO AYALA
Specific Plan Cleared 7/28/2021 PEDRO AYALA
Disturb/Remove Protected Trees Cleared 8/17/2021 ADRIAN SANCHEZ
Green Code Cleared 9/22/2021 TU HUA
DCP conditions approval Cleared 10/14/2021 NICHOLAS KAWAZOE
Density Bonus 12.22.A.31 Cleared 10/14/2021 NICHOLAS KAWAZOE
Low Impact Development Cleared 12/28/2021 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 1/20/2022 DENNIS BRAGIN
Sewer availability Cleared 3/9/2022 DINAH GARIN
Fire Marshall Fire Life Safety Cleared 4/19/2022 VIDAL GARCIA
Frnt yard landscape/Water mgmt Cleared 5/4/2022 MAXFIELD VERMY
Miscellaneous Cleared 5/4/2022 MAXFIELD VERMY
Miscellaneous Cleared 5/4/2022 MAXFIELD VERMY
Miscellaneous Cleared 5/4/2022 MAXFIELD VERMY
Miscellaneous Cleared 5/4/2022 MAXFIELD VERMY
Supp. Use District POD/CDO/TDO Cleared 5/4/2022 MAXFIELD VERMY
ZI Cleared 5/4/2022 MAXFIELD VERMY
"Q" conditions Cleared 5/5/2022 MAXFIELD VERMY
Comm Cor/Mini-Mall Cleared 5/5/2022 MAXFIELD VERMY
Miscellaneous Cleared 5/5/2022 MAXFIELD VERMY
DAS Clearance Cleared 7/13/2022 TU HUA
Encroachment in public way Cleared 7/25/2022 TRACY TATE
Work Adjacent to Public Way Cleared 7/25/2022 SAUL GARCIA

Contact Information

Architect Reed,, John G; Lic. No.: C14523 657 ROSE AVENUE      VENICE, CA 90291
Contractor Focus Builders Inc; Lic. No.: 990023-B 3375 LIVONIA AVE      LOS ANGELES, CA 90034
Engineer Dejban,, Masoud; Lic. No.: S2521 17200 VENTURA BLVD STE 213A      ENCINO, CA 91316

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Other (see comments) 9/1/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 11/3/2022 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 11/3/2023 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 11/3/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 11/6/2023 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 12/13/2023 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 12/26/2023 Corrections Issued DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 1/11/2024 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 1/11/2024 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 1/17/2024 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 1/19/2024 Approved DERRICK SPENCER
Deputy Reinf. Concrete 1/19/2024 Conditional Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 1/29/2024 Partial Approval FARHAD DADBIN
Excavation/Setback/Form/Re-Bar 1/30/2024 Partial Approval DERRICK SPENCER
Deputy Shotcrete 1/31/2024 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 1/31/2024 Partial Approval FARHAD DADBIN
Deputy Shotcrete 2/9/2024 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 2/9/2024 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 2/12/2024 Conditional Approval DERRICK SPENCER
Deputy Shotcrete 2/12/2024 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 2/20/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 2/21/2024 Approved DERRICK SPENCER
Deputy Reinf. Concrete 2/22/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 2/22/2024 Approved DERRICK SPENCER
Deputy Shotcrete 2/22/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 2/23/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 2/26/2024 Approved JOEY BUCHANAN
Masonry Wall/Backfill 2/26/2024 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 2/27/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 3/15/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 3/19/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 3/19/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 3/21/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 3/22/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 3/22/2024 Not Ready for Inspection PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 3/25/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 3/27/2024 Approved DERRICK SPENCER
Deputy Reinf. Concrete 3/28/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 3/29/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 4/4/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 4/8/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 4/8/2024 Partial Approval PAUL DAVIDSON
Deputy Shotcrete 4/9/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/10/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 4/10/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/11/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 4/11/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/12/2024 Approved DERRICK SPENCER
Deputy Shotcrete 4/12/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/15/2024 Approved DERRICK SPENCER
Deputy Shotcrete 4/15/2024 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 4/15/2024 Partial Approval DERRICK SPENCER
Deputy Reinf. Masonry 4/16/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/17/2024 Approved DERRICK SPENCER
Deputy Shotcrete 4/17/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/18/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/19/2024 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/22/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/23/2024 Conditional Approval PAUL DAVIDSON
Masonry Wall/Backfill 4/23/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 4/24/2024 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 4/30/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/7/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 5/7/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 5/8/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 5/14/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 5/15/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 5/16/2024 Partial Approval PAUL DAVIDSON
Deputy Shotcrete 5/17/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 5/20/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 5/21/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 5/22/2024 Conditional Approval PAUL DAVIDSON
Masonry Wall/Backfill 5/22/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 5/24/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/30/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 5/30/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 5/31/2024 Conditional Approval FARHAD DADBIN
Excavation/Setback/Form/Re-Bar 6/3/2024 Not Ready for Inspection PAUL DAVIDSON
Deputy Reinf. Concrete 6/5/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 6/5/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 6/10/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 6/11/2024 Not Ready for Inspection PAUL DAVIDSON
Green Building Rough 6/12/2024 Not Ready for Inspection GRANT WOODS
Reinforced Concrete Frame 6/12/2024 Partial Approval GRANT WOODS
Verify Sprinkler Sign Off 6/12/2024 Not Ready for Inspection GRANT WOODS
Excavation/Setback/Form/Re-Bar 6/20/2024 Not Ready for Inspection PAUL DAVIDSON
Deputy Shotcrete 6/24/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 6/24/2024 Partial Approval PAUL DAVIDSON
Deputy Shotcrete 6/25/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 6/26/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 6/26/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 6/27/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 6/27/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 6/28/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 6/28/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 6/28/2024 Partial Approval PAUL DAVIDSON
Green Building Rough 6/28/2024 Not Ready for Inspection PAUL DAVIDSON
Verify Sprinkler Sign Off 6/28/2024 Not Ready for Inspection PAUL DAVIDSON
Deputy Reinf. Masonry 7/1/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/2/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/3/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/8/2024 Conditional Approval PAUL DAVIDSON
Footing/Foundation/Slab 7/8/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 7/9/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/9/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 7/9/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/10/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/11/2024 Conditional Approval PAUL DAVIDSON
Masonry Wall/Backfill 7/11/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 7/12/2024 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Masonry 7/12/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 7/19/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 7/22/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 7/23/2024 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 7/24/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 7/24/2024 Partial Approval PAUL DAVIDSON
Deputy Shotcrete 7/25/2024 Conditional Approval PAUL DAVIDSON
Deputy Other (see comments) 8/8/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 8/9/2024 Partial Inspection PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 8/14/2024 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 8/15/2024 Conditional Approval PAUL DAVIDSON
Deputy Other (see comments) 8/19/2024 Approved DERRICK SPENCER
Deputy Other (see comments) 8/20/2024 Conditional Approval PAUL DAVIDSON
Deputy Other (see comments) 8/21/2024 Conditional Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 8/21/2024 Partial Approval PAUL DAVIDSON
Deputy Reinf. Concrete 8/22/2024 Conditional Approval PAUL DAVIDSON
Drywall Nailing 9/5/2024 Partial Approval DERRICK SPENCER
Green Building Rough 9/5/2024 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 9/5/2024 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 9/18/2024 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 9/24/2024 Not Ready for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 9/24/2024 Partial Approval DANIEL VARNUM
Green Building Rough 9/24/2024 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 9/24/2024 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 10/15/2024 Partial Approval JOEY BUCHANAN
Drywall Nailing 10/17/2024 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 10/17/2024 Partial Approval DANIEL VARNUM
Green Building Rough 10/17/2024 Not Ready for Inspection DANIEL VARNUM
Deputy Drilled-In Anchors 10/21/2024 Conditional Approval DANIEL VARNUM
Masonry Wall/Backfill 10/24/2024 Partial Inspection DANIEL VARNUM
Deputy Reinf. Masonry 10/28/2024 Conditional Approval PAUL DAVIDSON
Drywall Nailing 11/5/2024 No Access for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 11/5/2024 Partial Approval DANIEL VARNUM
Green Building Rough 11/5/2024 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 11/7/2024 Partial Inspection ALAN NOVAK
Green Building Rough 11/7/2024 Partial Approval FARHAD DADBIN
Special/Order Compliance 11/15/2024 Partial Inspection PAUL DAVIDSON
Deputy Reinf. Concrete 11/22/2024 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 11/27/2024 Partial Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 12/16/2024 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 1/2/2025 Partial Approval DANIEL VARNUM
Insulation 1/10/2025 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 1/14/2025 Partial Approval DERRICK SPENCER
Drywall Nailing 1/21/2025 No Access for Inspection DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 1/21/2025 No Access for Inspection DANIEL VARNUM
Green Building Rough 1/21/2025 No Access for Inspection DANIEL VARNUM
Insulation 1/29/2025 Partial Approval DANIEL VARNUM
Insulation 1/31/2025 Partial Approval DERRICK SPENCER
Insulation 2/4/2025 Partial Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 2/18/2025 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 2/24/2025 Partial Approval DANIEL VARNUM
Green Building Rough 3/25/2025 Not Ready for Inspection DANIEL VARNUM
Insulation 3/25/2025 Partial Approval DANIEL VARNUM
Verify Sprinkler Sign Off 3/25/2025 Not Ready for Inspection DANIEL VARNUM
Wood Frame 3/25/2025 Not Ready for Inspection DANIEL VARNUM
Drywall Nailing 3/28/2025 Not Ready for Inspection PAUL DAVIDSON
Green Building Rough 3/28/2025 Approved PAUL DAVIDSON
Insulation 3/28/2025 Not Ready for Inspection PAUL DAVIDSON
Verify Sprinkler Sign Off 3/28/2025 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 4/1/2025 Partial Approval PAUL DAVIDSON
Insulation 4/1/2025 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/4/2025 Partial Approval FARHAD DADBIN
Drywall Nailing 4/11/2025 Partial Approval DERRICK SPENCER
Insulation 4/11/2025 Partial Approval DERRICK SPENCER
Drywall Nailing 4/22/2025 Partial Approval DERRICK SPENCER
Drywall Nailing 5/6/2025 Partial Approval DANIEL VARNUM
Interior/Exterior Lathing 5/6/2025 Approved DANIEL VARNUM
Drywall Nailing 5/16/2025 Partial Approval RICARDO ROBLES
Interior/Exterior Lathing 5/16/2025 Partial Approval RICARDO ROBLES
Drywall Nailing 6/4/2025 Not Ready for Inspection PAUL DAVIDSON
Drywall Nailing 6/10/2025 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 7/3/2025 Partial Inspection PAUL DAVIDSON
Drywall Nailing 7/24/2025 Partial Inspection DANIEL VARNUM
Special/Order Compliance 12/3/2025 Partial Inspection PAUL DAVIDSON
Special/Order Compliance 12/12/2025 Partial Approval PAUL DAVIDSON
Insulation 3/10/2026 Approved PAUL DAVIDSON
Light Gage Steel Frame 3/10/2026 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/24/2026 Not Ready for Inspection PAUL DAVIDSON
Final 4/24/2026 Not Ready for Inspection PAUL DAVIDSON
Footing/Foundation/Slab 4/24/2026 Approved PAUL DAVIDSON
Green Building Final 4/24/2026 Not Ready for Inspection PAUL DAVIDSON
Reinforced Concrete Frame 4/24/2026 Approved PAUL DAVIDSON
Reinforced Masonry Frame 4/24/2026 Approved PAUL DAVIDSON
SGSOV-Seismic Gas S/O Valve 4/24/2026 SGSOV Not Ready PAUL DAVIDSON
Smoke Detectors 4/24/2026 Not Ready for Inspection PAUL DAVIDSON
Verify Sprinkler Sign Off 4/24/2026 Approved PAUL DAVIDSON
Wood Frame 4/24/2026 Approved PAUL DAVIDSON
Pre-Inspection 4/27/2026 Partial Inspection PAUL DAVIDSON