13574 W FOOTHILL BLVD 91342

Certificate Information: 13574 W FOOTHILL BLVD 91342

Application / Permit
18010-10000-04405
Plan Check / Job No.
B18LA15924
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 3-story, Type VA, 27- affordable units apartment, (3 low/23 moderate income units, and with 6 of those as apartment house /residential hotel, see comment), parking reduction option 2 per 12.22A25 and Residential Hotel ordinance.
Permit Issued
Issued on 3/11/2019
Issuing Office
Metro
Current Status
CofO Issued on 7/8/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/10/2018 APPLICANT
Assigned to Plan Check Engineer 9/6/2018 LARRY LEE
Corrections Issued 9/11/2018 LARRY LEE
Quality Review Completed 9/14/2018 CHARLES CHANG
Building Plans Picked Up 9/19/2018 APPLICANT
Applicant returned to address corrections 10/11/2018 LARRY LEE
Plan Check Approved 2/27/2019 LARRY LEE
Issued 3/11/2019 LADBS
TCO Issued (Expire Date: 09-22-2021) 3/26/2021 JEFFREY DURAN
CofO in Progress 7/7/2021 DANNY RODRIGUEZ
Permit Finaled 7/8/2021 RICKEY JACKSON
CofO Issued 7/8/2021 RICKEY JACKSON
Permit Finaled 7/8/2021 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 9/25/2018 HOWARD COOPER
Marquee approval - CUL Cleared 10/17/2018 HAROOT AVANESIAN
Trees in Parkway Cleared 10/22/2018 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 10/29/2018 RUDY TERRIQUEZ.
Sewer availability Cleared 10/29/2018 RUDY TERRIQUEZ.
Frnt yard landscape/Water mgmt Cleared 10/30/2018 IVORY CHAMBESHI
Opn space landscape/Water mgmt Cleared 10/30/2018 IVORY CHAMBESHI
Hydrant and Access approval Cleared 11/5/2018 JOHN DALLAS
Miscellaneous Cleared 11/9/2018 MARKOS PEREZ-BRAN
Green Code Cleared 11/28/2018 LARRY LEE
DAS Clearance Cleared 12/4/2018 LARRY LEE
Fire Marshall Fire Life Safety Cleared 12/5/2018 WILLIAM JOHNS
City owned building/parcel Cleared 1/10/2019 HAROOT AVANESIAN
Highway dedication Cleared 1/14/2019 LEE GUILBEAUX
Low Impact Development Cleared 1/14/2019 AMMAR ELTAWIL
Permit Cleared 1/14/2019 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 1/14/2019 LEE GUILBEAUX
Density Bonus 12.22.A.25 Cleared 2/25/2019 MICHAEL ZIRBES

Contact Information

Contractor G B Construction Inc; Lic. No.: 424458-B 1531 W REDONDO BEACH BLVD      GARDENA, CA 90247

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/8/2019 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/15/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 5/16/2019 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/17/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/20/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/23/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 5/23/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 5/24/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/24/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/29/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/29/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/20/2019 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/21/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/25/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 6/25/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/26/2019 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/26/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/27/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 7/24/2019 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 7/24/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/26/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 8/9/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/12/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 8/15/2019 Partial Approval DANNY RODRIGUEZ
Wall Anchors 8/22/2019 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 8/23/2019 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/5/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/18/2019 Corrections Issued DANNY RODRIGUEZ
Deputy Wood Construction 9/20/2019 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/20/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/26/2019 Partial Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/1/2019 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 10/2/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/3/2019 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/3/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 10/4/2019 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/7/2019 Partial Inspection JOHN KITCKO
Deputy Wood Construction 10/10/2019 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/15/2019 Partial Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/17/2019 Partial Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/22/2019 Partial Approval DANNY RODRIGUEZ
Green Building Rough 10/23/2019 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 10/23/2019 Partial Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/23/2019 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 10/23/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 10/24/2019 Partial Inspection ANDREW DORSO
Drywall Nailing 10/28/2019 Not Ready for Inspection ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 10/28/2019 Partial Inspection ANDREW DORSO
Insulation 10/28/2019 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 10/29/2019 Approved DANNY RODRIGUEZ
Drywall Nailing 10/29/2019 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/29/2019 Partial Approval DANNY RODRIGUEZ
Insulation 10/30/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 10/31/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/1/2019 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 11/4/2019 Corrections Issued DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/4/2019 Partial Approval DANNY RODRIGUEZ
Insulation 11/4/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/6/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/8/2019 Partial Approval DANNY RODRIGUEZ
Wood Frame 11/8/2019 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 11/12/2019 Approved DANNY RODRIGUEZ
Drywall Nailing 11/12/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/12/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/12/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/13/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/15/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/15/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/15/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 11/19/2019 Approved DANNY RODRIGUEZ
Drywall Nailing 11/19/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/19/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/19/2019 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 11/20/2019 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 11/22/2019 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/22/2019 Partial Approval DANNY RODRIGUEZ
Insulation 11/22/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/26/2019 Partial Approval DANNY RODRIGUEZ
Wood Frame 11/26/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/27/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/27/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/2/2019 Partial Approval DANNY RODRIGUEZ
Insulation 12/2/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/3/2019 Partial Approval DANNY RODRIGUEZ
Insulation 12/3/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 12/6/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 12/6/2019 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 12/6/2019 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/6/2019 Partial Inspection DANNY RODRIGUEZ
Wood Frame 12/6/2019 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 12/9/2019 Approved DANNY RODRIGUEZ
Interior/Exterior Lathing 12/9/2019 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 12/9/2019 Partial Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 12/11/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 12/16/2019 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 12/16/2019 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 12/18/2019 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 12/19/2019 Partial Inspection ANDREW DORSO
Drywall Nailing 12/20/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/20/2019 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 12/20/2019 Approved DANNY RODRIGUEZ
Interior/Exterior Lathing 12/20/2019 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/20/2019 Partial Inspection DANNY RODRIGUEZ
Wood Frame 12/20/2019 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 12/30/2019 Not Ready for Inspection ROBERT COLE
Insulation 12/30/2019 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 12/30/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 12/31/2019 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 12/31/2019 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 1/2/2020 Not Ready for Inspection JOHN KITCKO
Insulation 1/2/2020 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 1/2/2020 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 1/6/2020 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 1/6/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 1/7/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 1/8/2020 Partial Approval DANNY RODRIGUEZ
Insulation 1/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 1/9/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 1/10/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 1/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/13/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 1/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 1/14/2020 Partial Approval DANNY RODRIGUEZ
Insulation 1/14/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 1/14/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 1/22/2020 Not Ready for Inspection JAMES STEPHENS
Interior/Exterior Lathing 1/22/2020 Not Ready for Inspection JAMES STEPHENS
Deputy Wood Construction 2/3/2020 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 2/5/2020 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 2/6/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 2/7/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/2/2020 Not Ready for Inspection JAMES STEPHENS
Insulation 3/2/2020 Not Ready for Inspection JAMES STEPHENS
Insulation 3/3/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 3/3/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/5/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/9/2020 Partial Approval DANNY RODRIGUEZ
Insulation 3/9/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/11/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/11/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/11/2020 Partial Approval DANNY RODRIGUEZ
Insulation 3/12/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/13/2020 Partial Approval DANNY RODRIGUEZ
Insulation 3/13/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/17/2020 Partial Approval DANNY RODRIGUEZ
Insulation 3/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/18/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/19/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/19/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/20/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/15/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 4/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/28/2020 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 4/28/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/25/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/29/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/7/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/29/2020 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/30/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/6/2020 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/13/2020 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/20/2020 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 8/28/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/8/2020 Approved DANNY RODRIGUEZ
Deputy Drilled-In Anchors 9/17/2020 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 9/25/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/25/2020 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/24/2020 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/25/2020 Conditional Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 12/7/2020 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 12/14/2020 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 12/15/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/15/2020 Conditional Approval DANNY RODRIGUEZ
Final 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 12/17/2020 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 1/26/2021 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 1/26/2021 Partial Inspection DANNY RODRIGUEZ
Wood Frame 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/5/2021 OK for TCO DANNY RODRIGUEZ
Footing/Foundation/Slab 3/5/2021 Approved DANNY RODRIGUEZ
Green Building Final 3/5/2021 Approved DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 3/5/2021 SGSOV Approved DANNY RODRIGUEZ
Smoke Detectors 3/5/2021 Approved DANNY RODRIGUEZ
Verify Sprinkler Sign Off 3/5/2021 Approved DANNY RODRIGUEZ
Wood Frame 3/5/2021 Approved DANNY RODRIGUEZ
Final 6/28/2021 Not Ready for Inspection JOE VELASQUEZ
Final 6/30/2021 Partial Inspection DANNY RODRIGUEZ