2401 N TRACY TER 90027

Certificate Information: 2401 N TRACY TER 90027

Application / Permit
18010-10000-05644
Plan Check / Job No.
B18LA25323
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 17'-0'' X 27'-0'' DETACHED ACCESSORY DWELLING UNIT (424 SQFT.0 PER AB 2299 AND SB 1069. STATE APPROVED FACTORY BUILT HOUSING WITH 500 SQFT. BASEMENT GARAGE.
Permit Issued
Issued on 4/2/2019
Issuing Office
Metro
Current Status
CofO Issued on 5/11/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/27/2018 APPLICANT
Green Plans Picked Up 12/11/2018 APPLICANT
Assigned to Plan Check Engineer 12/14/2018 ADAM HEGAZI
Corrections Issued 12/26/2018 ADAM HEGAZI
Quality Review Completed 12/27/2018 MOHAMMAD FIROUZBAKHT
Building Plans Picked Up 1/8/2019 APPLICANT
Plan Check Approved 3/15/2019 ADAM HEGAZI
Issued 4/2/2019 LADBS
CofO in Progress 5/7/2021 JOSEPH MCGARRY
Permit Finaled 5/11/2021 DEROLD HAUFF
CofO Issued 5/11/2021 DEROLD HAUFF
Permit Finaled 5/11/2021 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 1/23/2019 PATRICK MISCHLICH
Address approval Cleared 2/8/2019 JAMES MORALEZ
BHO/Hillside ordinance Cleared 2/8/2019 JAMES MORALEZ
Eng Process Fee Ord 176,300 Cleared 2/8/2019 JAMES MORALEZ
Permit Cleared 2/8/2019 JAMES MORALEZ
Sewer availability Cleared 2/8/2019 JAMES MORALEZ
Hydrant and Access approval Cleared 2/22/2019 GEORGE SUCHAND
Trees in Parkway Cleared 2/26/2019 JOHN KIM
Green Code Cleared 3/12/2019 ADAM HEGAZI
BHO/Hillside ordinance Cleared 3/13/2019 ADRIAN SANCHEZ
BHO/Hillside ordinance Cleared 3/13/2019 ADRIAN SANCHEZ
Low Impact Development Cleared 3/13/2019 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 3/13/2019 ADRIAN SANCHEZ
GPI Written Notices Cleared 3/15/2019 ADAM HEGAZI

Contact Information

Contractor Cover Technologies Inc Dba Cover Building Technologies; Lic. No.: 1039029-B 1219 W 135TH STREET      GARDENA, CA 90247
Engineer Behnam,, Peter George; Lic. No.: S4678 722 N LUCIA AVE UNIT A      REDONDO BEACH, CA 90277

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/2/2019 Corrections Issued BRAD BESCOS
Deputy Reinf. Concrete 1/15/2020 No Access for Inspection BRAD BESCOS
ELECTRICAL-Rough 1/15/2020 Corrections Issued JOAQUIN GREENOUGH
PLUMBING-Rough 1/15/2020 Corrections Issued JOAQUIN GREENOUGH
Piling/Pier/Caisson 1/15/2020 Corrections Issued JOAQUIN GREENOUGH
ELECTRICAL-Rough 1/24/2020 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 1/24/2020 Partial Approval JOSEPH MCGARRY
Piling/Pier/Caisson 1/24/2020 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 1/27/2020 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 1/30/2020 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 2/27/2020 Corrections Issued JOSEPH MCGARRY
ELECTRICAL-Rough 3/9/2020 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 3/9/2020 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 3/11/2020 Partial Approval JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 4/17/2020 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 4/22/2020 Conditional Approval CHRISTOPHER DELLEFIELD
ELECTRICAL-Rough 6/11/2020 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 6/11/2020 Not Ready for Inspection JOSEPH MCGARRY
Gas Test 6/19/2020 Approved JOSEPH MCGARRY
PLUMBING-Rough 6/19/2020 Partial Approval JOSEPH MCGARRY
Sewer 7/20/2020 Approved ARTHUR SARGSYAN
Deputy Drilled-In Anchors 8/31/2020 Partial Approval JOSEPH MCGARRY
Deputy Reinf. Concrete 9/3/2020 Conditional Approval DAVID FEILER
Deputy Reinf. Concrete 9/22/2020 No Access for Inspection ELMER BLAND
PLUMBING-Rough 11/19/2020 Partial Approval JOSEPH MCGARRY
Sewer 11/19/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 12/11/2020 No Access for Inspection ELMER BLAND
Floor/Roof Diaphrgm/Shear Wall 2/16/2021 Approved JOSEPH MCGARRY
Light Gage Steel Frame 2/16/2021 Approved JOSEPH MCGARRY
PLUMBING-Rough 2/16/2021 Approved JOSEPH MCGARRY
Structural Steel Frame 2/16/2021 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 3/4/2021 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 3/4/2021 Off-Hour Fees Due
Drywall Nailing 3/27/2021 Approved JOSEPH MCGARRY
Drywall Nailing 3/27/2021 Off-Hour Fees Due
ELECTRICAL-Rough 3/27/2021 Approved JOSEPH MCGARRY
ELECTRICAL-Rough 3/27/2021 Off-Hour Fees Due
Insulation 3/27/2021 Approved JOSEPH MCGARRY
Insulation 3/27/2021 Off-Hour Fees Due
PLUMBING-Rough 3/27/2021 Approved JOSEPH MCGARRY
PLUMBING-Rough 3/27/2021 Off-Hour Fees Due
Drywall Nailing 3/28/2021 Off-Hour Fees Due
BUILDING-Rough-Frame 3/30/2021 Approved JOSEPH MCGARRY
Final 3/30/2021 Not Ready for Inspection JOSEPH MCGARRY
Green Building Final 3/30/2021 Approved JOSEPH MCGARRY
Green Building Rough 3/30/2021 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 3/30/2021 SGSOV Not Ready JOSEPH MCGARRY
Service/Power Release 3/30/2021 Not Required JOSEPH MCGARRY
Smoke Detectors 3/30/2021 Approved JOSEPH MCGARRY
Verify Sprinkler Sign Off 3/30/2021 Approved JOSEPH MCGARRY
Final 3/31/2021 Corrections Issued JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 3/31/2021 SGSOV Approved JOSEPH MCGARRY
Final 4/7/2021 Corrections Issued JOSEPH MCGARRY
Final 5/5/2021 OK to Issue CofO JOSEPH MCGARRY