1530 N CASSIL PL 90028

Certificate Information: 1530 N CASSIL PL 90028

Application / Permit
18010-10000-05399
Plan Check / Job No.
B18LA23786
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 8-story Mixed-Use Building. 5-Stories of Dwelling Units, Type IIIA Construction; over 1 Level Retail, Lobby and Parking, Type 1A Construction; over 3 Levels Subterranean Parking, Type 1A Construction. TOC TIER 3
Permit Issued
Issued on 12/23/2019
Issuing Office
Metro
Current Status
CofO Issued on 4/16/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/16/2018 APPLICANT
Assigned to Plan Check Engineer 12/7/2018 EUGENE BARBEAU
Corrections Issued 12/26/2018 EUGENE BARBEAU
Quality Review Completed 12/27/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 12/27/2018 APPLICANT
Applicant returned to address corrections 2/28/2019 EUGENE BARBEAU
Applicant returned to address corrections 4/15/2019 EUGENE BARBEAU
Plan Check Approved 12/17/2019 EUGENE BARBEAU
Issued 12/23/2019 LADBS
TCO Issued (Expire Date: 09-26-2023) 3/30/2023 TERRY HERR
TCO Issued (Expire Date: 03-24-2024) 9/26/2023 TED RIES
CofO in Progress 4/10/2024 DAVID BURKHEAD
Permit Finaled 4/16/2024 ERNESTO CORRAL
CofO Issued 4/16/2024 ERNESTO CORRAL
Permit Finaled 4/16/2024 ERNESTO CORRAL

Permit Application Clearance Information

Project located in CRA area Cleared 2/13/2019 JIM URQUHART
Hydrant and Access approval Cleared 3/27/2019 GEORGE SUCHAND
Address approval Cleared 5/8/2019 KARAN PATEL
Encroachment in public way Cleared 5/8/2019 KARAN PATEL
Highway dedication Cleared 5/8/2019 KARAN PATEL
Permit Cleared 5/8/2019 KARAN PATEL
Trees in Parkway Cleared 5/17/2019 JOHN KIM
Eng Process Fee Ord 176,300 Cleared 5/30/2019 ADRIAN SANCHEZ
Sewer availability Cleared 5/30/2019 ADRIAN SANCHEZ
Low Impact Development Cleared 6/18/2019 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 6/18/2019 ERIK BEASLEY
Fire Marshall Fire Life Safety Cleared 11/13/2019 VIDAL GARCIA
DAS Clearance Cleared 11/18/2019 EUGENE BARBEAU
Green Code Cleared 11/19/2019 DONALD CRICHLOW
Work Adjacent to Public Way Cleared 12/5/2019 BOK GOH
"D" conditions Cleared 12/17/2019 SOPHIE GABEL-SCHEINBAU
Building over 3-story or 36-ft Cleared 12/17/2019 CALOSHA APPROVED
Density Bonus 12.22.A.31 Cleared 12/17/2019 NICHOLAS KAWAZOE
Excavation more than 5-ft deep Cleared 12/17/2019 CALOSHA APPROVED
Miscellaneous Cleared 12/17/2019 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 12/17/2019 SOPHIE GABEL-SCHEINBAU
Site Plan review Cleared 12/17/2019 SOPHIE GABEL-SCHEINBAU
ZI Cleared 12/17/2019 SOPHIE GABEL-SCHEINBAU

Contact Information

Architect Empakeris,, Donatas Eduard; Lic. No.: C13779 DE ARCHITECTS   1535 6TH ST STE 101    SANTA MONICA, CA 90401
Contractor Essey Construction Company Inc; Lic. No.: 566045-B 10801 NATIONAL BOULEVARD #345      LOS ANGELES, CA 90064
Engineer Berliner,, Neal David; Lic. No.: GE2576 4913 MONUMENT ST      SIMI VALLEY, CA 93063
Engineer Labib,, Youhanna T; Lic. No.: S4549 319 MAIN STREET      EL SEGUNDO, CA 90245
Engineer Larocca,, Francis Joseph; Lic. No.: C75121 1821 PACIFIC COAST HWY 38      HERMOSA BEACH, CA 90254
Landscape Architect Kim,, Samuel Kyun; Lic. No.: LA3249 380 N. PALM STREET STE B      BREA, CA 92821

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 1/3/2020 Not Ready for Inspection DAVID BURKHEAD
Grading Pre-Inspection 1/7/2020 Approved DAVID BURKHEAD
Pre-Inspection 1/7/2020 Approved DAVID BURKHEAD
Footing/Foundation/Slab 5/21/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/9/2020 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/20/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/21/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/21/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/22/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/22/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/23/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/23/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/23/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/23/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/23/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/24/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/24/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/27/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/27/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/28/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/28/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/28/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/29/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/29/2020 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 7/29/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/30/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/31/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/31/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/31/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/31/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/31/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/3/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/4/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/4/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/4/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/4/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/4/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 8/7/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/7/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/7/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 8/11/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/11/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 8/11/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 8/12/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/12/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/12/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/13/2020 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/14/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2020 Approved DAVID BURKHEAD
Footing/Foundation/Slab 8/19/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/21/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/24/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/26/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/26/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/26/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/26/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/27/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/28/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/3/2020 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/11/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/12/2020 Partial Approval DAVID TSAU
Piling/Pier/Caisson 9/14/2020 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/21/2020 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 9/22/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/22/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 9/23/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 9/23/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/23/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/23/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 9/24/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/25/2020 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/28/2020 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 9/29/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 10/5/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/5/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 10/5/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/5/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 10/6/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/7/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/7/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 10/8/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/8/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/9/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/14/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 10/14/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/14/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/14/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/16/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 10/23/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/23/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/23/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 10/26/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/27/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 10/29/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/29/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/29/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/5/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/5/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/5/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/5/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/9/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/12/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/13/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/13/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/13/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/13/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 11/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/19/2020 Approved DANIEL MC AULIFFE
Green Building Rough 11/19/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 11/19/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 11/19/2020 Approved DANIEL MC AULIFFE
Deputy Shotcrete 11/20/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 11/23/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/3/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/10/2020 Approved DAVID BURKHEAD
Reinforced Concrete Frame 12/10/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/11/2020 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 12/15/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/22/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 12/23/2020 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/5/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/5/2021 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/6/2021 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 1/11/2021 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 1/13/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 1/14/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/14/2021 Partial Inspection DAVID BURKHEAD
Deputy Shotcrete 1/15/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/21/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/28/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/29/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/30/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/4/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 2/4/2021 Partial Inspection DAVID BURKHEAD
Reinforced Masonry Frame 2/4/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/5/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/5/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/8/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/9/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/16/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/17/2021 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 2/17/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 2/19/2021 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 2/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/4/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/4/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 3/5/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/10/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 3/11/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/12/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/15/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 3/18/2021 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 3/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/30/2021 Conditional Approval DANIEL MC AULIFFE
Wall Anchors 4/1/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/6/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 4/6/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/7/2021 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 4/7/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/8/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/9/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/15/2021 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 4/15/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/16/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/16/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/27/2021 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 4/27/2021 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/30/2021 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 4/30/2021 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 5/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/7/2021 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/7/2021 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/11/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/12/2021 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/12/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 5/13/2021 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/13/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/20/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/20/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/25/2021 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/26/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 5/26/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 5/26/2021 Partial Inspection DAVID BURKHEAD
Masonry Wall/Backfill 5/27/2021 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 6/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 6/4/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 6/4/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 6/4/2021 Partial Approval DAVID BURKHEAD
Wall Anchors 6/8/2021 Partial Approval DAVID BURKHEAD
Wood Frame 6/15/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 6/16/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 6/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/24/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/24/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 6/25/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/25/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 6/28/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/6/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 7/8/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 7/8/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 7/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/13/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 7/13/2021 Partial Inspection DAVID BURKHEAD
Wood Frame 7/13/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 7/14/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/14/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/14/2021 Partial Inspection DAVID BURKHEAD
Structural Steel Frame 7/14/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 7/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/16/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 7/16/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/16/2021 Partial Inspection DAVID BURKHEAD
Drywall Nailing 7/20/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/20/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/22/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 7/22/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/27/2021 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 7/29/2021 Partial Approval DAVID BURKHEAD
Special/Order Compliance 7/29/2021 Corrections Issued DAVID BURKHEAD
Wood Frame 7/30/2021 Partial Approval DAVID BURKHEAD
Wood Frame 8/2/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/6/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/9/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 8/11/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/12/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/16/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 8/18/2021 Partial Inspection DAVID BURKHEAD
Wood Frame 8/24/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/26/2021 Partial Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/26/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/30/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/30/2021 Partial Approval DAVID BURKHEAD
Deputy Other (see comments) 9/1/2021 Conditional Approval DANIEL MC AULIFFE
Wood Frame 9/1/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/2/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/7/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/13/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/14/2021 Partial Approval DAVID BURKHEAD
Insulation 9/14/2021 Partial Approval DAVID BURKHEAD
Wood Frame 9/15/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/16/2021 Partial Inspection DAVID BURKHEAD
Insulation 9/16/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/17/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/17/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 9/20/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/20/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/21/2021 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 9/21/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/22/2021 Partial Approval DAVID BURKHEAD
Wood Frame 9/22/2021 Partial Inspection DAVID BURKHEAD
Insulation 9/23/2021 Partial Approval DAVID BURKHEAD
Wall Anchors 9/23/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/23/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/24/2021 Partial Approval DAVID BURKHEAD
Wood Frame 9/24/2021 Partial Approval DAVID BURKHEAD
Insulation 9/27/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/27/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/28/2021 Partial Approval DAVID BURKHEAD
Insulation 9/28/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/29/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/29/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/29/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 9/30/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/30/2021 Partial Approval DAVID BURKHEAD
Insulation 9/30/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 10/1/2021 Conditional Approval DAVID BURKHEAD
Insulation 10/1/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/4/2021 Partial Inspection DAVID BURKHEAD
Insulation 10/4/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/5/2021 Partial Inspection DAVID BURKHEAD
Insulation 10/5/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 10/6/2021 Partial Approval DAVID BURKHEAD
Wall Anchors 10/6/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 10/12/2021 Approved SORIN CIRSTOIU
Drywall Nailing 10/12/2021 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/13/2021 Approved SORIN CIRSTOIU
Structural Steel Frame 10/13/2021 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/14/2021 Approved SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 10/14/2021 Partial Inspection SORIN CIRSTOIU
Insulation 10/14/2021 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 10/15/2021 Approved SORIN CIRSTOIU
Drywall Nailing 10/20/2021 Partial Approval BRUCE CAMPBELL
Floor/Roof Diaphrgm/Shear Wall 10/21/2021 Partial Approval DANIEL MC AULIFFE
Insulation 10/21/2021 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 10/22/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 10/22/2021 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 10/25/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 10/25/2021 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 10/25/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/26/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 10/28/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/29/2021 Partial Approval DAVID BURKHEAD
Insulation 11/2/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/2/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/3/2021 Partial Inspection DAVID BURKHEAD
Insulation 11/3/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/3/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/4/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/4/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/5/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/9/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 11/9/2021 Partial Inspection DAVID BURKHEAD
Drywall Nailing 11/10/2021 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 11/10/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 11/10/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/12/2021 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 11/12/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/15/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/15/2021 Partial Inspection DAVID BURKHEAD
T-Bar Ceiling 11/15/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 11/17/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/17/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/18/2021 Partial Inspection DAVID BURKHEAD
Insulation 11/18/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/18/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/19/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/19/2021 Partial Approval DAVID BURKHEAD
Insulation 11/19/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/22/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/23/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 11/23/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 11/23/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/23/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 11/24/2021 Approved DANIEL MC AULIFFE
Drywall Nailing 11/24/2021 Partial Inspection DANIEL MC AULIFFE
Insulation 11/24/2021 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 11/24/2021 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 11/30/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/30/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/1/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 12/1/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 12/2/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/2/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/6/2021 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/6/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/7/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/7/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/7/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/9/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/9/2021 Partial Approval DAVID BURKHEAD
Insulation 12/9/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 12/10/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/10/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/10/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 12/10/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 12/13/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/13/2021 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 12/15/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/15/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/16/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 12/16/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/16/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/17/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/17/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/17/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 12/20/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/20/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/21/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/21/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/21/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 12/22/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/22/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/22/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 12/23/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/23/2021 Corrections Issued DAVID BURKHEAD
Drywall Nailing 12/28/2021 Not Ready for Inspection DAVID BURKHEAD
Insulation 12/28/2021 Partial Inspection DAVID BURKHEAD
Drywall Nailing 12/29/2021 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/29/2021 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/3/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/3/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 1/4/2022 Approved DANIEL MC AULIFFE
Wood Frame 1/4/2022 Partial Approval DAVID BURKHEAD
Wood Frame 1/5/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/7/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 1/10/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/12/2022 Conditional Approval DAVID BURKHEAD
Insulation 1/12/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 1/13/2022 Conditional Approval DAVID BURKHEAD
Insulation 1/13/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 1/14/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/18/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/19/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/19/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/19/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 1/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/21/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 1/21/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 1/21/2022 Partial Approval DAVID BURKHEAD
Insulation 1/28/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 2/1/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/1/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/3/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/9/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/11/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/11/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 2/14/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/14/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/15/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/16/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/17/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/23/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/23/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/24/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 2/24/2022 Partial Approval DAVID BURKHEAD
Insulation 2/28/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/1/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/1/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/2/2022 Partial Inspection DAVID BURKHEAD
Insulation 3/2/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/3/2022 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 3/3/2022 Partial Inspection DAVID BURKHEAD
Insulation 3/3/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/7/2022 Partial Approval DAVID BURKHEAD
Insulation 3/7/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 3/7/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/9/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/9/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 3/9/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/11/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/11/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 3/11/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/14/2022 Partial Approval DAVID BURKHEAD
Insulation 3/14/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 3/14/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/16/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/16/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/22/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/22/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 3/22/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 3/29/2022 Partial Approval DAVID BURKHEAD
Insulation 3/29/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/31/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/31/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 4/4/2022 Partial Inspection DAVID BURKHEAD
Insulation 4/4/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/13/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/13/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/13/2022 Corrections Issued DAVID BURKHEAD
Drywall Nailing 4/15/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/15/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/15/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/27/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/27/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/2/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/2/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/3/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/3/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/4/2022 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/10/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/10/2022 Corrections Issued DAVID BURKHEAD
Wood Frame 5/10/2022 Corrections Issued DAVID BURKHEAD
Insulation 5/13/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/13/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/16/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/16/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/17/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/17/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/18/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/18/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 5/20/2022 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 5/20/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/25/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/25/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/25/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/6/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/6/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/8/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 6/8/2022 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 6/10/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/10/2022 Partial Inspection DAVID BURKHEAD
Drywall Nailing 6/13/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 6/13/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 6/15/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 6/16/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/17/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 6/17/2022 Approved DAVID BURKHEAD
Drywall Nailing 6/23/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 6/23/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 6/24/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 6/29/2022 Partial Approval DAVID BURKHEAD
Wood Frame 6/29/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/1/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/5/2022 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/7/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/8/2022 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/13/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/14/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/14/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/15/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/15/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/19/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/19/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 7/20/2022 Corrections Issued DAVID BURKHEAD
Drywall Nailing 7/21/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 7/21/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/22/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/25/2022 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/23/2022 Partial Inspection EDWIN GREGORYONA
Insulation 8/29/2022 Not Ready for Inspection TED RIES
Insulation 9/1/2022 Approved DAVID BURKHEAD
Light Gage Steel Frame 9/1/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/13/2022 Partial Approval TED RIES
Drywall Nailing 9/21/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/26/2022 Partial Approval DAVID BURKHEAD
Insulation 10/21/2022 Not Ready for Inspection EDWIN GREGORYONA
Final 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/31/2022 Approved DAVID BURKHEAD
Reinforced Masonry Frame 10/31/2022 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 10/31/2022 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 10/31/2022 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 10/31/2022 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/8/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 12/2/2022 Approved EDWIN GREGORYONA
Special/Order Compliance 1/10/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 1/17/2023 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 1/18/2023 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 1/18/2023 Corrections Issued DAVID BURKHEAD
Final 1/23/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 1/23/2023 Approved DAVID BURKHEAD
Green Building Final 1/23/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 1/23/2023 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 1/23/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 1/24/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/24/2023 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 1/25/2023 Approved DAVID BURKHEAD
T-Bar Ceiling 1/26/2023 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 2/1/2023 Partial Inspection DAVID BURKHEAD
Masonry Wall/Backfill 2/2/2023 Partial Approval DAVID BURKHEAD
Final 2/3/2023 Corrections Issued DAVID BURKHEAD
Green Building Final 2/3/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 2/3/2023 SGSOV Not Ready DAVID BURKHEAD
Smoke Detectors 2/3/2023 Approved DAVID BURKHEAD
Special/Order Compliance 2/6/2023 Partial Inspection DAVID BURKHEAD
T-Bar Ceiling 2/9/2023 Partial Approval DAVID BURKHEAD
Special/Order Compliance 2/10/2023 Approved DAVID BURKHEAD
Light Gage Steel Frame 2/17/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/24/2023 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 2/28/2023 Conditional Approval TED RIES
Special/Order Compliance 3/6/2023 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 3/13/2023 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 3/15/2023 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 3/16/2023 Partial Inspection DAVID BURKHEAD
Final 3/22/2023 Partial Inspection DAVID BURKHEAD
Green Building Final 3/22/2023 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 3/22/2023 SGSOV Approved DAVID BURKHEAD
Special/Order Compliance 3/23/2023 Partial Inspection DAVID BURKHEAD
Final 3/29/2023 Partial Inspection DAVID BURKHEAD
Green Building Final 3/29/2023 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 8/29/2023 Partial Approval DAVID BURKHEAD
Special/Order Compliance 2/28/2024 Partial Approval DAVID BURKHEAD
Final 4/5/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 4/5/2024 Approved DAVID BURKHEAD
Final 4/10/2024 OK to Issue CofO DAVID BURKHEAD