448 W BEECH ST 90065

Certificate Information: 448 W BEECH ST 90065

Application / Permit
18010-10000-04946
Plan Check / Job No.
B18LA21906
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 2-story single family dwelling with lower level basement. NFPA 13D is provided throughout.
Permit Issued
Issued on 6/10/2025
Issuing Office
Metro
Current Status
Issued on 6/10/2025

Permit Application Status History

Submitted 10/12/2018 APPLICANT
Assigned to Plan Check Engineer 11/15/2018 TU HUA
Corrections Issued 12/3/2018 TU HUA
Quality Review Completed 12/27/2018 MINYE PAK
Building Plans Picked Up 1/2/2019 APPLICANT
Green Plans Picked Up 1/2/2019 APPLICANT
Applicant returned to address corrections 4/2/2019 TU HUA
Applicant returned to address corrections 4/10/2019 TU HUA
Applicant returned to address corrections 6/19/2019 TU HUA
Applicant returned to address corrections 6/27/2019 TU HUA
Applicant returned to address corrections 10/2/2019 TU HUA
Applicant returned to address corrections 5/12/2021 TU HUA
Applicant returned to address corrections 2/16/2022 TU HUA
Plan Check Approved 4/1/2022 TU HUA
No Progress 4/25/2022 TU HUA
Plan Check Approved 2/8/2023 TU HUA
Issued 6/10/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 1/7/2019 STEVE MELGAR
BHO/Hillside ordinance Cleared 1/7/2019 STEVE MELGAR
Highway dedication Cleared 1/7/2019 STEVE MELGAR
Permit Cleared 1/7/2019 STEVE MELGAR
ZI Cleared 2/19/2019 MOTOUMI SASAKI
Eng Process Fee Ord 176,300 Cleared 3/11/2019 ELENA LOPEZ
Hydrant and Access approval Cleared 3/11/2019 GILBERT URREA
Sewer availability Cleared 3/11/2019 ELENA LOPEZ
Low Impact Development Cleared 5/21/2019 SARAH YOUSSEF
Disturb/Remove Protected Trees Cleared 5/22/2019 JOHN KIM
Trees in Parkway Cleared 5/22/2019 JOHN KIM
Green Code Cleared 6/17/2019 SARAH ABOULHOSN
Roof/Waste drainage to street Cleared 6/17/2019 JEANETTE VONG
Specific Plan Cleared 6/17/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/17/2019 SOPHIE GABEL-SCHEINBAU
BHO/Hillside ordinance Cleared 9/10/2019 JEANETTE VONG
Work Adjacent to Public Way Cleared 9/27/2019 TU HUA
Building over 3-story or 36-ft Cleared 10/2/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/2/2019 CALOSHA APPROVED
GPI Written Notices Cleared 10/2/2019 TU HUA
Grading Pre-Inspection Cleared 10/2/2019 TU HUA
BHO/Hillside ordinance Cleared 1/24/2023 AMAAN MALIK

Contact Information

Contractor Modernmorph Construction Inc; Lic. No.: 1118649-B 155 N LAKE AVE   STE 800    PASADENA, CA 91101
Engineer Tagudar,, Fred; Lic. No.: C33612 850 E OCEAN BLVD 706      LONG BEACH, CA 90802

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

No Data Available.