5181 W ADAMS BLVD 90016

Certificate Information: 5181 W ADAMS BLVD 90016

Application / Permit
18010-10000-04667
Plan Check / Job No.
B18LA20432
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(MIXED USE + AFFORDABLE HOUSING INCENTIVES) NEW 6 STORY WITH 4 STORY TYPE V-A 115 UNIT APARTMENT OVER FIRST STORY TYPE I-A RETAILS/PARKING GARAGE AND SECOND STORY TYPE I-A GARAGE <<35% DENSITY BONUS SETTING ASIDE 13 UNITS (11% OF THE 115 UNITS) FOR VERY LOW INCOME HOUSEHOLD>> "COMPLY WITH DEPARTMENT ORDER effective date 06/24/2013. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". CEIS Case Number is 500183.
Permit Issued
Issued on 9/14/2020
Issuing Office
Metro
Current Status
CofO Issued on 12/27/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/24/2018 APPLICANT
Assigned to Plan Check Engineer 10/25/2018 DEAN LEE
Disabled Access Plans Picked Up 10/30/2018 APPLICANT
Corrections Issued 11/29/2018 DEAN LEE
Quality Review Completed 12/12/2018 BILL STUTSMAN
Building Plans Picked Up 12/13/2018 APPLICANT
Applicant returned to address corrections 5/23/2019 DEAN LEE
Applicant returned to address corrections 7/10/2019 DEAN LEE
Applicant returned to address corrections 8/1/2019 DEAN LEE
Applicant returned to address corrections 10/10/2019 DEAN LEE
Applicant returned to address corrections 11/21/2019 DEAN LEE
Green Plans Picked Up 7/1/2020 APPLICANT
Applicant returned to address corrections 8/11/2020 DEAN LEE
Plan Check Approved 8/19/2020 DEAN LEE
Issued 9/14/2020 APPLICANT
TCO Issued (Expire Date: 12-24-2023) 6/27/2023 TED RIES
CofO in Progress 12/18/2023 EDWIN GREGORYONA
Permit Finaled 12/27/2023 ERNESTO CORRAL
CofO Issued 12/27/2023 ERNESTO CORRAL
Permit Finaled 12/27/2023 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 5/16/2019 ELAINE LEI
Hydrant and Access approval Cleared 5/16/2019 JOHN CONNEALLY
CPC Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
Comm Cor/Mini-Mall Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
ZA Case Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
ZI Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
ZI Cleared 6/24/2019 SOPHIE GABEL-SCHEINBAU
Driveway location Cleared 7/2/2019 MOHAMMAD HASAN
Internal circulation Cleared 7/2/2019 MOHAMMAD HASAN
Project located in CRA area Cleared 7/11/2019 JIM URQUHART
Highway dedication Cleared 7/22/2019 ELENA LOPEZ
Eng Process Fee Ord 176,300 Cleared 9/20/2019 ELAINE LEI
Comm Cor/Mini-Mall Cleared 10/30/2019 SOPHIE GABEL-SCHEINBAU
Comm Cor/Mini-Mall Cleared 10/30/2019 SOPHIE GABEL-SCHEINBAU
Low Impact Development Cleared 10/30/2019 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 10/30/2019 CELINA MORENO
Building over 3-story or 36-ft Cleared 11/1/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/1/2019 CALOSHA APPROVED
Permit Cleared 11/7/2019 CELINA MORENO
DAS Clearance Cleared 11/18/2019 WAI LAU
Fire Marshall Fire Life Safety Cleared 2/4/2020 WILLIAM JOHNS
Work Adjacent to Public Way Cleared 2/4/2020 ARMEN SARKISIAN
Sewer availability Cleared 3/16/2020 CELINA MORENO
Density Bonus 12.22.A.25 Cleared 5/19/2020 NICHOLAS KAWAZOE
"D" conditions Cleared 5/29/2020 KYLE WINSTON
ZA Case Cleared 5/29/2020 KYLE WINSTON
Green Code Cleared 6/30/2020 COLIN LOREDO
Encroachment in public way Cleared 7/1/2020 ELENA LOPEZ
Site Plan review Cleared 7/1/2020 RICHARD REASER
ZA Case Cleared 7/1/2020 RICHARD REASER
ZI Cleared 7/1/2020 RICHARD REASER
Miscellaneous Cleared 8/18/2020 ELAINE LEI

Contact Information

Architect Afari,, Frank; Lic. No.: C19872 1453 CLUBVIEW DRIVE      LOS ANGELES, CA 90024
Contractor Sinanian Development Inc; Lic. No.: 455273-A 18980 VENTURA BLVD SUITE 200      TARZANA, CA 91356
Engineer Minas,, Caro Jolfaie; Lic. No.: GE601 4742 SAN FERNANDO RD      GLENDALE, CA 91204
Engineer Soleymani,, Habib K; Lic. No.: S2575 1917 PARNELL AVE      LOS ANGELES, CA 90025

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 7/2/2021 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/2/2021 Partial Approval JONATHAN QUACH
Footing/Foundation/Slab 7/2/2021 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 7/6/2021 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/7/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/9/2021 Conditional Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 7/9/2021 Partial Approval JONATHAN QUACH
Footing/Foundation/Slab 7/9/2021 Approved JONATHAN QUACH
Deputy Reinf. Concrete 7/12/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/12/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 7/12/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/12/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 7/14/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/19/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/22/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/22/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/26/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/26/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/29/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 8/2/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/4/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/4/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/4/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/4/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 8/5/2021 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 8/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/9/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/11/2021 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 8/11/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/11/2021 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 8/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 8/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/18/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/26/2021 Order to Comply Issued EDWIN GREGORYONA
Deputy Reinf. Concrete 8/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/2/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/7/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/8/2021 Not Ready for Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 9/8/2021 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 9/8/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/8/2021 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 9/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/17/2021 Conditional Approval MARK FERRARI
Deputy Reinf. Concrete 9/22/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/15/2021 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/22/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/25/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/30/2021 Partial Approval RAFAEL ESPINOZA
Green Building Rough 11/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 12/21/2021 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/21/2021 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 12/21/2021 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 12/29/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/4/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/24/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/27/2022 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 2/15/2022 Approved EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/7/2022 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/7/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/7/2022 Approved EDWIN GREGORYONA
Green Building Rough 3/16/2022 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 3/16/2022 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/21/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/23/2022 Partial Inspection EDWIN GREGORYONA
Green Building Rough 3/23/2022 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/13/2022 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/13/2022 Partial Approval EDWIN GREGORYONA
Insulation 4/15/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 4/15/2022 Partial Approval EDWIN GREGORYONA
Insulation 4/19/2022 Partial Approval EDWIN GREGORYONA
Pre-Inspection 4/20/2022 Partial Approval EDWIN GREGORYONA
Insulation 4/25/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/28/2022 Partial Approval EDWIN GREGORYONA
Insulation 5/4/2022 Partial Approval EDWIN GREGORYONA
Insulation 5/20/2022 Partial Inspection EDWIN GREGORYONA
Insulation 5/24/2022 Partial Approval EDWIN GREGORYONA
Insulation 6/1/2022 Partial Inspection EDWIN GREGORYONA
Green Building Rough 6/22/2022 Approved EDWIN GREGORYONA
Wood Frame 6/22/2022 Partial Inspection EDWIN GREGORYONA
Insulation 7/20/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/1/2022 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 8/3/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 8/22/2022 Partial Approval JAMES POWERS
Drywall Nailing 8/29/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/14/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/11/2022 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 11/4/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/10/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/30/2022 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/7/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 12/20/2022 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 1/10/2023 Partial Approval EDWIN GREGORYONA
Posting Pre-Inspection 1/25/2023 Approved EDWIN GREGORYONA
Footing/Foundation/Slab 2/22/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 3/15/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/4/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/17/2023 Approved EDWIN GREGORYONA
Final 4/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 4/17/2023 Approved EDWIN GREGORYONA
Green Building Final 4/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/17/2023 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 4/17/2023 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 4/17/2023 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 4/17/2023 Not Ready for Inspection EDWIN GREGORYONA
Structural Steel Frame 4/17/2023 Approved EDWIN GREGORYONA
Wood Frame 4/17/2023 Approved EDWIN GREGORYONA
Green Building Final 5/9/2023 Approved EDWIN GREGORYONA
Final 5/22/2023 Not Ready for Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 5/22/2023 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 5/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Final 6/5/2023 Partial Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 6/5/2023 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 6/5/2023 Approved EDWIN GREGORYONA
Final 6/20/2023 Partial Inspection GREGORY POMISH
Special/Order Compliance 11/28/2023 Partial Inspection RAFAEL ESPINOZA
Final 12/18/2023 OK to Issue CofO EDWIN GREGORYONA