1717 N WILCOX AVE 90028

Certificate Information: 1717 N WILCOX AVE 90028

Application / Permit
18010-10000-04060
Plan Check / Job No.
B18LA17352
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
7-STORY, 132 ROOM HOTEL WITH GROUND FLOOR RESTAURANT ABOVE 2-LEVELS OF UNDERGROUND PARKING WITH DECK AND RESTAURANT ON 7TH FLOOR PER CPC-2016-2263-VZC-HD-ZAA-CUB-SPR-WDI-1A
Permit Issued
Issued on 1/14/2020
Issuing Office
South Los Angeles
Current Status
CofO Issued on 11/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/17/2018 APPLICANT
Disabled Access Plans Picked Up 9/17/2018 APPLICANT
Green Plans Picked Up 9/17/2018 APPLICANT
Assigned to Plan Check Engineer 9/20/2018 TEODORO DIAZ RODRIGUEZ
Corrections Issued 10/18/2018 TEODORO DIAZ RODRIGUEZ
Quality Review Completed 10/25/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 10/25/2018 APPLICANT
Applicant returned to address corrections 11/8/2018 TEODORO DIAZ RODRIGUEZ
Applicant returned to address corrections 1/9/2019 TEODORO DIAZ RODRIGUEZ
Applicant returned to address corrections 1/22/2019 TEODORO DIAZ RODRIGUEZ
Applicant returned to address corrections 2/19/2019 TEODORO DIAZ RODRIGUEZ
Plan Check Approved 12/12/2019 TEODORO DIAZ RODRIGUEZ
Issued 1/14/2020 LADBS
TCO Issued (Expire Date: 08-30-2025) 3/3/2025 ERNESTO CORRAL
TCO Issued (Expire Date: 02-22-2026) 8/26/2025 ERNESTO CORRAL
Permit Finaled 11/4/2025 ERNESTO CORRAL
CofO Issued 11/4/2025 ERNESTO CORRAL
Permit Finaled 11/4/2025 ERNESTO CORRAL

Permit Application Clearance Information

Driveway location Cleared 10/22/2018 JOHNATHAN YU
Hist. Property Cntrct Mgr Appr Cleared 11/20/2018 LAMBERT GIESSINGER
Historic monument Cleared 11/20/2018 LAMBERT GIESSINGER
Food Service Establishment Cleared 11/28/2018 PAWAN VERMA
Historical monument Cleared 11/30/2018 JIM URQUHART
Project located in CRA area Cleared 11/30/2018 JIM URQUHART
DAS Clearance Cleared 12/3/2018 WAI LAU
Green Code Cleared 12/18/2018 DONALD CRICHLOW
Hydrant and Access approval Cleared 1/22/2019 GEORGE SUCHAND
Encroachment in public way Cleared 2/15/2019 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 2/15/2019 ELENA LOPEZ
Permit Cleared 2/15/2019 JEANETTE VONG
Food establishment approval Cleared 2/19/2019 LACDHS APPROVED
Fire Marshall Fire Life Safety Cleared 5/23/2019 OSCAR SALGADO JR
Highway dedication Cleared 6/26/2019 ERIK BEASLEY
Trees in Parkway Cleared 7/3/2019 JOHN KIM
Building over 3-story or 36-ft Cleared 7/17/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/17/2019 CALOSHA APPROVED
GPI Written Notices Cleared 7/17/2019 TEODORO DIAZ RODRIGUEZ
Grading Pre-Inspection Cleared 7/17/2019 TEODORO DIAZ RODRIGUEZ
Work Adjacent to Public Way Cleared 7/25/2019 BOK GOH
Sewer availability Cleared 8/19/2019 ADRIAN SANCHEZ
Low Impact Development Cleared 11/4/2019 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 11/5/2019 VICTOR MENDOZA
"D" conditions Cleared 11/20/2019 SOPHIE GABEL-SCHEINBAU
"Q" conditions Cleared 11/20/2019 SOPHIE GABEL-SCHEINBAU
"T" removal Cleared 11/20/2019 SOPHIE GABEL-SCHEINBAU
CPC Cleared 11/20/2019 SOPHIE GABEL-SCHEINBAU
Site Plan review Cleared 11/20/2019 SOPHIE GABEL-SCHEINBAU
Haul Route Cleared 12/12/2019 TEODORO DIAZ RODRIGUEZ

Contact Information

Architect Kapeller, Christoph; Lic. No.: C29371 902 S CURSON AVENUE      LOS ANGELES, CA 90036
Contractor Owner-Builder       ,
Engineer Ghodsi, Afshin; Lic. No.: S3248 3621 HARBOR BL 125      SANTA ANA, CA 92704

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Other (see comments) 2/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/12/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/14/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/27/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/27/2020 Partial Approval DANIEL MC AULIFFE
Grading Pre-Inspection 8/25/2020 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 8/25/2020 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/8/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/9/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/11/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/17/2020 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/17/2020 Partial Approval DANIEL MC AULIFFE
Green Building Rough 10/2/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/2/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/2/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/5/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 10/5/2020 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/6/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 10/14/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 10/14/2020 Approved DAVID BURKHEAD
Reinforced Concrete Frame 10/14/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/14/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/21/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/2/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 11/4/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/4/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/4/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 11/5/2020 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 11/6/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/6/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/6/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 11/9/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/10/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/10/2020 Partial Approval DAVID BURKHEAD
Green Building Rough 11/17/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/17/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/17/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 11/23/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/23/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/23/2020 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/25/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/30/2020 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 12/2/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/2/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/2/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/3/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/18/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/18/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/18/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/18/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/22/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/22/2020 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/22/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/23/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/24/2020 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/30/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/30/2020 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/30/2020 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/31/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/31/2020 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 1/5/2021 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 1/8/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/8/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/8/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 1/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/29/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/29/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/2/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/3/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/5/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/11/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/16/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/19/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 2/26/2021 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 2/26/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/4/2021 Approved DAVID BURKHEAD
Reinforced Masonry Frame 3/4/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 3/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/7/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/7/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/14/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/14/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/15/2021 Conditional Approval DAVID BURKHEAD
Green Building Rough 4/15/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/15/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/15/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 4/16/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/19/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 4/22/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/13/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 5/14/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 6/1/2021 Conditional Approval DAVID BURKHEAD
Green Building Rough 6/1/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/1/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/1/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 6/2/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/2/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 6/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/9/2021 Conditional Approval DAVID BURKHEAD
Structural Steel Frame 6/9/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 6/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/11/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/18/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/28/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/29/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/29/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/7/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/13/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/13/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/14/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/14/2021 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/14/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/14/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/14/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/15/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/20/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/21/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/21/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/27/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 7/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/4/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/4/2021 Approved DAVID BURKHEAD
Deputy Steel/Welding 8/4/2021 Approved DAVID BURKHEAD
Footing/Foundation/Slab 8/4/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/10/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/11/2021 Partial Approval DAVID BURKHEAD
Deputy Fireproofing 8/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/16/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/17/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/18/2021 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 8/20/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 8/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/25/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/26/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 8/30/2021 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 8/30/2021 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 8/31/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/1/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/1/2021 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/7/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 9/8/2021 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 9/8/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 9/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/10/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 9/13/2021 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/20/2021 Partial Inspection DAVID BURKHEAD
Reinforced Masonry Frame 9/20/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/22/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/24/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/27/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 9/27/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 9/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/5/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/6/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/6/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/6/2021 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/6/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 10/7/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/7/2021 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 10/7/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/8/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/8/2021 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/14/2021 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 10/15/2021 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 10/15/2021 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 10/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/28/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/3/2021 Approved DAVID BURKHEAD
Deputy Reinf. Masonry 11/3/2021 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 11/3/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/4/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/4/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 11/5/2021 Approved DAVID BURKHEAD
Footing/Foundation/Slab 11/5/2021 Approved DAVID BURKHEAD
Reinforced Masonry Frame 11/5/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 11/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/9/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/12/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/12/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/12/2021 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 11/15/2021 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 11/15/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 11/16/2021 Approved DAVID BURKHEAD
Deputy Steel/Welding 11/16/2021 Approved DAVID BURKHEAD
Deputy Reinf. Masonry 11/17/2021 Approved DAVID BURKHEAD
Deputy Steel/Welding 11/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/19/2021 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 11/22/2021 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 11/22/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 11/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 12/3/2021 Approved DAVID BURKHEAD
Deputy Drilled-In Anchors 12/6/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/6/2021 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 12/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/10/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/13/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/14/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 12/15/2021 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 12/16/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/28/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 1/3/2022 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 1/5/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/6/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/12/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/13/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 1/18/2022 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/20/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/25/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/28/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/31/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/1/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/2/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/3/2022 Conditional Approval DAVID BURKHEAD
Pre-Inspection 2/3/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 2/4/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/4/2022 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/23/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 3/23/2022 Conditional Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 4/4/2022 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 4/5/2022 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/7/2022 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/11/2022 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 4/12/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/13/2022 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 5/4/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/5/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/6/2022 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/13/2022 Partial Inspection DAVID BURKHEAD
Drywall Nailing 5/26/2022 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/26/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/28/2022 Conditional Approval ERNESTO CORRAL
Interior/Exterior Lathing 8/23/2022 Not Ready for Inspection TED RIES
Light Gage Steel Frame 8/23/2022 Partial Approval TED RIES
Interior/Exterior Lathing 8/24/2022 Not Ready for Inspection TED RIES
Pre-Inspection 8/24/2022 Not Ready for Inspection TED RIES
Pre-Inspection 9/22/2022 Approved DAVID BURKHEAD
Drywall Nailing 10/11/2022 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 10/19/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 10/26/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/28/2022 Conditional Approval MICHAEL ROSENBERG
Interior/Exterior Lathing 11/1/2022 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 1/18/2023 Partial Inspection DAVID BURKHEAD
Drywall Nailing 2/8/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/8/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/3/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 3/8/2023 Partial Approval DAVID BURKHEAD
Special/Order Compliance 3/10/2023 Approved DAVID BURKHEAD
Insulation 3/31/2023 Partial Approval DAVID BURKHEAD
Insulation 4/4/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/10/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/17/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 4/24/2023 Partial Approval EDWIN GREGORYONA
Insulation 4/27/2023 Not Ready for Inspection DAVID BURKHEAD
Insulation 5/1/2023 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 5/4/2023 Partial Approval GREGORY POMISH
Drywall Nailing 5/15/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/16/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/17/2023 Partial Approval JULIAN CAPUCETTI
Drywall Nailing 5/19/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 5/23/2023 Partial Approval GREGORY POMISH
Light Gage Steel Frame 6/2/2023 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 6/7/2023 Partial Approval GREGORY POMISH
Insulation 6/8/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/22/2023 Partial Approval ALFREDO LOPEZ
Insulation 6/22/2023 Partial Approval ALFREDO LOPEZ
Insulation 6/26/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/29/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 7/5/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/11/2023 Partial Approval DAVID BURKHEAD
Insulation 7/19/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/20/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/27/2023 Partial Approval EDWIN GREGORYONA
Insulation 7/27/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/3/2023 Partial Approval GREGORY POMISH
Drywall Nailing 8/18/2023 Not Ready for Inspection GREGORY POMISH
Insulation 8/28/2023 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 8/28/2023 Partial Approval MARTIN TAVITIAN
Special/Order Compliance 8/30/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/31/2023 Partial Inspection EDWIN GREGORYONA
Insulation 9/11/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/11/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/20/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/22/2023 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/25/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 9/28/2023 Partial Approval GREGORY POMISH
Drywall Nailing 10/6/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/11/2023 Conditional Approval RAFAEL ESPINOZA
Insulation 10/12/2023 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 10/17/2023 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 10/17/2023 Approved DAVID BURKHEAD
Drywall Nailing 10/19/2023 Partial Approval JACOB MYERS
Insulation 11/2/2023 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/6/2023 Partial Approval GREGORY POMISH
Drywall Nailing 11/13/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/17/2023 Partial Approval GREGORY POMISH
Drywall Nailing 11/27/2023 Partial Approval GREGORY POMISH
Drywall Nailing 12/5/2023 Partial Approval DAVID BURKHEAD
Insulation 12/12/2023 Partial Approval GREGORY POMISH
Drywall Nailing 1/3/2024 Partial Approval GREGORY POMISH
Drywall Nailing 1/9/2024 Partial Approval GREGORY POMISH
Wood Frame 1/11/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/17/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/31/2024 Partial Approval GREGORY POMISH
Drywall Nailing 2/9/2024 Partial Approval GREGORY POMISH
Drywall Nailing 2/21/2024 Partial Approval GREGORY POMISH
Drywall Nailing 3/14/2024 Not Ready for Inspection DAVID BURKHEAD
T-Bar Ceiling 4/3/2024 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 6/13/2024 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 10/10/2024 Partial Inspection DAVID BURKHEAD
Final 12/10/2024 Partial Inspection DAVID BURKHEAD
Green Building Final 12/10/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 12/10/2024 Approved DAVID BURKHEAD
Reinforced Concrete Frame 12/10/2024 Conditional Approval DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 12/10/2024 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 12/10/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/10/2024 Partial Inspection DAVID BURKHEAD
Final 12/30/2024 Partial Inspection EDWIN GREGORYONA
Green Building Final 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Smoke Detectors 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Final 1/27/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 1/27/2025 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/27/2025 Partial Approval DAVID BURKHEAD
Smoke Detectors 1/27/2025 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 1/27/2025 Partial Inspection DAVID BURKHEAD
Final 2/14/2025 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 2/14/2025 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 2/14/2025 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/14/2025 Not Ready for Inspection DAVID BURKHEAD
Final 2/24/2025 Partial Inspection DAVID BURKHEAD
Green Building Final 2/24/2025 Approved DAVID BURKHEAD
Reinforced Concrete Frame 2/24/2025 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 2/24/2025 Approved DAVID BURKHEAD
Final 3/3/2025 OK for TCO DAVID BURKHEAD
Special/Order Compliance 8/5/2025 Approved DAVID BURKHEAD
Final 10/29/2025 Partial Inspection DAVID BURKHEAD