13570 W FOOTHILL BLVD 91342

Certificate Information: 13570 W FOOTHILL BLVD 91342

Application / Permit
18010-10000-03808
Plan Check / Job No.
B18LA15924
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 3-story, Type VA, 21-affordable units apartment house with 1-level of above grade parking, (4 low/17 moderate income units, and with 19 of those as apartment house /residential hotel, see comment), parking reduction option 2 per 12.22A25 and Residential Hotel ordinance.
Permit Issued
Issued on 3/11/2019
Issuing Office
Metro
Current Status
CofO Issued on 7/8/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/10/2018 APPLICANT
Assigned to Plan Check Engineer 9/6/2018 LARRY LEE
Corrections Issued 9/11/2018 LARRY LEE
Quality Review Completed 9/14/2018 CHARLES CHANG
Building Plans Picked Up 9/19/2018 APPLICANT
Applicant returned to address corrections 10/11/2018 LARRY LEE
Plan Check Approved 2/27/2019 LARRY LEE
Issued 3/11/2019 LADBS
TCO Issued (Expire Date: 09-22-2021) 3/26/2021 JEFFREY DURAN
CofO in Progress 7/7/2021 DANNY RODRIGUEZ
Permit Finaled 7/8/2021 RICKEY JACKSON
CofO Issued 7/8/2021 RICKEY JACKSON
Permit Finaled 7/8/2021 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 10/3/2018 LEE GUILBEAUX
Marquee approval - CUL Cleared 10/17/2018 HAROOT AVANESIAN
Trees in Parkway Cleared 10/22/2018 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 10/29/2018 RUDY TERRIQUEZ.
Sewer availability Cleared 10/29/2018 RUDY TERRIQUEZ.
Frnt yard landscape/Water mgmt Cleared 10/30/2018 IVORY CHAMBESHI
Opn space landscape/Water mgmt Cleared 10/30/2018 IVORY CHAMBESHI
Hydrant and Access approval Cleared 11/5/2018 JOHN DALLAS
Miscellaneous Cleared 11/9/2018 MARKOS PEREZ-BRAN
Green Code Cleared 11/28/2018 LARRY LEE
DAS Clearance Cleared 12/4/2018 LARRY LEE
Fire Marshall Fire Life Safety Cleared 12/5/2018 WILLIAM JOHNS
City owned building/parcel Cleared 1/10/2019 HAROOT AVANESIAN
Highway dedication Cleared 1/14/2019 LEE GUILBEAUX
Low Impact Development Cleared 1/14/2019 AMMAR ELTAWIL
Permit Cleared 1/14/2019 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 1/14/2019 LEE GUILBEAUX
Density Bonus 12.22.A.25 Cleared 2/25/2019 MICHAEL ZIRBES

Contact Information

Contractor G B Construction Inc; Lic. No.: 424458-B 1531 W REDONDO BEACH BLVD      GARDENA, CA 90247

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/23/2019 Partial Approval RICKEY JACKSON
Deputy Reinf. Masonry 5/28/2019 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 5/28/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/29/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/30/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/3/2019 Conditional Approval JAMES STEPHENS
Reinforced Concrete Frame 6/4/2019 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/10/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/12/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/18/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/22/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/26/2019 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/29/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 7/30/2019 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 7/30/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 7/31/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 8/1/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 8/5/2019 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 8/6/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/7/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/7/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/8/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/8/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/9/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/9/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/12/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/13/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/14/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/15/2019 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 8/15/2019 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 8/15/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/16/2019 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/19/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/19/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/20/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 8/20/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 8/21/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/21/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/22/2019 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/22/2019 Approved JOHN KITCKO
Masonry Wall/Backfill 8/22/2019 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 8/23/2019 Approved JOHN KITCKO
Deputy Reinf. Masonry 8/23/2019 Approved JOHN KITCKO
Reinforced Masonry Frame 8/23/2019 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Masonry 8/26/2019 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 8/26/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/27/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/26/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/27/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/30/2019 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/3/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/4/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/7/2019 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/8/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/9/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/10/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/11/2019 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 10/15/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/15/2019 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/16/2019 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/16/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/17/2019 Partial Approval DANNY RODRIGUEZ
Reinforced Concrete Frame 10/17/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/18/2019 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/22/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/30/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/31/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/4/2019 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 11/12/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/12/2019 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 11/13/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/15/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/15/2019 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/15/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/19/2019 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 11/20/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/22/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/16/2019 Partial Approval DANNY RODRIGUEZ
Wall Anchors 12/16/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 12/20/2019 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 12/20/2019 Partial Approval DANNY RODRIGUEZ
Green Building Rough 12/20/2019 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/20/2019 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 12/20/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 12/30/2019 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 12/30/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 12/31/2019 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 12/31/2019 Not Ready for Inspection JOHN KITCKO
Green Building Rough 12/31/2019 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/31/2019 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/31/2019 Partial Approval JOHN KITCKO
Drywall Nailing 1/2/2020 Partial Approval JOHN KITCKO
Drywall Nailing 1/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/13/2020 Partial Approval DANNY RODRIGUEZ
Insulation 1/13/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 1/14/2020 Partial Approval DANNY RODRIGUEZ
Wood Frame 1/16/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 1/17/2020 Not Ready for Inspection ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 1/17/2020 Not Ready for Inspection ANDREW DORSO
Drywall Nailing 1/22/2020 Not Ready for Inspection JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 1/22/2020 Partial Inspection JAMES STEPHENS
Insulation 1/22/2020 Partial Approval JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 1/24/2020 Partial Inspection JAMES STEPHENS
Insulation 1/24/2020 Partial Inspection JAMES STEPHENS
Deputy Drilled-In Anchors 1/27/2020 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/27/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 1/27/2020 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/28/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 1/29/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/29/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 1/29/2020 Partial Approval DANNY RODRIGUEZ
Insulation 1/30/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 1/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 2/4/2020 Partial Approval DANNY RODRIGUEZ
Green Building Rough 2/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/4/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 2/4/2020 Partial Approval DANNY RODRIGUEZ
Insulation 2/5/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/6/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/6/2020 Partial Approval DANNY RODRIGUEZ
Insulation 2/6/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 2/7/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/7/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 2/7/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 2/10/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/13/2020 Partial Approval DANNY RODRIGUEZ
Insulation 2/13/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/18/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/19/2020 Not Ready for Inspection JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Not Ready for Inspection JAMES STEPHENS
Insulation 2/19/2020 Partial Approval JAMES STEPHENS
Insulation 2/20/2020 Partial Approval DANNY RODRIGUEZ
Insulation 2/21/2020 Partial Approval DANNY RODRIGUEZ
Wood Frame 2/21/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/24/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/24/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 2/24/2020 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/24/2020 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 2/26/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/26/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 2/26/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 2/26/2020 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/26/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 2/26/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/2/2020 Partial Approval JAMES STEPHENS
Insulation 3/2/2020 Partial Approval JAMES STEPHENS
Floor/Roof Diaphrgm/Shear Wall 3/3/2020 Partial Inspection DANNY RODRIGUEZ
Insulation 3/3/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 3/4/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/5/2020 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 3/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 3/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/9/2020 Partial Approval DANNY RODRIGUEZ
Insulation 3/9/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 3/9/2020 Partial Approval DANNY RODRIGUEZ
T-Bar Ceiling 3/9/2020 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 3/9/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 3/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/11/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/11/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/11/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/12/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/12/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/12/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/17/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 3/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/18/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/18/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/20/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/20/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 3/20/2020 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 3/20/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/23/2020 Partial Approval DANNY RODRIGUEZ
Green Building Rough 3/23/2020 Approved DANNY RODRIGUEZ
Insulation 3/23/2020 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 3/23/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 3/23/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/24/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/24/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 3/24/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 3/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/26/2020 Partial Inspection ANDREW DORSO
Insulation 3/26/2020 Partial Inspection ANDREW DORSO
Drywall Nailing 3/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 3/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 3/31/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 4/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 4/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 4/1/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/2/2020 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 4/2/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 4/2/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 4/2/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 4/3/2020 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 4/3/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/3/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/6/2020 Partial Approval DANNY RODRIGUEZ
Insulation 4/6/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/7/2020 Partial Approval DANNY RODRIGUEZ
Insulation 4/7/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 4/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 4/9/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/9/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 4/10/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 4/15/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/17/2020 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 4/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 4/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/24/2020 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 4/24/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 4/28/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 4/28/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 4/28/2020 Partial Approval DANNY RODRIGUEZ
T-Bar Ceiling 4/28/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 4/29/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 4/29/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 4/30/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 4/30/2020 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 5/1/2020 Conditional Approval JEFFREY DURAN
Interior/Exterior Lathing 5/6/2020 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 5/6/2020 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 5/8/2020 Partial Approval DANNY RODRIGUEZ
Wood Frame 5/8/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/11/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 5/11/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/12/2020 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 5/20/2020 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 5/20/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 5/21/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 5/22/2020 Approved DANNY RODRIGUEZ
Interior/Exterior Lathing 5/22/2020 Approved DANNY RODRIGUEZ
Drywall Nailing 6/4/2020 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/23/2020 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/24/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/26/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 7/7/2020 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/29/2020 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/5/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/12/2020 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 8/14/2020 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 8/14/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Other (see comments) 8/20/2020 Conditional Approval SORIN CIRSTOIU
Reinforced Masonry Frame 8/20/2020 Partial Approval SORIN CIRSTOIU
Footing/Foundation/Slab 8/21/2020 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/26/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/10/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/14/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/16/2020 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 9/16/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/24/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/30/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 10/7/2020 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 10/21/2020 Partial Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 10/29/2020 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 11/5/2020 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/12/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/17/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/18/2020 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 12/17/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 12/17/2020 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/17/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 12/17/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 1/26/2021 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 1/26/2021 Partial Inspection DANNY RODRIGUEZ
Wood Frame 1/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/4/2021 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 3/4/2021 Approved DANNY RODRIGUEZ
Green Building Final 3/4/2021 Approved DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 3/4/2021 SGSOV Approved DANNY RODRIGUEZ
Smoke Detectors 3/4/2021 Approved DANNY RODRIGUEZ
Verify Sprinkler Sign Off 3/4/2021 Partial Inspection DANNY RODRIGUEZ
Wood Frame 3/4/2021 Partial Inspection DANNY RODRIGUEZ
Verify Rec and Parks Fee Memo 3/8/2021 Not Ready for Inspection JOHN KITCKO
Final 6/28/2021 Not Ready for Inspection JOE VELASQUEZ
Verify Sprinkler Sign Off 6/28/2021 Not Ready for Inspection JOE VELASQUEZ
Wood Frame 6/28/2021 Not Ready for Inspection JOE VELASQUEZ
Final 6/30/2021 OK to Issue CofO DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/7/2021 Approved DANNY RODRIGUEZ
Wood Frame 7/7/2021 Approved DANNY RODRIGUEZ