905 S VERMONT AVE 90006

Certificate Information: 905 S VERMONT AVE 90006

Application / Permit
18010-10000-05899
Plan Check / Job No.
B18LA26353
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 7-STORY MIXED USE BUIDLING WITH BASEMENT AND ROOF DECK - TYPE I-A CONSTRUCTION IN BASEMENT GARAGE, 1ST FLOOR GARAGE, RETAIL SPACE, AND 67 RESIDENTIAL UNITS PER TOC TIER-3 ON 2ND THROUGH 7TH FLOOR, AND TYPE III-A CONSTRUCTION FROM 3RD THROUGH 7TH FLOOR RESIDENT.
Permit Issued
Issued on 1/8/2020
Issuing Office
Metro
Current Status
CofO Issued on 9/13/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/7/2018 APPLICANT
Disabled Access Plans Picked Up 1/9/2019 APPLICANT
Green Plans Picked Up 1/9/2019 APPLICANT
Assigned to Plan Check Engineer 1/10/2019 SAM CHANG
Corrections Issued 2/12/2019 SAM CHANG
Quality Review Completed 3/1/2019 QUAN NGHIEM
Building Plans Picked Up 3/5/2019 APPLICANT
Applicant returned to address corrections 4/17/2019 SAM CHANG
Applicant returned to address corrections 4/24/2019 SAM CHANG
Applicant returned to address corrections 8/21/2019 SAM CHANG
Applicant returned to address corrections 9/3/2019 SAM CHANG
Applicant returned to address corrections 12/24/2019 SAM CHANG
Plan Check Approved 1/8/2020 SAM CHANG
Issued 1/8/2020 LADBS
CofO Issued 9/13/2024 ERNESTO CORRAL
Permit Finaled 9/13/2024 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 3/21/2019 JOHN LIN
Site Plan review Cleared 4/18/2019 ANNA VAN
Trees in Parkway Cleared 4/18/2019 JOHN KIM
ZA Case Cleared 4/18/2019 ANNA VAN
Project located in CRA area Cleared 4/30/2019 JIM URQUHART
Hydrant and Access approval Cleared 5/1/2019 ROBERT DUFF
Eng Process Fee Ord 176,300 Cleared 5/9/2019 ERIK BEASLEY
Sewer availability Cleared 5/9/2019 ERIK BEASLEY
Highway dedication Cleared 5/13/2019 CELINA MORENO
Driveway location Cleared 5/22/2019 MOHAMMAD HASAN
Internal circulation Cleared 5/22/2019 MOHAMMAD HASAN
Building over 3-story or 36-ft Cleared 5/30/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 5/30/2019 CALOSHA APPROVED
Permit Cleared 7/9/2019 LEE GUILBEAUX
Low Impact Development Cleared 7/19/2019 RYAN HUDSON
Roof/Waste drainage to street Cleared 8/1/2019 KARAN PATEL
Bicycle Parking Cleared 10/3/2019 ELENA LOPEZ
DAS Clearance Cleared 10/11/2019 WAI LAU
Green Code Cleared 10/11/2019 COLIN LOREDO
Density Bonus 12.22.A.31 Cleared 10/17/2019 MICHAEL ZIRBES
Opn space landscape/Water mgmt Cleared 10/21/2019 ANNA VAN
Work Adjacent to Public Way Cleared 10/22/2019 ARMEN SARKISIAN
Fire Marshall Fire Life Safety Cleared 12/24/2019 OSCAR SALGADO JR

Contact Information

Architect Carson, Han, William; Lic. No.: C31806 3528 MULTIVIEW DRIVE      LOS ANGELES, CA 90068
Contractor Rogo Consulting Inc; Lic. No.: 800042-B 8126 W 4TH ST      LOS ANGELES, CA 90048
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804
Engineer Irvine,, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD STE 1      PASADENA, CA 91107
Landscape Architect Mays,, Andrew Hugh; Lic. No.: LA3491 266 JUNG LN      FREDERICKSURG, TX 78624

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/7/2020 Approved RAFAEL ESPINOZA
Pre-Inspection 2/11/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/28/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 6/24/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/18/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/18/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 8/20/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 8/20/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/27/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/27/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/31/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 8/31/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/2/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/10/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/22/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/22/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/6/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/6/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/13/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/14/2020 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 10/30/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/30/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 11/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/10/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/13/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/17/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/18/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/18/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/19/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/20/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/1/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 12/1/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/1/2020 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 12/1/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/2/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 12/2/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/2/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/3/2020 Conditional Approval NICK DANERI
Deputy Shotcrete 12/3/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/17/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/22/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/22/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 12/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/8/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/11/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/11/2021 Corrections Issued RAFAEL ESPINOZA
Deputy Shotcrete 1/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/15/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 1/15/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/20/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 1/20/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/26/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/27/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/1/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/3/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/9/2021 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/12/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/16/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 2/16/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/17/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 2/17/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 2/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 2/26/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 2/26/2021 Partial Approval JAMES POWERS
Deputy Shotcrete 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/3/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/4/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/5/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 3/5/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/5/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/10/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 3/10/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/11/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 3/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/21/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/28/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/29/2021 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/30/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/30/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/4/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/18/2021 Conditional Approval NICK DANERI
Deputy Shotcrete 5/19/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 5/19/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/19/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/20/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 5/21/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/24/2021 Conditional Approval NICK DANERI
Reinforced Concrete Frame 5/25/2021 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/9/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/29/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/28/2021 Partial Inspection JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 8/6/2021 Partial Approval JAMES POWERS
Drywall Nailing 8/20/2021 Partial Approval JAMES POWERS
Wood Frame 8/30/2021 Partial Approval JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 9/20/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/24/2021 Partial Inspection DAVID BURKHEAD
Wood Frame 10/12/2021 Partial Approval DAVID TSAU
Pre-Inspection 11/3/2021 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/8/2021 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 11/8/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 11/22/2021 Partial Approval BRUCE CAMPBELL
Wood Frame 12/2/2021 Partial Approval NICK DANERI
Insulation 12/8/2021 Partial Approval NICK DANERI
Wood Frame 12/17/2021 Partial Approval NICK DANERI
Drywall Nailing 12/28/2021 Partial Approval NICK DANERI
Wood Frame 2/9/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/24/2022 Not Ready for Inspection NICK DANERI
Wood Frame 2/28/2022 Partial Approval NICK DANERI
Wood Frame 3/1/2022 Not Ready for Inspection NICK DANERI
Wood Frame 3/18/2022 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 3/21/2022 Partial Approval NICK DANERI
Wood Frame 4/15/2022 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/3/2022 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 5/3/2022 Not Ready for Inspection NICK DANERI
Wood Frame 5/16/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/19/2022 Partial Approval JAMES POWERS
Insulation 5/20/2022 Partial Inspection ERNESTO CORRAL
Insulation 5/27/2022 Partial Approval JAMES POWERS
Insulation 5/31/2022 Partial Approval JAMES POWERS
Interior/Exterior Lathing 6/7/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 6/17/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/21/2022 Not Ready for Inspection NICK DANERI
Wood Frame 6/27/2022 Partial Approval NICK DANERI
Pre-Inspection 7/7/2022 Partial Approval NICK DANERI
Drywall Nailing 7/8/2022 Partial Approval NICK DANERI
Insulation 7/12/2022 Partial Approval NICK DANERI
Wood Frame 7/22/2022 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/25/2022 Partial Approval JAMES POWERS
Wood Frame 7/26/2022 Partial Approval NICK DANERI
Drywall Nailing 8/5/2022 Partial Approval NICK DANERI
Wood Frame 8/9/2022 Partial Approval NICK DANERI
Drywall Nailing 8/30/2022 Partial Approval NICK DANERI
Insulation 9/6/2022 Partial Approval GREGORY POMISH
Wood Frame 9/6/2022 Partial Approval GREGORY POMISH
Drywall Nailing 9/19/2022 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 9/26/2022 Partial Inspection NICK DANERI
Insulation 10/14/2022 Partial Approval GREGORY POMISH
Wood Frame 10/14/2022 Partial Approval GREGORY POMISH
Drywall Nailing 10/27/2022 Partial Approval GREGORY POMISH
Drywall Nailing 11/2/2022 Partial Approval NICK DANERI
Light Gage Steel Frame 1/5/2023 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 1/10/2023 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/31/2023 Partial Approval NICK DANERI
Interior/Exterior Lathing 2/9/2023 Partial Approval TED RIES
Drywall Nailing 2/22/2023 Partial Approval NICK DANERI
Reinforced Concrete Frame 3/3/2023 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/3/2023 Not Ready for Inspection NICK DANERI
Drywall Nailing 3/7/2023 Partial Approval NICK DANERI
Special/Order Compliance 3/14/2023 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 3/17/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 4/6/2023 Partial Approval GREGORY POMISH
Special/Order Compliance 5/25/2023 Partial Inspection NICK DANERI
Light Gage Steel Frame 6/5/2023 Partial Approval NICK DANERI
Drywall Nailing 6/16/2023 Partial Approval NICK DANERI
Drywall Nailing 6/27/2023 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/11/2023 Approved LARRY ARNICK
Interior/Exterior Lathing 7/13/2023 Approved LARRY ARNICK
Light Gage Steel Frame 8/22/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/25/2023 Partial Approval ADAM BURGESS
Special/Order Compliance 9/8/2023 Partial Inspection NICK DANERI
Drywall Nailing 9/22/2023 Partial Inspection GREGORY POMISH
Final 9/26/2023 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 9/26/2023 Approved GREGORY POMISH
Green Building Final 9/26/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 9/26/2023 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 9/26/2023 Not Ready for Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 9/26/2023 SGSOV Approved GREGORY POMISH
Smoke Detectors 9/26/2023 Not Ready for Inspection GREGORY POMISH
Verify Rec and Parks Fee Memo 9/26/2023 Approved GREGORY POMISH
Verify Sprinkler Sign Off 9/26/2023 Not Ready for Inspection GREGORY POMISH
Pre-Inspection 9/27/2023 Partial Inspection GREGORY POMISH
Final 11/14/2023 Not Ready for Inspection NICK DANERI
Green Building Final 11/14/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 11/14/2023 Partial Inspection NICK DANERI
Reinforced Masonry Frame 11/14/2023 Partial Inspection NICK DANERI
Smoke Detectors 11/14/2023 Partial Inspection NICK DANERI
Verify Sprinkler Sign Off 11/14/2023 Partial Inspection NICK DANERI
Final 11/21/2023 Not Ready for Inspection NICK DANERI
Green Building Final 11/21/2023 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 11/21/2023 Partial Inspection NICK DANERI
Reinforced Masonry Frame 11/21/2023 Not Ready for Inspection NICK DANERI
Smoke Detectors 11/21/2023 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 11/21/2023 Not Ready for Inspection NICK DANERI
Final 12/7/2023 Partial Inspection GREGORY POMISH
Green Building Final 12/7/2023 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 12/7/2023 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 12/7/2023 Partial Inspection GREGORY POMISH
Smoke Detectors 12/7/2023 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 12/7/2023 Partial Inspection GREGORY POMISH
Special/Order Compliance 12/12/2023 Partial Approval GREGORY POMISH
Special/Order Compliance 12/14/2023 Partial Inspection NICK DANERI
Final 1/23/2024 Not Ready for Inspection NICK DANERI
Green Building Final 1/23/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 1/23/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 1/23/2024 Not Ready for Inspection NICK DANERI
Smoke Detectors 1/23/2024 Approved NICK DANERI
Verify Sprinkler Sign Off 1/23/2024 Not Ready for Inspection NICK DANERI
Final 3/15/2024 Partial Inspection NICK DANERI
Green Building Final 3/15/2024 Approved NICK DANERI
Reinforced Concrete Frame 3/15/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 3/15/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 3/15/2024 Not Ready for Inspection NICK DANERI
Final 3/28/2024 OK for TCO NICK DANERI
Reinforced Concrete Frame 3/28/2024 Approved NICK DANERI
Reinforced Masonry Frame 3/28/2024 Approved NICK DANERI
Verify Sprinkler Sign Off 3/28/2024 Approved NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/29/2024 Approved NICK DANERI
Special/Order Compliance 3/29/2024 Conditional Approval NICK DANERI
Verify Rec and Parks Fee Memo 3/29/2024 Approved NICK DANERI
Special/Order Compliance 8/8/2024 Not Ready for Inspection NICK DANERI
Final 9/5/2024 Not Ready for Inspection NICK DANERI
Special/Order Compliance 9/6/2024 Conditional Approval NICK DANERI