834 S SHENANDOAH ST 90035

Certificate Information: 834 S SHENANDOAH ST 90035

Application / Permit
18010-10000-05350
Plan Check / Job No.
B18LA23484
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 38'-6" X 94' (4) STORY (5 UNIT) TYPE VA APARTMENT BUILDING OVER ONE LEVEL OF TYPE 1 SUBTERRANEAN PARKING. NFPA 13 SPRINKLERS THROUGHOUT
Permit Issued
Issued on 3/12/2020
Issuing Office
Metro
Current Status
CofO Issued on 5/16/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/1/2018 APPLICANT
Assigned to Plan Check Engineer 12/6/2018 MICHAEL PEREZ
Corrections Issued 1/3/2019 MICHAEL PEREZ
Quality Review Completed 2/1/2019 QUAN NGHIEM
Building Plans Picked Up 3/6/2019 APPLICANT
Disabled Access Plans Picked Up 5/31/2019 APPLICANT
Plan Check Approved 10/31/2019 MICHAEL PEREZ
Issued 3/12/2020 LADBS
Green Plans Picked Up 5/6/2020 APPLICANT
CofO in Progress 5/5/2023 DERRICK SPENCER
Permit Finaled 5/16/2023 DAVID TSAU
CofO Issued 5/16/2023 DAVID TSAU
Permit Finaled 5/16/2023 DAVID TSAU

Permit Application Clearance Information

Construction near power lines Cleared 4/15/2019 NADER ISKANDER
Construction within easement Cleared 4/15/2019 NADER ISKANDER
Green Code Cleared 5/10/2019 KHEDER ALRAZAA
Highway dedication Cleared 5/10/2019 ELAINE LEI
Permit Cleared 5/10/2019 ELAINE LEI
Abandoned oil well Cleared 5/15/2019 JOHN CONNEALLY
Hydrant and Access approval Cleared 5/15/2019 JOHN CONNEALLY
Low Impact Development Cleared 8/22/2019 MARTIN FRAGOSO
CPC Cleared 9/4/2019 ANNA VAN
CPC Cleared 9/4/2019 ANNA VAN
Eng Process Fee Ord 176,300 Cleared 9/10/2019 THOMAS LANG
Roof/Waste drainage to street Cleared 9/10/2019 THOMAS LANG
Sewer availability Cleared 9/10/2019 THOMAS LANG
Frnt yard landscape/Water mgmt Cleared 9/11/2019 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 9/11/2019 SOPHIE GABEL-SCHEINBAU
Work Adjacent to Public Way Cleared 9/11/2019 CHIU TAM
"Q" conditions Cleared 9/13/2019 SOPHIE GABEL-SCHEINBAU
Building over 3-story or 36-ft Cleared 9/13/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/13/2019 CALOSHA APPROVED
Trees in Parkway Cleared 9/13/2019 ADRIAN SANCHEZ
Miscellaneous Cleared 9/18/2019 ERIC CLAROS
Miscellaneous Cleared 9/18/2019 ERIC CLAROS
Fire Marshall Fire Life Safety Cleared 9/26/2019 PEJMAN NOORI
Building over 3-story or 36-ft Cleared 10/31/2019 CALOSHA APPROVED
DAS Clearance Cleared 10/31/2019 WAI LAU
Excavation more than 5-ft deep Cleared 10/31/2019 CALOSHA APPROVED

Contact Information

Architect Mashihi,, Jacques; Lic. No.: C15922 10556 ASHTON AVENUE      LOS ANGELES, CA 90024
Contractor Owner-Builder       ,
Engineer Berkoz,, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356
Engineer Conaway,, Johnny Ray; Lic. No.: C19689 PO BOX 155      OAK VIEW, CA 93022
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Mahn,, Jonathan Edward; Lic. No.: C60293 12848 FOOTHILL BLVD      SYLMAR, CA 91381

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 5/11/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/12/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/13/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/14/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/15/2020 Approved DERRICK SPENCER
Deputy Grading 5/18/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/19/2020 Approved JEFF BYTHEWAY
Special/Order Compliance 5/19/2020 Corrections Issued JEFF BYTHEWAY
Deputy Grading 5/20/2020 Approved JEFF BYTHEWAY
Special/Order Compliance 5/20/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/21/2020 Approved JEFF BYTHEWAY
Deputy Grading 5/22/2020 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 9/15/2020 Partial Approval SORIN CIRSTOIU
METHANE-Barrier 9/15/2020 Partial Inspection SORIN CIRSTOIU
METHANE-Subgrade 9/15/2020 Partial Inspection SORIN CIRSTOIU
Deputy Shotcrete 9/23/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 9/24/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 9/24/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 9/24/2020 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 10/13/2020 Partial Approval JEFF BYTHEWAY
METHANE-Barrier 10/13/2020 Partial Approval JEFF BYTHEWAY
METHANE-Subgrade 10/13/2020 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 10/14/2020 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 10/20/2020 Partial Inspection GRANT WOODS
METHANE-Barrier 10/20/2020 Partial Inspection GRANT WOODS
METHANE-Subgrade 10/20/2020 Partial Inspection GRANT WOODS
Footing/Foundation/Slab 10/22/2020 Partial Approval DERRICK SPENCER
METHANE-Barrier 10/22/2020 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 10/22/2020 Not Ready for Inspection DERRICK SPENCER
Green Building Rough 10/27/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Rough 10/27/2020 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Masonry Frame 10/27/2020 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 10/27/2020 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 10/28/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Barrier 10/28/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Subgrade 10/28/2020 Not Ready for Inspection JEFF BYTHEWAY
Footing/Foundation/Slab 11/5/2020 Partial Approval JEFF BYTHEWAY
METHANE-Barrier 11/5/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Subgrade 11/5/2020 Partial Approval JEFF BYTHEWAY
Green Building Rough 11/16/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Rough 11/16/2020 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Masonry Frame 11/17/2020 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 12/29/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Barrier 12/29/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Subgrade 12/29/2020 Not Ready for Inspection JEFF BYTHEWAY
Footing/Foundation/Slab 12/31/2020 Partial Inspection SORIN CIRSTOIU
METHANE-Barrier 12/31/2020 Partial Inspection SORIN CIRSTOIU
METHANE-Subgrade 12/31/2020 Partial Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 1/4/2021 Partial Approval SORIN CIRSTOIU
METHANE-Barrier 1/4/2021 Partial Approval SORIN CIRSTOIU
METHANE-Subgrade 1/4/2021 Partial Approval SORIN CIRSTOIU
Masonry Wall/Backfill 1/4/2021 Partial Approval SORIN CIRSTOIU
Footing/Foundation/Slab 2/8/2021 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Barrier 2/8/2021 Approved JEFF BYTHEWAY
METHANE-Subgrade 2/8/2021 Approved JEFF BYTHEWAY
Green Building Rough 2/9/2021 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Rough 2/9/2021 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 2/9/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/10/2021 Approved JEFF BYTHEWAY
Deputy Wood Construction 3/25/2021 Approved JEFF BYTHEWAY
Deputy Wood Construction 4/13/2021 Approved JEFF BYTHEWAY
Drywall Nailing 4/15/2021 Not Ready for Inspection JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 4/15/2021 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 4/28/2021 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 4/29/2021 Conditional Approval JEFF BYTHEWAY
Drywall Nailing 5/27/2021 Partial Inspection SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 5/27/2021 Partial Inspection SORIN CIRSTOIU
Wood Frame 5/27/2021 Corrections Issued SORIN CIRSTOIU
Floor/Roof Diaphrgm/Shear Wall 6/1/2021 Not Ready for Inspection JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 6/2/2021 Partial Approval JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 6/16/2021 Partial Approval JEFF BYTHEWAY
Insulation 7/14/2021 Partial Inspection JEFF BYTHEWAY
Insulation 7/16/2021 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 7/23/2021 Not Ready for Inspection NICK LAROCCA
Drywall Nailing 7/29/2021 Partial Inspection JEFF BYTHEWAY
Wood Frame 7/31/2021 Corrections Issued JEFF BYTHEWAY
Drywall Nailing 8/13/2021 Partial Inspection JEFF BYTHEWAY
Interior/Exterior Lathing 8/13/2021 Partial Approval JEFF BYTHEWAY
Interior/Exterior Lathing 8/18/2021 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/1/2021 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 10/28/2021 Partial Approval JEFF BYTHEWAY
Green Building Rough 10/28/2021 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 11/8/2021 Partial Approval JEFF BYTHEWAY
Interior/Exterior Lathing 12/3/2021 Approved JEFF BYTHEWAY
Masonry Wall/Backfill 12/22/2021 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 4/5/2022 Approved JEFF BYTHEWAY
Pre-Inspection 5/12/2022 Approved JEFF BYTHEWAY
Wood Frame 8/5/2022 Partial Inspection JEFF BYTHEWAY
Wood Frame 8/9/2022 Partial Inspection JEFF BYTHEWAY
Wood Frame 8/16/2022 Partial Inspection JEFF BYTHEWAY
Final 11/17/2022 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 11/17/2022 Approved DERRICK SPENCER
Green Building Final 11/17/2022 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 11/17/2022 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 11/17/2022 SGSOV Approved DERRICK SPENCER
Smoke Detectors 11/17/2022 Approved DERRICK SPENCER
Final 1/30/2023 Not Ready for Inspection DERRICK SPENCER
Green Building Final 1/30/2023 Not Ready for Inspection DERRICK SPENCER
Special/Order Compliance 1/31/2023 Approved DERRICK SPENCER
Final 4/25/2023 Not Ready for Inspection DERRICK SPENCER
Green Building Final 4/25/2023 Not Ready for Inspection DERRICK SPENCER
Final 5/1/2023 OK to Issue CofO DERRICK SPENCER
Green Building Final 5/1/2023 Approved DERRICK SPENCER
Pre-Inspection 5/2/2023 Approved DERRICK SPENCER