3405 N SIERRA ST 90031

Certificate Information: 3405 N SIERRA ST 90031

Application / Permit
18010-10000-03667
Plan Check / Job No.
B18LA14896
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SINGLE FAMILY DWELLING OVER BASEMENT WITH ATTACHED 2 CAR GARAGE **1 OF 4**
Permit Issued
Issued on 6/1/2022
Issuing Office
Metro
Current Status
Issued on 6/1/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/20/2018 APPLICANT
Green Plans Picked Up 8/8/2018 APPLICANT
Assigned to Plan Check Engineer 8/23/2018 ZAW HAN
Corrections Issued 9/6/2018 ZAW HAN
Quality Review Completed 9/14/2018 HERNAN ARREOLA
Building Plans Picked Up 9/19/2018 APPLICANT
Applicant returned to address corrections 10/24/2018 ZAW HAN
Applicant returned to address corrections 3/22/2019 ZAW HAN
Applicant returned to address corrections 12/24/2019 ZAW HAN
Applicant returned to address corrections 10/8/2020 ZAW HAN
Plan Check Approved 2/18/2022 ZAW HAN
Issued 6/1/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 3/29/2019 ELAINE LEI
BHO/Hillside ordinance Cleared 3/29/2019 ELAINE LEI
BHO/Hillside ordinance Cleared 3/29/2019 ELAINE LEI
BHO/Hillside ordinance Cleared 3/29/2019 ELAINE LEI
Permit Cleared 3/29/2019 ELAINE LEI
"D" conditions Cleared 12/16/2019 SOPHIE GABEL-SCHEINBAU
"Q" conditions Cleared 12/16/2019 SOPHIE GABEL-SCHEINBAU
CPC Cleared 12/16/2019 SOPHIE GABEL-SCHEINBAU
Frnt yard landscape/Water mgmt Cleared 12/16/2019 SOPHIE GABEL-SCHEINBAU
ZI Cleared 12/16/2019 SOPHIE GABEL-SCHEINBAU
Green Code Cleared 2/4/2020 COLIN LOREDO
Trees in Parkway Cleared 9/2/2020 JOHN KIM
Low Impact Development Cleared 11/25/2020 JORGE MEJIA LEMUS
Hydrant and Access approval Cleared 8/25/2021 MATTHEW CRAIG
Disturb/Remove Protected Trees Cleared 8/31/2021 STEPHEN DUPREY
Eng Process Fee Ord 176,300 Cleared 9/10/2021 THOMAS LANG
Sewer availability Cleared 9/10/2021 THOMAS LANG
Roof/Waste drainage to street Cleared 9/14/2021 THOMAS LANG
Excavation more than 5-ft deep Cleared 2/18/2022 CALOSHA APPROVED
GPI Written Notices Cleared 2/18/2022 TIMOTHY POWELL
Grading Pre-Inspection Cleared 2/18/2022 TIMOTHY POWELL

Contact Information

Contractor Yu Minghai; Lic. No.: 1024904-B 15531 FACILIDAD ST      HACIENDA HEIGHTS, CA 91745
Engineer Lee, Jack C; Lic. No.: C40870 576 E LAMBERT RD      BREA, CA 92821
Engineer Lee, Jack C; Lic. No.: GE2153 576 E LAMBERT RD      BREA, CA 92821
Engineer Song,, Jiansheng; Lic. No.: C71849 18728 BLOOMFIELD AVENUE      CERRITOS, CA 90703

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 12/2/2022 Corrections Issued OSVALDO PARAMO
Pre-Inspection 12/2/2022 Approved OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 4/27/2023 Not Ready for Inspection OSVALDO PARAMO
Piling/Pier/Caisson 4/27/2023 Corrections Issued OSVALDO PARAMO
Deputy Grading 4/29/2024 Conditional Approval OSVALDO PARAMO
Deputy Grading 4/30/2024 Conditional Approval OSVALDO PARAMO
Piling/Pier/Caisson 5/3/2024 Corrections Issued OSVALDO PARAMO
Piling/Pier/Caisson 5/20/2024 Partial Approval OSVALDO PARAMO
Piling/Pier/Caisson 8/6/2024 Approved OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 11/27/2024 Partial Approval WILLIAM SIERRA
Footing/Foundation/Slab 11/27/2024 Partial Approval WILLIAM SIERRA
Footing/Foundation/Slab 12/11/2024 Corrections Issued OSVALDO PARAMO
Pre-Inspection 12/11/2024 Corrections Issued ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 9/12/2025 Partial Inspection FREDDIE RIVERA
Green Building Rough 9/12/2025 Partial Inspection FREDDIE RIVERA
Reinforced Concrete Frame 9/12/2025 Partial Inspection FREDDIE RIVERA
Verify Sprinkler Sign Off 9/12/2025 Partial Inspection FREDDIE RIVERA
Footing/Foundation/Slab 9/16/2025 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 9/29/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
PLUMBING-Rough 10/3/2025 Partial Approval ALIZAH MAYAGOITIA
Footing/Foundation/Slab 10/9/2025 Partial Approval ALIZAH MAYAGOITIA
Green Building Rough 10/30/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Verify Sprinkler Sign Off 10/30/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Footing/Foundation/Slab 11/3/2025 Partial Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 12/2/2025 Partial Approval ALIZAH MAYAGOITIA
Wood Frame 12/15/2025 Corrections Issued ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 2/6/2026 Corrections Issued ALIZAH MAYAGOITIA
Rough-Elec/Plmb/HVAC 2/6/2026 Approved ALIZAH MAYAGOITIA
Verify Sprinkler Sign Off 2/6/2026 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 2/11/2026 Approved ALIZAH MAYAGOITIA
Insulation 2/13/2026 Approved ALIZAH MAYAGOITIA
Drywall Nailing 3/11/2026 Approved GEM DE OCAMPO
Green Building Rough 3/11/2026 Approved GEM DE OCAMPO
Interior/Exterior Lathing 3/11/2026 Approved GEM DE OCAMPO
Interior/Exterior Lathing 4/22/2026 Partial Approval DAVID WILLIAMS
Shower Pan 4/22/2026 Approved DAVID WILLIAMS