20247 W SATICOY ST 91306

Certificate Information: 20247 W SATICOY ST 91306

Application / Permit
18010-10000-04012
Plan Check / Job No.
B18LA17010
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 4-story, 43-unit, Apartment building with 4 units set aside for Low Income, with Roof Deck, over 1evel of subterranean parking garage
Permit Issued
Issued on 10/21/2021
Issuing Office
Metro
Current Status
CofO Issued on 6/16/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/14/2018 APPLICANT
Assigned to Plan Check Engineer 10/5/2018 HERNAN ARREOLA
Corrections Issued 10/11/2018 HERNAN ARREOLA
Building Plans Picked Up 10/30/2018 APPLICANT
Quality Review Completed 11/7/2018 BILL STUTSMAN
Applicant returned to address corrections 8/2/2019 HERNAN ARREOLA
Applicant returned to address corrections 10/27/2020 HERNAN ARREOLA
Applicant returned to address corrections 1/7/2021 HERNAN ARREOLA
Applicant returned to address corrections 1/15/2021 HERNAN ARREOLA
Plan Check Approved 9/3/2021 HERNAN ARREOLA
Issued 10/21/2021 APPLICANT
TCO Issued (Expire Date: 09-29-2025) 4/2/2025 RICKEY JACKSON
Permit Finaled 6/16/2025 JEFFREY DURAN
CofO Issued 6/16/2025 JEFFREY DURAN
Permit Finaled 6/16/2025 JEFFREY DURAN

Permit Application Clearance Information

Address approval Cleared 10/4/2019 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 10/4/2019 JOSHUA DIAZ
Sewer availability Cleared 10/4/2019 GUILLERMO PETRA
ZA Case Cleared 10/4/2019 HERMINIGILDO AGUSTIN
ZA Case Cleared 10/4/2019 HERMINIGILDO AGUSTIN
Green Code Cleared 2/10/2020 HERNAN ARREOLA
Building over 3-story or 36-ft Cleared 8/10/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/10/2020 CALOSHA APPROVED
Bicycle Parking Cleared 8/19/2020 BRANDON WILSON
Driveway location Cleared 8/19/2020 BRANDON WILSON
Highway dedication Cleared 9/8/2020 LEE GUILBEAUX
Hydrant and Access approval Cleared 9/9/2020 MATTHEW CRAIG
Trees in Parkway Cleared 10/27/2020 JOHN KIM
Bicycle Parking Cleared 1/15/2021 LEE GUILBEAUX
Low Impact Development Cleared 2/15/2021 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 2/24/2021 GABRIEL ROBLES
Density Bonus 12.22.A.25 Cleared 4/6/2021 LOUIE MILLER
Fire Marshall Fire Life Safety Cleared 6/21/2021 WILLIAM JOHNS
CPC Cleared 7/21/2021 DANG NGUYEN
Work Adjacent to Public Way Cleared 8/23/2021 LEE GUILBEAUX

Contact Information

Architect Vanos,, Vincent Jay; Lic. No.: C22269 2747 MARQUETTE DR      TOPANGA, CA 90290
Contractor New House Construction Inc; Lic. No.: 953835-B 16060 VENTURA BLVD STE 110      ENCINO, CA 91436
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065
Engineer Wavering,, Derek Evan; Lic. No.: S6239 1371 COLE LANE      UPLAND, CA 91784
Engineer White,, William Michael; Lic. No.: C62111 19619 MATHILDE LN      SAUGUS, CA 91350

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/22/2021 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 11/10/2021 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/15/2022 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 6/15/2022 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 6/24/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 6/27/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 6/27/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 6/27/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 6/28/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 6/28/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 6/30/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 6/30/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 6/30/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 7/1/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 7/5/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 7/5/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/5/2022 Conditional Approval JEFFREY FULTON
Green Building Rough 7/5/2022 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 7/5/2022 Partial Inspection JEFFREY FULTON
Reinforced Masonry Frame 7/5/2022 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 7/5/2022 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 7/6/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/6/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/7/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 7/8/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/8/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 7/11/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/11/2022 Conditional Approval JEFFREY FULTON
Green Building Rough 7/11/2022 Not Ready for Inspection JEFFREY FULTON
Masonry Wall/Backfill 7/11/2022 Not Ready for Inspection JEFFREY FULTON
Reinforced Masonry Frame 7/11/2022 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 7/11/2022 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Masonry 7/12/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/12/2022 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 7/12/2022 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 7/13/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/13/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 7/14/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/14/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 7/15/2022 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 7/15/2022 Conditional Approval JEFFREY FULTON
Green Building Rough 7/21/2022 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 7/21/2022 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 7/21/2022 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 8/10/2022 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 10/3/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 10/5/2022 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 10/5/2022 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 10/5/2022 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 10/6/2022 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/6/2022 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 11/1/2022 Conditional Approval JEFFREY FULTON
Masonry Wall/Backfill 12/15/2022 Partial Inspection JEFFREY FULTON
Wood Frame 12/15/2022 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 1/19/2023 Partial Inspection JEFFREY FULTON
Wood Frame 1/19/2023 Partial Inspection JEFFREY FULTON
Wood Frame 1/23/2023 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 2/2/2023 Conditional Approval JEFFREY FULTON
Wood Frame 2/10/2023 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 2/17/2023 Conditional Approval JEFFREY FULTON
Deputy Wood Construction 3/6/2023 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/6/2023 Partial Inspection JEFFREY FULTON
Special/Order Compliance 3/6/2023 Partial Inspection STEVEN LEVITT
Wood Frame 3/6/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/7/2023 Partial Inspection JEFFREY FULTON
Special/Order Compliance 3/7/2023 Partial Approval STEVEN LEVITT
Footing/Foundation/Slab 3/24/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 3/29/2023 Partial Inspection JEFFREY FULTON
Insulation 4/13/2023 Partial Inspection JEFFREY FULTON
Deputy Wood Construction 4/19/2023 Conditional Approval JEFFREY FULTON
Drywall Nailing 4/20/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 4/20/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/3/2023 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 5/10/2023 Partial Inspection JEFFREY FULTON
Insulation 5/16/2023 Not Ready for Inspection JEFFREY FULTON
Wood Frame 5/17/2023 Partial Inspection JEFFREY FULTON
Insulation 5/19/2023 Partial Inspection JEFFREY FULTON
Insulation 5/31/2023 Partial Inspection JEFFREY FULTON
Wood Frame 5/31/2023 Partial Inspection JEFFREY FULTON
Wood Frame 6/7/2023 Partial Inspection JEFFREY FULTON
Deputy Wood Construction 6/13/2023 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/13/2023 Partial Inspection JEFFREY FULTON
Wood Frame 6/13/2023 Partial Inspection JEFFREY FULTON
Insulation 6/21/2023 Partial Inspection JEFFREY FULTON
Wood Frame 6/21/2023 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 6/27/2023 Partial Inspection JEFFREY FULTON
Insulation 6/27/2023 Partial Inspection JEFFREY FULTON
Wood Frame 6/27/2023 Partial Inspection JEFFREY FULTON
Insulation 7/3/2023 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/12/2023 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/22/2023 Partial Approval GREGORY POMISH
Wood Frame 9/26/2023 Partial Inspection JEFFREY FULTON
Wood Frame 9/27/2023 Partial Inspection JEFFREY FULTON
Insulation 9/28/2023 Not Ready for Inspection JEFFREY FULTON
Insulation 10/6/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/11/2023 Partial Inspection JEFFREY FULTON
Insulation 10/11/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/16/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/20/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/23/2023 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 10/23/2023 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/1/2023 Partial Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 11/2/2023 Conditional Approval JEFFREY FULTON
Interior/Exterior Lathing 11/14/2023 Partial Inspection JEFFREY FULTON
Deputy Fireproofing 2/14/2024 Conditional Approval JEFFREY FULTON
Deputy Fireproofing 2/15/2024 Conditional Approval JEFFREY FULTON
Masonry Wall/Backfill 2/20/2024 Partial Inspection JEFFREY FULTON
Deputy Fireproofing 3/18/2024 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 3/18/2024 Partial Approval GREGORY POMISH
Green Building Final 4/9/2024 Partial Inspection GREGORY POMISH
Final 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Footing/Foundation/Slab 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Green Building Final 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Green Building Rough 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Reinforced Masonry Frame 10/16/2024 Not Ready for Inspection JEFFREY DURAN
SGSOV-Seismic Gas S/O Valve 10/16/2024 SGSOV Not Ready JEFFREY DURAN
Smoke Detectors 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Verify Sprinkler Sign Off 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Final 10/17/2024 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 10/17/2024 Approved GREGORY POMISH
Green Building Final 10/17/2024 Partial Inspection GREGORY POMISH
Green Building Rough 10/17/2024 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 10/17/2024 Approved GREGORY POMISH
Reinforced Masonry Frame 10/17/2024 Partial Approval GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 10/17/2024 SGSOV Not Ready GREGORY POMISH
Smoke Detectors 10/17/2024 Approved GREGORY POMISH
Verify Sprinkler Sign Off 10/17/2024 Approved GREGORY POMISH
Final 1/14/2025 Partial Approval GREGORY POMISH
Green Building Final 1/14/2025 Approved GREGORY POMISH
Green Building Rough 1/14/2025 Approved GREGORY POMISH
Reinforced Concrete Frame 1/14/2025 Approved GREGORY POMISH
Reinforced Masonry Frame 1/14/2025 Approved GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 1/14/2025 SGSOV Approved GREGORY POMISH