1822 S OVERLAND AVE 90025

Certificate Information: 1822 S OVERLAND AVE 90025

Application / Permit
18010-10000-05347
Plan Check / Job No.
B18LA23461
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 16-unit 6-story apartment building with 2-level of subterranean garage: 5-story type IIIA construction over 1-story type IA construction over 2-level of subterranean garage. Project utilizes TOC Tier III guideline and additional incentives per DIR-2018-5510-TOC.
Permit Issued
Issued on 12/28/2020
Issuing Office
Current Status
CofO Issued on 2/9/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/1/2018 APPLICANT
Assigned to Plan Check Engineer 11/30/2018 TU HUA
Green Plans Picked Up 12/5/2018 APPLICANT
Corrections Issued 12/17/2018 TU HUA
Quality Review Completed 1/2/2019 MINYE PAK
Building Plans Picked Up 1/3/2019 APPLICANT
Disabled Access Plans Picked Up 1/3/2019 APPLICANT
Applicant returned to address corrections 1/28/2019 TU HUA
Applicant returned to address corrections 2/1/2019 TU HUA
Applicant returned to address corrections 2/20/2019 TU HUA
Applicant returned to address corrections 2/27/2019 TU HUA
Applicant returned to address corrections 3/6/2019 TU HUA
Applicant returned to address corrections 3/20/2019 TU HUA
Applicant returned to address corrections 7/24/2019 TU HUA
Applicant returned to address corrections 9/4/2019 TU HUA
Plan Check Approved 2/19/2020 TU HUA
Issued 12/28/2020 APPLICANT
CofO in Progress 2/5/2026 DERRICK SPENCER
Permit Finaled 2/9/2026 VASIL MIHALEV
CofO Issued 2/9/2026 VASIL MIHALEV
Permit Finaled 2/9/2026 VASIL MIHALEV

Permit Application Clearance Information

Abandoned oil well Cleared 1/11/2019 JOHN CONNEALLY
Abandoned oil well approval Cleared 1/11/2019 JOHN CONNEALLY
Address approval Cleared 1/11/2019 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 1/11/2019 ADRIAN SANCHEZ
Sewer availability Cleared 4/4/2019 ERIK BEASLEY
DAS Clearance Cleared 4/10/2019 ELIZABETH TOMS
Trees in Parkway Cleared 4/12/2019 ADRIAN SANCHEZ
Density Bonus 12.22.A.31 Cleared 5/15/2019 RICHARD TRUONG
Highway dedication Cleared 5/23/2019 CHRISTOPHER LAW
Specific Plan Cleared 5/29/2019 PEDRO AYALA
Fire Marshall Fire Life Safety Cleared 5/31/2019 VIDAL GARCIA
Permit Cleared 5/31/2019 CHRISTOPHER LAW
DCP conditions approval Cleared 6/14/2019 RICHARD TRUONG
Frnt yard landscape/Water mgmt Cleared 6/14/2019 LATANYA ROUX
Miscellaneous Cleared 6/14/2019 LATANYA ROUX
Opn space landscape/Water mgmt Cleared 6/14/2019 LATANYA ROUX
Work Adjacent to Public Way Cleared 6/17/2019 KRISTEN LY
Excavation more than 5-ft deep Cleared 7/18/2019 CALOSHA APPROVED
Haul Route Cleared 7/24/2019 LAMAR DAVIS
Construction near power lines Cleared 11/1/2019 RIDWAN HARDY
Construction within easement Cleared 11/1/2019 RIDWAN HARDY
Green Code Cleared 2/5/2020 COLIN LOREDO
Hydrant and Access approval Cleared 2/5/2020 JEREMY CARTER
Low Impact Development Cleared 2/7/2020 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 2/11/2020 CELINA MORENO
Building over 3-story or 36-ft Cleared 2/19/2020 CALOSHA APPROVED
GPI Written Notices Cleared 2/19/2020 TU HUA
Grading Pre-Inspection Cleared 2/19/2020 TU HUA

Contact Information

Architect Techentin,, Warren A; Lic. No.: C28100 2066 N EDGEMONT STREET      LOS ANGELES, CA 90027
Contractor Century West Associates Incorporated; Lic. No.: 523872-B 1415 JONESBORO DR      LOS ANGELES, CA 90049
Engineer Zangoli,, Fabio; Lic. No.: S6191 13245 FIJI WY UNIT J      MARINA DEL REY, CA 90292

Inspector Information

DERRICK SPENCER, (310) 914-3919 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/17/2021 Approved DERRICK SPENCER
Footing/Foundation/Slab 6/29/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 6/29/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 6/29/2021 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 7/16/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 7/16/2021 Not Ready for Inspection DERRICK SPENCER
METHANE-Subgrade 7/16/2021 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 7/21/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 7/21/2021 Partial Approval DERRICK SPENCER
METHANE-Subgrade 7/21/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 7/27/2021 Partial Approval DERRICK SPENCER
METHANE-Barrier 7/27/2021 Approved DERRICK SPENCER
METHANE-Subgrade 7/27/2021 Approved DERRICK SPENCER
Deputy Shotcrete 7/28/2021 Approved DERRICK SPENCER
Deputy Shotcrete 7/30/2021 Approved DERRICK SPENCER
Green Building Rough 8/11/2021 Approved DERRICK SPENCER
METHANE-Rough 8/11/2021 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 8/11/2021 Partial Approval DERRICK SPENCER
Verify Sprinkler Sign Off 8/11/2021 Approved DERRICK SPENCER
Reinforced Concrete Frame 8/27/2021 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 9/7/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 10/6/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 10/19/2021 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 11/4/2021 Partial Approval DERRICK SPENCER
Masonry Wall/Backfill 11/12/2021 Partial Approval DAVID TSAU
Deputy Reinf. Concrete 3/8/2022 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 3/9/2022 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 3/30/2022 Partial Approval DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 6/10/2022 Not Ready for Inspection DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 6/16/2022 Corrections Issued DERRICK SPENCER
Pre-Inspection 6/24/2022 Not Ready for Inspection DERRICK SPENCER
Deputy Reinf. Concrete 6/30/2022 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 7/18/2022 Partial Approval DERRICK SPENCER
Deputy Shotcrete 7/21/2022 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/1/2022 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 9/1/2022 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 9/2/2022 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 9/2/2022 Partial Approval DERRICK SPENCER
Deputy Steel/Welding 10/24/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 10/25/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 10/26/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 10/27/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 10/28/2022 Conditional Approval DERRICK SPENCER
Deputy Steel/Welding 10/31/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 1/26/2023 Approved DERRICK SPENCER
Deputy Steel/Welding 1/30/2023 Approved DERRICK SPENCER
Deputy Steel/Welding 1/31/2023 Approved DERRICK SPENCER
Pre-Inspection 5/10/2023 Partial Approval PAUL DAVIDSON
Excavation/Setback/Form/Re-Bar 5/24/2023 Partial Approval DERRICK SPENCER
METHANE-Rough 5/24/2023 Not Ready for Inspection DERRICK SPENCER
Wood Frame 5/24/2023 Partial Approval DERRICK SPENCER
Deputy Wood Construction 5/26/2023 Approved DERRICK SPENCER
METHANE-Rough 6/12/2023 Not Ready for Inspection DERRICK SPENCER
Wood Frame 6/12/2023 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 6/14/2023 Approved DERRICK SPENCER
METHANE-Rough 6/30/2023 Approved DERRICK SPENCER
Wood Frame 6/30/2023 Partial Approval DERRICK SPENCER
Footing/Foundation/Slab 9/27/2023 Partial Approval DERRICK SPENCER
Wood Frame 10/4/2023 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/30/2023 Partial Approval DERRICK SPENCER
Wood Frame 10/30/2023 Not Ready for Inspection DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 11/1/2023 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 11/9/2023 Not Ready for Inspection PAUL DAVIDSON
Insulation 12/1/2023 Partial Approval DERRICK SPENCER
Insulation 12/4/2023 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 12/8/2023 No Access for Inspection DERRICK SPENCER
Interior/Exterior Lathing 12/12/2023 Not Ready for Inspection PAUL DAVIDSON
Pre-Inspection 1/19/2024 Approved DERRICK SPENCER
Pre-Inspection 2/2/2024 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 2/13/2024 Partial Approval DERRICK SPENCER
Insulation 2/15/2024 Partial Approval DERRICK SPENCER
Insulation 2/16/2024 Partial Approval DERRICK SPENCER
Pre-Inspection 2/16/2024 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 2/22/2024 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 2/29/2024 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 4/30/2024 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 5/24/2024 Approved DERRICK SPENCER
Insulation 8/26/2024 Not Ready for Inspection FARHAD DADBIN
Insulation 8/29/2024 Approved DERRICK SPENCER
Insulation 9/13/2024 Partial Approval DERRICK SPENCER
Drywall Nailing 10/16/2024 No Access for Inspection DERRICK SPENCER
Drywall Nailing 10/25/2024 Not Ready for Inspection NICK LAROCCA
Interior/Exterior Lathing 10/25/2024 Approved NICK LAROCCA
Drywall Nailing 10/30/2024 Not Ready for Inspection DERRICK SPENCER
Drywall Nailing 11/4/2024 Partial Approval DANIEL VARNUM
Drywall Nailing 11/12/2024 Partial Approval DERRICK SPENCER
Wood Frame 11/19/2024 Partial Approval DERRICK SPENCER
Drywall Nailing 11/22/2024 Partial Approval DERRICK SPENCER
T-Bar Ceiling 12/30/2024 Approved DERRICK SPENCER
Interior/Exterior Lathing 1/15/2025 Approved DERRICK SPENCER
Light Gage Steel Frame 2/14/2025 Corrections Issued DANIEL VARNUM
Light Gage Steel Frame 2/20/2025 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 2/21/2025 Approved DERRICK SPENCER
Drywall Nailing 5/14/2025 Approved DERRICK SPENCER
Final 5/14/2025 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 5/14/2025 Approved DERRICK SPENCER
Green Building Final 5/14/2025 Approved DERRICK SPENCER
Reinforced Concrete Frame 5/14/2025 Approved DERRICK SPENCER
Reinforced Masonry Frame 5/14/2025 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 5/14/2025 SGSOV Approved DERRICK SPENCER
Smoke Detectors 5/14/2025 Approved DERRICK SPENCER
Structural Steel Frame 5/14/2025 Approved DERRICK SPENCER
Wood Frame 5/14/2025 Approved DERRICK SPENCER
Final 7/7/2025 Not Ready for Inspection DERRICK SPENCER
Final 8/29/2025 Not Ready for Inspection DERRICK SPENCER
Final 10/30/2025 Not Ready for Inspection DERRICK SPENCER
Pre-Inspection 10/31/2025 Approved DERRICK SPENCER
Final 11/3/2025 Not Ready for Inspection DERRICK SPENCER
Final 11/14/2025 OK to Issue CofO DERRICK SPENCER
Final 2/5/2026 Not Ready for Inspection DERRICK SPENCER