6233 N VARIEL AVE 91367

Certificate Information: 6233 N VARIEL AVE 91367

Application / Permit
18010-10000-04241
Plan Check / Job No.
B18LA18419
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 8 story336-unit Type IA assisted living facility over 1 level subterranean parking.
Permit Issued
Issued on 7/3/2019
Issuing Office
Metro
Current Status
CofO Issued on 8/31/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/12/2018 APPLICANT
Disabled Access Plans Picked Up 9/20/2018 APPLICANT
Green Plans Picked Up 10/1/2018 APPLICANT
Assigned to Plan Check Engineer 10/4/2018 QUAN NGHIEM
Corrections Issued 11/13/2018 QUAN NGHIEM
Quality Review Completed 11/16/2018 SHAHEN AKELYAN
Building Plans Picked Up 11/21/2018 APPLICANT
Applicant returned to address corrections 12/14/2018 QUAN NGHIEM
Applicant returned to address corrections 1/9/2019 QUAN NGHIEM
Applicant returned to address corrections 1/10/2019 QUAN NGHIEM
Applicant returned to address corrections 1/11/2019 QUAN NGHIEM
Applicant returned to address corrections 1/18/2019 QUAN NGHIEM
Applicant returned to address corrections 1/25/2019 QUAN NGHIEM
Applicant returned to address corrections 1/31/2019 QUAN NGHIEM
Applicant returned to address corrections 4/29/2019 QUAN NGHIEM
Plan Check Approved 6/26/2019 QUAN NGHIEM
Issued 7/3/2019 LADBS
TCO Issued (Expire Date: 12-12-2022) 6/15/2022 JEFFREY DURAN
CofO in Progress 8/23/2022 ROBERT DAVIS
Permit Finaled 8/31/2022 JEFFREY DURAN
CofO Issued 8/31/2022 JEFFREY DURAN
Permit Finaled 8/31/2022 JEFFREY DURAN

Permit Application Clearance Information

Highway dedication Cleared 1/18/2019 LEE GUILBEAUX
Hydrant and Access approval Cleared 1/18/2019 JOHN DALLAS
Sewer availability Cleared 1/29/2019 KARAN PATEL
Eng Process Fee Ord 176,300 Cleared 2/21/2019 JEANETTE VONG
DAS Clearance Cleared 3/5/2019 WAI LAU
Fire Marshall Fire Life Safety Cleared 3/5/2019 VIDAL GARCIA
Green Code Cleared 3/12/2019 KHEDER ALRAZAA
Low Impact Development Cleared 3/19/2019 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 3/20/2019 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 4/1/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/1/2019 CALOSHA APPROVED
Driveway location Cleared 6/13/2019 SHIRLEY ZAMORA
Miscellaneous Cleared 6/19/2019 ANNA VAN
Site Plan review Cleared 6/19/2019 ANNA VAN
Specific Plan Cleared 6/19/2019 ANNA VAN

Contact Information

Architect Van, Tilburg, Johannes F P; Lic. No.: C6457 1738 BERKELEY STREET      SANTA MONICA, CA 90404
Contractor O'Neil W E Construction Co Of California; Lic. No.: 494031-B 909 N PACIFIC COAST HWY   STE 400    EL SEGUNDO, CA 90245
Engineer Ghodsi,, Afshin; Lic. No.: S3248 888 S FIGUEROA ST 18TH FLOOR      LOS ANGELES, CA 90017

Inspector Information

CAMERON CHABAN, (818) 374-1128 Office Hours: 7:00-8:00 AM MON-FRI
ROBERT DAVIS, (818) 374-1128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/6/2020 Partial Inspection JEFFREY DURAN
Pre-Inspection 2/7/2020 Corrections Issued JEFFREY DURAN
Deputy Reinf. Concrete 2/14/2020 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 2/14/2020 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 2/14/2020 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 2/18/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 2/18/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/19/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/20/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/21/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/25/2020 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 2/25/2020 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 2/26/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/27/2020 Approved JEFFREY DURAN
Green Building Rough 2/27/2020 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 2/27/2020 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 2/27/2020 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Concrete 2/28/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/3/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/4/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 3/4/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/5/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/6/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 3/6/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/9/2020 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 3/10/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/12/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/16/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 3/18/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/20/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/26/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 3/26/2020 Partial Inspection JEFFREY DURAN
Footing/Foundation/Slab 3/26/2020 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 3/27/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 3/27/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/31/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 3/31/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/1/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/2/2020 Approved JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 4/2/2020 Partial Inspection JEFFREY DURAN
Special/Order Compliance 4/2/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/3/2020 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 4/3/2020 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 4/6/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/7/2020 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 4/7/2020 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 4/7/2020 Partial Inspection DANIEL VARNUM
Deputy Reinf. Concrete 4/8/2020 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 4/9/2020 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 4/13/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/13/2020 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 4/13/2020 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 4/13/2020 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/14/2020 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 4/14/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 4/14/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/14/2020 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 4/14/2020 Partial Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 4/15/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/15/2020 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 4/15/2020 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 4/15/2020 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/16/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/16/2020 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/16/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/16/2020 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/17/2020 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/17/2020 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/17/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/17/2020 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 4/17/2020 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/20/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/20/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/20/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 4/20/2020 Conditional Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 4/20/2020 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/21/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 4/21/2020 Approved HAMID PISHEHVAR
Deputy Shotcrete 4/21/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 4/21/2020 Not Ready for Inspection DANIEL VARNUM
Masonry Wall/Backfill 4/21/2020 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/22/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/22/2020 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 4/22/2020 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/23/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/23/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 4/23/2020 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 4/24/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/24/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 4/24/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/27/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 4/27/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 4/27/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/28/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 4/28/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/29/2020 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/29/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/29/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/30/2020 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 4/30/2020 Conditional Approval DANIEL VARNUM
Footing/Foundation/Slab 4/30/2020 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 5/1/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/1/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/1/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/4/2020 Conditional Approval DANIEL VARNUM
Deputy Shotcrete 5/4/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 5/5/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/5/2020 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 5/6/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 5/6/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/7/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/7/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/7/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/8/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/8/2020 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 5/8/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/11/2020 Approved HAMID PISHEHVAR
Deputy Shotcrete 5/11/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 5/11/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 5/12/2020 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 5/12/2020 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/12/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/12/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/13/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/13/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/13/2020 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 5/13/2020 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 5/13/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/14/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/14/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 5/14/2020 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 5/14/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/15/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/15/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/15/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 5/18/2020 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 5/18/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/19/2020 Conditional Approval ROBERT COLE
Deputy Shotcrete 5/19/2020 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 5/19/2020 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 5/20/2020 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/20/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/20/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/21/2020 Approved HAMID PISHEHVAR
Deputy Shotcrete 5/21/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 5/21/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 5/22/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/26/2020 Conditional Approval ROBERT COLE
Deputy Shotcrete 5/26/2020 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 5/26/2020 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 5/27/2020 Approved HAMID PISHEHVAR
Deputy Shotcrete 5/27/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 5/27/2020 Approved HAMID PISHEHVAR
Masonry Wall/Backfill 5/27/2020 Not Ready for Inspection HAMID PISHEHVAR
Deputy Reinf. Concrete 5/28/2020 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 5/28/2020 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/28/2020 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 5/28/2020 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/29/2020 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/29/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/29/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/2/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 6/2/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 6/3/2020 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 6/4/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/4/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/4/2020 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 6/5/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/8/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/8/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/8/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/9/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 6/10/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/10/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/11/2020 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 6/11/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/12/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/12/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/15/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 6/15/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 6/16/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 6/16/2020 Approved HAMID PISHEHVAR
Reinforced Masonry Frame 6/16/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 6/17/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/17/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/18/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 6/18/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/18/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/19/2020 Conditional Approval JEFFREY FULTON
Masonry Wall/Backfill 6/22/2020 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/23/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/24/2020 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 6/24/2020 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 6/25/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/25/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/26/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/26/2020 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 6/26/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/29/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/29/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/29/2020 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 6/29/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/30/2020 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 6/30/2020 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/30/2020 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/1/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/1/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/1/2020 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/1/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/2/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/2/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/2/2020 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/2/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/6/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/6/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/7/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/7/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/7/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/8/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/8/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/8/2020 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 7/8/2020 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/8/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/9/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 7/9/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 7/10/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/10/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/10/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/13/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/13/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/14/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/15/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/15/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/15/2020 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 7/15/2020 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/16/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/16/2020 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 7/16/2020 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 7/16/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/17/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/17/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/17/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/20/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/20/2020 Order to Comply Issued ROBERT DAVIS
Deputy Reinf. Concrete 7/21/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/21/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 7/21/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/21/2020 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 7/21/2020 Corrections Issued ROBERT DAVIS
Deputy Reinf. Concrete 7/22/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 7/22/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 7/23/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/23/2020 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 7/23/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/24/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/24/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/27/2020 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 7/27/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 7/27/2020 Approved HAMID PISHEHVAR
Footing/Foundation/Slab 7/27/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 7/27/2020 Partial Approval HAMID PISHEHVAR
Light Gage Steel Frame 7/27/2020 Partial Approval HAMID PISHEHVAR
Reinforced Concrete Frame 7/27/2020 Partial Approval HAMID PISHEHVAR
Verify Sprinkler Sign Off 7/27/2020 Partial Approval HAMID PISHEHVAR
Deputy Reinf. Concrete 7/28/2020 Partial Approval ROBERT DAVIS
Deputy Wood Construction 7/28/2020 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/28/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/29/2020 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/29/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/30/2020 Approved HAMID PISHEHVAR
Deputy Wood Construction 7/30/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 7/31/2020 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/31/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/31/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/4/2020 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 8/4/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/4/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/5/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/5/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 8/5/2020 Not Ready for Inspection HAMID PISHEHVAR
Deputy Reinf. Concrete 8/6/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/6/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/7/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/7/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 8/7/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/10/2020 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 8/11/2020 Order to Comply Issued ROBERT DAVIS
Deputy Reinf. Concrete 8/12/2020 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 8/12/2020 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/17/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 8/17/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/17/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/18/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/18/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/18/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/18/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/18/2020 Partial Inspection ROBERT DAVIS
Masonry Wall/Backfill 8/18/2020 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 8/19/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/19/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/19/2020 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/19/2020 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 8/19/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/20/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 8/20/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 8/20/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 8/21/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/21/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/21/2020 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 8/21/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/24/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/24/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/25/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/25/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 8/26/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/26/2020 Approved HAMID PISHEHVAR
Reinforced Masonry Frame 8/26/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 8/27/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 8/27/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 8/28/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 8/28/2020 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 8/31/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/1/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/1/2020 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 9/1/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/2/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 9/2/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 9/3/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/3/2020 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 9/3/2020 Conditional Approval ROBERT DAVIS
Reinforced Masonry Frame 9/3/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/4/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/4/2020 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 9/4/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/8/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/8/2020 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 9/9/2020 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 9/9/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/10/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 9/11/2020 Conditional Approval ROBERT DAVIS
Reinforced Masonry Frame 9/11/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/14/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/14/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/15/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/15/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/16/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/16/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/17/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/17/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/18/2020 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 9/18/2020 Conditional Approval DANIEL VARNUM
Insulation 9/18/2020 No Access for Inspection DANIEL VARNUM
Light Gage Steel Frame 9/18/2020 Partial Approval DANIEL VARNUM
Reinforced Masonry Frame 9/18/2020 Partial Approval DANIEL VARNUM
Deputy Steel/Welding 9/21/2020 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 9/22/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 9/22/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 9/22/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 9/23/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/23/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/24/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/24/2020 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/24/2020 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 9/24/2020 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 9/24/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/25/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/25/2020 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/25/2020 Partial Approval ROBERT DAVIS
Green Building Rough 9/25/2020 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Masonry 9/28/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/28/2020 Conditional Approval ROBERT DAVIS
Reinforced Masonry Frame 9/28/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/29/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/29/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/30/2020 Approved JEFFREY DURAN
Deputy Steel/Welding 9/30/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/1/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/1/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/2/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/2/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/5/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/6/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/6/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/7/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/7/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/8/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/8/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/9/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/9/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/13/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/13/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/14/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/14/2020 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 10/14/2020 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 10/14/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/15/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/15/2020 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 10/15/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/16/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 10/16/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 10/16/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 10/19/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/20/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/20/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/20/2020 No Access for Inspection ELMER BLAND
Deputy Reinf. Masonry 10/21/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 10/21/2020 Approved HAMID PISHEHVAR
Deputy Wood Construction 10/21/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 10/22/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/22/2020 Conditional Approval ROBERT DAVIS
Insulation 10/22/2020 Partial Inspection ROBERT DAVIS
Deputy Reinf. Masonry 10/23/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/23/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/26/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/26/2020 Conditional Approval ROBERT DAVIS
Insulation 10/26/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/27/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 10/27/2020 Approved ROBERT DAVIS
Green Building Rough 10/27/2020 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 10/27/2020 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 10/27/2020 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Masonry 10/28/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 10/28/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 10/29/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 10/29/2020 Approved ROBERT DAVIS
Deputy Reinf. Masonry 10/30/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 10/30/2020 Approved ROBERT DAVIS
Deputy Reinf. Masonry 11/2/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 11/2/2020 Approved ROBERT DAVIS
Deputy Reinf. Masonry 11/4/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 11/4/2020 Approved ROBERT DAVIS
Deputy Reinf. Masonry 11/5/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 11/5/2020 Approved ROBERT DAVIS
Deputy Reinf. Masonry 11/6/2020 Approved ROBERT DAVIS
Deputy Steel/Welding 11/6/2020 Approved ROBERT DAVIS
Insulation 11/6/2020 Order to Comply Issued ROBERT DAVIS
Reinforced Masonry Frame 11/6/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/9/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/9/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/10/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/10/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/12/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/12/2020 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/13/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 11/13/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Masonry 11/16/2020 Approved HAMID PISHEHVAR
Drywall Nailing 11/17/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/17/2020 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 11/17/2020 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 11/18/2020 Partial Approval ROBERT DAVIS
Deputy Wood Construction 11/20/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 11/23/2020 Not Ready for Inspection ROBERT DAVIS
Green Building Rough 11/23/2020 Not Ready for Inspection ROBERT DAVIS
Insulation 11/23/2020 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 11/23/2020 Order to Comply Issued ROBERT DAVIS
Deputy Steel/Welding 11/24/2020 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 11/25/2020 Approved JOHN KITCKO
Deputy Reinf. Masonry 11/30/2020 Approved JOHN KITCKO
Deputy Shotcrete 11/30/2020 Approved JOHN KITCKO
Deputy Steel/Welding 11/30/2020 Approved JOHN KITCKO
Insulation 11/30/2020 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 11/30/2020 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/1/2020 Approved HAMID PISHEHVAR
Deputy Shotcrete 12/1/2020 Order to Comply Issued HAMID PISHEHVAR
Deputy Steel/Welding 12/1/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/2/2020 Conditional Approval RICKEY JACKSON
Deputy Wood Construction 12/2/2020 Conditional Approval RICKEY JACKSON
Interior/Exterior Lathing 12/2/2020 Partial Approval RICKEY JACKSON
Deputy Steel/Welding 12/3/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/4/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/7/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/8/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/9/2020 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 12/9/2020 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 12/10/2020 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/11/2020 Approved HAMID PISHEHVAR
Drywall Nailing 12/11/2020 Approved HAMID PISHEHVAR
Green Building Rough 12/11/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 12/11/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/14/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/15/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/16/2020 Approved HAMID PISHEHVAR
Insulation 12/16/2020 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 12/17/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/18/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/21/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 12/21/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/23/2020 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 12/29/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 12/30/2020 Conditional Approval ROBERT DAVIS
Drywall Nailing 12/30/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/30/2020 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 12/31/2020 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/4/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/5/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/6/2021 Approved ROBERT DAVIS
Drywall Nailing 1/6/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 1/7/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 1/8/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 1/12/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 1/13/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 1/14/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/15/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/19/2021 Approved HAMID PISHEHVAR
Footing/Foundation/Slab 1/19/2021 Partial Approval HAMID PISHEHVAR
Light Gage Steel Frame 1/19/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/20/2021 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 1/20/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 1/21/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/22/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/25/2021 Approved HAMID PISHEHVAR
Drywall Nailing 1/25/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/25/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 1/26/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/27/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 1/28/2021 Approved ROBERT DAVIS
Drywall Nailing 1/28/2021 Order to Comply Issued ROBERT DAVIS
Light Gage Steel Frame 1/28/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 1/29/2021 Approved ROBERT DAVIS
Masonry Wall/Backfill 1/29/2021 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 1/29/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 2/1/2021 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 2/1/2021 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 2/1/2021 Order to Comply Issued ROBERT DAVIS
Deputy Steel/Welding 2/2/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/3/2021 Conditional Approval ROBERT DAVIS
Drywall Nailing 2/3/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/3/2021 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 2/4/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/5/2021 Approved ROBERT DAVIS
Drywall Nailing 2/5/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/5/2021 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 2/5/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 2/8/2021 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 2/8/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/9/2021 Partial Approval ROBERT DAVIS
Wall Anchors 2/9/2021 Approved ROBERT DAVIS
Drywall Nailing 2/11/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/11/2021 Partial Approval ROBERT DAVIS
Structural Steel Frame 2/11/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 2/16/2021 Corrections Issued ROBERT DAVIS
Deputy Steel/Welding 2/17/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/18/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/19/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/22/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/23/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 2/24/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/25/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/26/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/1/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/2/2021 Approved HAMID PISHEHVAR
Light Gage Steel Frame 3/2/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/3/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/4/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/5/2021 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 3/5/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/8/2021 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/8/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/9/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/10/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 3/11/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 3/12/2021 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 3/12/2021 OK to Expire Permit ROBERT DAVIS
Deputy Steel/Welding 3/15/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 3/16/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 3/17/2021 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/17/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 3/18/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/19/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/22/2021 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 3/22/2021 Order to Comply Issued ROBERT DAVIS
Deputy Steel/Welding 3/23/2021 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 3/23/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/24/2021 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/25/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/25/2021 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/25/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 3/26/2021 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/26/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/30/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/31/2021 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 3/31/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/1/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/5/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/6/2021 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 4/6/2021 Partial Approval HAMID PISHEHVAR
Deputy Steel/Welding 4/7/2021 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 4/7/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 4/8/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/9/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 4/12/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/13/2021 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 4/14/2021 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 4/14/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/15/2021 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/15/2021 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/16/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 4/19/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/20/2021 Approved ROBERT DAVIS
Deputy Steel/Welding 4/21/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/22/2021 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/23/2021 Approved ROBERT DAVIS
Light Gage Steel Frame 4/26/2021 Partial Approval HAMID PISHEHVAR
Insulation 5/5/2021 Partial Inspection ROBERT DAVIS
Insulation 5/13/2021 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 5/21/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/21/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/24/2021 Partial Approval ROBERT DAVIS
Insulation 5/25/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 5/25/2021 OK to Expire Permit ROBERT DAVIS
Deputy Wood Construction 5/27/2021 Approved HAMID PISHEHVAR
Drywall Nailing 6/1/2021 Partial Approval CAMERON CHABAN
Interior/Exterior Lathing 6/2/2021 Partial Approval ROBERT DAVIS
Insulation 6/4/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 6/4/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/8/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/9/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/10/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 6/11/2021 Partial Approval CAMERON CHABAN
Insulation 6/11/2021 Partial Approval CAMERON CHABAN
Interior/Exterior Lathing 6/11/2021 Partial Approval CAMERON CHABAN
Drywall Nailing 6/15/2021 Not Ready for Inspection ROBERT DAVIS
Insulation 6/15/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 6/15/2021 Partial Inspection ROBERT DAVIS
Insulation 6/18/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/18/2021 Partial Approval ROBERT DAVIS
Deputy Wood Construction 6/23/2021 Conditional Approval ROBERT DAVIS
Insulation 6/23/2021 Order to Comply Issued ROBERT DAVIS
Deputy Wood Construction 6/24/2021 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 6/24/2021 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 6/29/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/1/2021 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 7/7/2021 Order to Comply Issued ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/9/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/12/2021 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/14/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/15/2021 Partial Approval ROBERT DAVIS
Insulation 7/21/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 7/21/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/21/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 7/22/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/30/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/6/2021 Approved CAMERON CHABAN
Light Gage Steel Frame 8/12/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/19/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/25/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/26/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/27/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/30/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/31/2021 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/1/2021 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 9/15/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/15/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/17/2021 No Access for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 9/20/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/22/2021 Partial Approval ROBERT DAVIS
Special/Order Compliance 9/28/2021 Partial Inspection DANIEL VARNUM
T-Bar Ceiling 10/18/2021 Partial Approval ROBERT DAVIS
T-Bar Ceiling 11/12/2021 Partial Approval ROBERT DAVIS
Special/Order Compliance 12/7/2021 Partial Inspection ROBERT DAVIS
Special/Order Compliance 12/9/2021 Partial Inspection JOHN KITCKO
T-Bar Ceiling 1/12/2022 Partial Inspection ROBERT DAVIS
Special/Order Compliance 1/19/2022 Partial Inspection ROBERT DAVIS
T-Bar Ceiling 1/19/2022 Not Ready for Inspection ROBERT DAVIS
Special/Order Compliance 1/20/2022 Partial Approval ROBERT DAVIS
Special/Order Compliance 2/8/2022 Partial Inspection ROBERT DAVIS
Special/Order Compliance 2/11/2022 Partial Inspection ROBERT DAVIS
Special/Order Compliance 2/15/2022 Partial Inspection ROBERT DAVIS
Grading Pre-Inspection 3/3/2022 Partial Approval ROBERT DAVIS
Special/Order Compliance 3/3/2022 Partial Approval ROBERT DAVIS
Special/Order Compliance 3/8/2022 Approved ROBERT DAVIS
Special/Order Compliance 3/14/2022 Partial Inspection ROBERT DAVIS
Special/Order Compliance 3/16/2022 Approved ROBERT DAVIS
Green Building Final 3/30/2022 Approved ROBERT DAVIS
Special/Order Compliance 3/31/2022 Partial Inspection ROBERT DAVIS
Special/Order Compliance 5/13/2022 Partial Inspection ROBERT DAVIS
Special/Order Compliance 5/24/2022 Approved ROBERT DAVIS
Drywall Nailing 8/23/2022 Approved ROBERT DAVIS
Final 8/23/2022 OK to Issue CofO ROBERT DAVIS
Reinforced Concrete Frame 8/23/2022 Approved ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 8/23/2022 SGSOV Approved ROBERT DAVIS
Smoke Detectors 8/23/2022 Approved ROBERT DAVIS
Structural Steel Frame 8/23/2022 Approved ROBERT DAVIS
Verify Sprinkler Sign Off 8/23/2022 Approved ROBERT DAVIS