Pre-Inspection
|
2/6/2020
|
Partial Inspection
|
JEFFREY DURAN
|
Pre-Inspection
|
2/7/2020
|
Corrections Issued
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/14/2020
|
Conditional Approval
|
ROBERT COLE
|
Excavation/Setback/Form/Re-Bar
|
2/14/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
Footing/Foundation/Slab
|
2/14/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
Deputy Reinf. Concrete
|
2/18/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
2/18/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/19/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/20/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/21/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/25/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Footing/Foundation/Slab
|
2/25/2020
|
Partial Inspection
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/26/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/27/2020
|
Approved
|
JEFFREY DURAN
|
Green Building Rough
|
2/27/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
Reinforced Concrete Frame
|
2/27/2020
|
Partial Approval
|
JEFFREY DURAN
|
Verify Sprinkler Sign Off
|
2/27/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
2/28/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/3/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/4/2020
|
Approved
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
3/4/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/5/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/6/2020
|
Approved
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
3/6/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/9/2020
|
Conditional Approval
|
JAMES STEPHENS
|
Deputy Reinf. Concrete
|
3/10/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/12/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/16/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
3/18/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/20/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/26/2020
|
Approved
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
3/26/2020
|
Partial Inspection
|
JEFFREY DURAN
|
Footing/Foundation/Slab
|
3/26/2020
|
Partial Inspection
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/27/2020
|
Approved
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
3/27/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
3/31/2020
|
Approved
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
3/31/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/1/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
4/2/2020
|
Partial Inspection
|
JEFFREY DURAN
|
Special/Order Compliance
|
4/2/2020
|
Partial Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/3/2020
|
Conditional Approval
|
ROBERT COLE
|
Excavation/Setback/Form/Re-Bar
|
4/3/2020
|
Partial Approval
|
ROBERT COLE
|
Deputy Reinf. Concrete
|
4/6/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/7/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Excavation/Setback/Form/Re-Bar
|
4/7/2020
|
Partial Approval
|
DANIEL VARNUM
|
Excavation/Setback/Form/Re-Bar
|
4/7/2020
|
Partial Inspection
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
4/8/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
4/9/2020
|
Conditional Approval
|
ROBERT COLE
|
Deputy Drilled-In Anchors
|
4/13/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
4/13/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Shotcrete
|
4/13/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Excavation/Setback/Form/Re-Bar
|
4/13/2020
|
Partial Approval
|
DANIEL VARNUM
|
Deputy Drilled-In Anchors
|
4/14/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
4/14/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
4/14/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
4/14/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
4/14/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Drilled-In Anchors
|
4/15/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
4/15/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Shotcrete
|
4/15/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Excavation/Setback/Form/Re-Bar
|
4/15/2020
|
Partial Approval
|
DANIEL VARNUM
|
Deputy Drilled-In Anchors
|
4/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
4/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Shotcrete
|
4/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
4/16/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Drilled-In Anchors
|
4/17/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
4/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Shotcrete
|
4/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
4/17/2020
|
Partial Approval
|
ROBERT DAVIS
|
Footing/Foundation/Slab
|
4/17/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Drilled-In Anchors
|
4/20/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
4/20/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
4/20/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
4/20/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Excavation/Setback/Form/Re-Bar
|
4/20/2020
|
Partial Approval
|
DANIEL VARNUM
|
Deputy Drilled-In Anchors
|
4/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
4/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Shotcrete
|
4/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
4/21/2020
|
Not Ready for Inspection
|
DANIEL VARNUM
|
Masonry Wall/Backfill
|
4/21/2020
|
Partial Approval
|
DANIEL VARNUM
|
Deputy Drilled-In Anchors
|
4/22/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
4/22/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Shotcrete
|
4/22/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Drilled-In Anchors
|
4/23/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/23/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
4/23/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Drilled-In Anchors
|
4/24/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/24/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
4/24/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/27/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
4/27/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
4/27/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
4/28/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
4/28/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
4/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Shotcrete
|
4/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
4/29/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
4/30/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Shotcrete
|
4/30/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Footing/Foundation/Slab
|
4/30/2020
|
Partial Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
5/1/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/1/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
5/1/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/4/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Shotcrete
|
5/4/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Concrete
|
5/5/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/5/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/6/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
5/6/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
5/7/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/7/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
5/7/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/8/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/8/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
5/8/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Shotcrete
|
5/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
5/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
5/12/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/12/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Shotcrete
|
5/12/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
5/12/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
5/13/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/13/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
5/13/2020
|
Partial Approval
|
DANIEL VARNUM
|
Excavation/Setback/Form/Re-Bar
|
5/13/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
5/13/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/14/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/14/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
5/14/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Footing/Foundation/Slab
|
5/14/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/15/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/15/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
5/15/2020
|
Partial Inspection
|
JEFFREY FULTON
|
Deputy Reinf. Concrete
|
5/18/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Shotcrete
|
5/18/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
5/19/2020
|
Conditional Approval
|
ROBERT COLE
|
Deputy Shotcrete
|
5/19/2020
|
Conditional Approval
|
ROBERT COLE
|
Excavation/Setback/Form/Re-Bar
|
5/19/2020
|
Not Ready for Inspection
|
ROBERT COLE
|
Deputy Reinf. Concrete
|
5/20/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Shotcrete
|
5/20/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
5/20/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
5/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Shotcrete
|
5/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
5/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
5/22/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
5/26/2020
|
Conditional Approval
|
ROBERT COLE
|
Deputy Shotcrete
|
5/26/2020
|
Conditional Approval
|
ROBERT COLE
|
Excavation/Setback/Form/Re-Bar
|
5/26/2020
|
Partial Approval
|
ROBERT COLE
|
Deputy Reinf. Concrete
|
5/27/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Shotcrete
|
5/27/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
5/27/2020
|
Approved
|
HAMID PISHEHVAR
|
Masonry Wall/Backfill
|
5/27/2020
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
5/28/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Deputy Shotcrete
|
5/28/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Excavation/Setback/Form/Re-Bar
|
5/28/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
5/28/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
5/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Shotcrete
|
5/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
5/29/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/2/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
6/2/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
6/3/2020
|
Conditional Approval
|
ROBERT COLE
|
Deputy Reinf. Concrete
|
6/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/4/2020
|
Partial Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
6/4/2020
|
Partial Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/5/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
6/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
6/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/8/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/9/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
6/10/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/10/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/11/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Footing/Foundation/Slab
|
6/11/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/12/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/12/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/15/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
6/15/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
6/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
6/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Reinforced Masonry Frame
|
6/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
6/17/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
6/17/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/18/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
6/18/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/18/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/19/2020
|
Conditional Approval
|
JEFFREY FULTON
|
Masonry Wall/Backfill
|
6/22/2020
|
Partial Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/23/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
6/24/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
6/25/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/25/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/26/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
6/26/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Masonry Wall/Backfill
|
6/26/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
6/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
6/29/2020
|
Partial Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
6/29/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
6/30/2020
|
Conditional Approval
|
DANNY RODRIGUEZ
|
Deputy Steel/Welding
|
6/30/2020
|
Conditional Approval
|
DANNY RODRIGUEZ
|
Excavation/Setback/Form/Re-Bar
|
6/30/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
Deputy Reinf. Concrete
|
7/1/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/1/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/1/2020
|
Partial Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
7/1/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/2/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/2/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/2/2020
|
Partial Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
7/2/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/6/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Steel/Welding
|
7/6/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Reinf. Concrete
|
7/7/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/7/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/7/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/8/2020
|
Partial Approval
|
ROBERT DAVIS
|
Footing/Foundation/Slab
|
7/8/2020
|
Partial Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
7/8/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/9/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
7/9/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
7/10/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/10/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/10/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/13/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/13/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/14/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/15/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/15/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/15/2020
|
Partial Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
7/15/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Reinforced Concrete Frame
|
7/16/2020
|
Partial Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
7/16/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/20/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/20/2020
|
Order to Comply Issued
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/21/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
7/21/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/21/2020
|
Partial Approval
|
ROBERT DAVIS
|
Reinforced Concrete Frame
|
7/21/2020
|
Corrections Issued
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/22/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
7/22/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
7/23/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/23/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Footing/Foundation/Slab
|
7/23/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
7/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/27/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Wood Construction
|
7/27/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
7/27/2020
|
Approved
|
HAMID PISHEHVAR
|
Footing/Foundation/Slab
|
7/27/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
Green Building Rough
|
7/27/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
Light Gage Steel Frame
|
7/27/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
Reinforced Concrete Frame
|
7/27/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
Verify Sprinkler Sign Off
|
7/27/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
7/28/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
7/28/2020
|
Partial Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/28/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
7/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
7/30/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Wood Construction
|
7/30/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
7/31/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
7/31/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
7/31/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/4/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Steel/Welding
|
8/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
8/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/5/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/5/2020
|
Approved
|
HAMID PISHEHVAR
|
Light Gage Steel Frame
|
8/5/2020
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
Deputy Reinf. Concrete
|
8/6/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
8/6/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/7/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/7/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
8/7/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/10/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Excavation/Setback/Form/Re-Bar
|
8/11/2020
|
Order to Comply Issued
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/12/2020
|
Approved
|
HAMID PISHEHVAR
|
Excavation/Setback/Form/Re-Bar
|
8/12/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/17/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
8/17/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/18/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
8/18/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
8/18/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
8/18/2020
|
Partial Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
8/18/2020
|
Partial Inspection
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
8/18/2020
|
Partial Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/19/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
8/19/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
8/19/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Excavation/Setback/Form/Re-Bar
|
8/19/2020
|
Partial Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
8/19/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Concrete
|
8/20/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Reinf. Masonry
|
8/20/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Steel/Welding
|
8/20/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Reinf. Concrete
|
8/21/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
8/21/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
8/21/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
8/21/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
8/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
8/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
8/25/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/25/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
8/26/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/26/2020
|
Approved
|
HAMID PISHEHVAR
|
Reinforced Masonry Frame
|
8/26/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
8/27/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
8/27/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
8/28/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Steel/Welding
|
8/28/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Steel/Welding
|
8/31/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Reinf. Masonry
|
9/1/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/1/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
9/1/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/2/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
9/2/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
9/3/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/3/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
9/3/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
9/3/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
9/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/8/2020
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Reinf. Masonry
|
9/9/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
9/9/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/10/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
9/11/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
9/11/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/14/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/14/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/15/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/15/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/16/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/17/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/18/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Steel/Welding
|
9/18/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Insulation
|
9/18/2020
|
No Access for Inspection
|
DANIEL VARNUM
|
Light Gage Steel Frame
|
9/18/2020
|
Partial Approval
|
DANIEL VARNUM
|
Reinforced Masonry Frame
|
9/18/2020
|
Partial Approval
|
DANIEL VARNUM
|
Deputy Steel/Welding
|
9/21/2020
|
Conditional Approval
|
DANIEL VARNUM
|
Deputy Reinf. Masonry
|
9/22/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
9/22/2020
|
Approved
|
HAMID PISHEHVAR
|
Light Gage Steel Frame
|
9/22/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
9/23/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/23/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/24/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Drywall Nailing
|
9/24/2020
|
Partial Approval
|
ROBERT DAVIS
|
Footing/Foundation/Slab
|
9/24/2020
|
Partial Approval
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
9/24/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/25/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/25/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Drywall Nailing
|
9/25/2020
|
Partial Approval
|
ROBERT DAVIS
|
Green Building Rough
|
9/25/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/28/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/28/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
9/28/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
9/29/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
9/30/2020
|
Approved
|
JEFFREY DURAN
|
Deputy Steel/Welding
|
9/30/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/1/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/1/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/2/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/2/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/5/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/6/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/6/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/7/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/7/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/9/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/9/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/13/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/13/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/14/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/14/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
10/14/2020
|
Partial Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
10/14/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/15/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/15/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
10/15/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
10/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Light Gage Steel Frame
|
10/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
10/19/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/20/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/20/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/20/2020
|
No Access for Inspection
|
ELMER BLAND
|
Deputy Reinf. Masonry
|
10/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
10/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Wood Construction
|
10/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
10/22/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/22/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Insulation
|
10/22/2020
|
Partial Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/23/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/23/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/26/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/26/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Insulation
|
10/26/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/27/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/27/2020
|
Approved
|
ROBERT DAVIS
|
Green Building Rough
|
10/27/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Masonry Wall/Backfill
|
10/27/2020
|
Partial Approval
|
ROBERT DAVIS
|
Verify Sprinkler Sign Off
|
10/27/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/28/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
10/28/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
10/29/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/29/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
10/30/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
10/30/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/2/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/2/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/4/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/4/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/5/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/5/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/6/2020
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/6/2020
|
Approved
|
ROBERT DAVIS
|
Insulation
|
11/6/2020
|
Order to Comply Issued
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
11/6/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/9/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/9/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/10/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/10/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/12/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/12/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
11/13/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
11/13/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Reinf. Masonry
|
11/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Drywall Nailing
|
11/17/2020
|
Partial Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
11/17/2020
|
Partial Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
11/17/2020
|
Partial Approval
|
ROBERT DAVIS
|
Interior/Exterior Lathing
|
11/18/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Wood Construction
|
11/20/2020
|
Conditional Approval
|
JEFFREY DURAN
|
Drywall Nailing
|
11/23/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Green Building Rough
|
11/23/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Insulation
|
11/23/2020
|
Partial Approval
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
11/23/2020
|
Order to Comply Issued
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
11/24/2020
|
Conditional Approval
|
RICKEY JACKSON
|
Deputy Steel/Welding
|
11/25/2020
|
Approved
|
JOHN KITCKO
|
Deputy Reinf. Masonry
|
11/30/2020
|
Approved
|
JOHN KITCKO
|
Deputy Shotcrete
|
11/30/2020
|
Approved
|
JOHN KITCKO
|
Deputy Steel/Welding
|
11/30/2020
|
Approved
|
JOHN KITCKO
|
Insulation
|
11/30/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
Reinforced Masonry Frame
|
11/30/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Reinf. Masonry
|
12/1/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Shotcrete
|
12/1/2020
|
Order to Comply Issued
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/1/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/2/2020
|
Conditional Approval
|
RICKEY JACKSON
|
Deputy Wood Construction
|
12/2/2020
|
Conditional Approval
|
RICKEY JACKSON
|
Interior/Exterior Lathing
|
12/2/2020
|
Partial Approval
|
RICKEY JACKSON
|
Deputy Steel/Welding
|
12/3/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/4/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/7/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/8/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/9/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Interior/Exterior Lathing
|
12/9/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/10/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Drywall Nailing
|
12/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Green Building Rough
|
12/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Light Gage Steel Frame
|
12/11/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/14/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/15/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/16/2020
|
Approved
|
HAMID PISHEHVAR
|
Insulation
|
12/16/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/17/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/18/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/21/2020
|
Approved
|
HAMID PISHEHVAR
|
Light Gage Steel Frame
|
12/21/2020
|
Partial Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
12/23/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/29/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
12/30/2020
|
Conditional Approval
|
ROBERT DAVIS
|
Drywall Nailing
|
12/30/2020
|
Partial Approval
|
ROBERT DAVIS
|
Light Gage Steel Frame
|
12/30/2020
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
12/31/2020
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
1/4/2021
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
1/5/2021
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
1/6/2021
|
Approved
|
ROBERT DAVIS
|
Drywall Nailing
|
1/6/2021
|
Partial Approval
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
1/7/2021
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
1/8/2021
|
Conditional Approval
|
JEFFREY DURAN
|
Deputy Steel/Welding
|
1/12/2021
|
No Result Entered
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
1/13/2021
|
Approved
|
ROBERT DAVIS
|
Deputy Steel/Welding
|
1/14/2021
|
Approved
|
HAMID PISHEHVAR
|
Deputy Steel/Welding
|
1/15/2021
|
Approved
|
HAMID PISHEHVAR
|