Footing/Foundation/Slab
|
6/27/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/18/2019
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/18/2019
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/25/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/13/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/13/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
8/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/14/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
8/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/20/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/20/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wall Anchors
|
8/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/27/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/28/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/28/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/29/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
8/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/4/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/4/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Masonry Wall/Backfill
|
9/6/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/9/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/10/2019
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
9/10/2019
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
9/10/2019
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
9/10/2019
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
9/16/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/16/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
9/16/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
9/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/25/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/26/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
9/27/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
10/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/10/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/11/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/15/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/16/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/17/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
10/18/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/18/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/24/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
10/25/2019
|
Approved
|
JOEY BUCHANAN
|
|
Insulation
|
10/25/2019
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
10/28/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/7/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
11/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/19/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/21/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
11/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/26/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
11/26/2019
|
Approved
|
JOEY BUCHANAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/26/2019
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
11/27/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
12/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
12/2/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/10/2019
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/10/2019
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
12/13/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
12/17/2019
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/17/2019
|
Approved
|
JOEY BUCHANAN
|
|
Green Building Rough
|
12/17/2019
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
12/17/2019
|
Partial Approval
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
12/17/2019
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Deputy Reinf. Masonry
|
12/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/10/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Masonry Wall/Backfill
|
1/10/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/13/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/13/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
1/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
1/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
1/17/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
1/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/29/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
1/31/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
2/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/5/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
2/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/7/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/11/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
2/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/20/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
2/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
2/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/28/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
3/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/9/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/12/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/18/2020
|
Partial Approval
|
JAMES POWERS
|
|
T-Bar Ceiling
|
3/18/2020
|
Approved
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/19/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/23/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/25/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
3/25/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/26/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/26/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/27/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
4/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/1/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/1/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
4/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/2/2020
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
4/2/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
4/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
4/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
4/3/2020
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2020
|
Approved
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/16/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/17/2020
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
4/30/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/4/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/5/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/6/2020
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Final
|
5/6/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Green Building Final
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
5/6/2020
|
SGSOV No Gas
|
JAMES POWERS
|
|
Smoke Detectors
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Structural Steel Frame
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/6/2020
|
Approved
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/7/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/8/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/13/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/14/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/15/2020
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
5/19/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/20/2020
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
5/20/2020
|
OK for TCO
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/21/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Fireproofing
|
5/22/2020
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
10/9/2020
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
11/2/2020
|
Approved
|
JAMES POWERS
|
|
Final
|
11/4/2020
|
OK to Issue CofO
|
JAMES POWERS
|