Pre-Inspection
|
9/19/2019
|
Corrections Issued
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
10/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/15/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/15/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Grading
|
10/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
10/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Grading
|
10/17/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/17/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/17/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
10/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/17/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/17/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Grading
|
10/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Grading
|
10/21/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/21/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Structural Steel Frame
|
10/21/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
10/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
10/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
10/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
10/25/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/25/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/28/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
10/29/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/29/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/30/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/31/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/1/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/7/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/8/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
11/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Grading
|
11/14/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/14/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
12/19/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
METHANE-Barrier
|
12/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
METHANE-Subgrade
|
12/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/3/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/6/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/7/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/8/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
1/8/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/9/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
1/9/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
1/10/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
1/10/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
METHANE-Rough
|
1/10/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Reinforced Concrete Frame
|
1/10/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Verify Sprinkler Sign Off
|
1/10/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/14/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/17/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
1/17/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
1/17/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
1/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
1/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
1/27/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
1/27/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/28/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
1/31/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
2/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
2/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
2/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
2/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
2/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
2/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
2/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
2/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
2/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
2/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
2/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
2/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
2/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
2/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/28/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
3/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
3/9/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
3/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/9/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/20/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
3/20/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
3/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
METHANE-Barrier
|
3/23/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
3/23/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
3/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
3/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
3/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/1/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/2/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
4/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
4/2/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/3/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
4/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/14/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
4/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
4/16/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
4/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/24/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
4/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
4/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
4/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
4/28/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/28/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
5/6/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/6/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/12/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
5/18/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/18/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
5/18/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/18/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/21/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/21/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/26/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/26/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/26/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
6/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
6/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
6/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
6/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/5/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
6/10/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/10/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/10/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
6/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/23/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/24/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
7/7/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
7/17/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
7/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/17/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/10/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
9/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
9/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
9/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/6/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/16/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/23/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/23/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
11/25/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/1/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
12/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
12/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
12/15/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/16/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
12/16/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
1/4/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
1/4/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
1/6/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
1/20/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
2/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
2/17/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/4/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
3/10/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/17/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
3/24/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/24/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
3/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/30/2021
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
4/13/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
4/15/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/23/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/11/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/21/2021
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
5/26/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/14/2021
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Excavation/Setback/Form/Re-Bar
|
6/23/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/1/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/9/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/15/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/15/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
7/28/2021
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
7/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
8/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
8/18/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/18/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
8/25/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/25/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
8/27/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/5/2021
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Pre-Inspection
|
10/8/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/29/2021
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
12/6/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
1/11/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
1/26/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
1/26/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
2/8/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
2/23/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
5/10/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
6/3/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
6/27/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/29/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
6/29/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/29/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
6/29/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/29/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
8/11/2022
|
OK to Issue CofO
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
8/11/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/11/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
8/11/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
8/11/2022
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
8/11/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/11/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
8/11/2022
|
Approved
|
RAFAEL ESPINOZA
|