966 S KENMORE AVE 90006

Certificate Information: 966 S KENMORE AVE 90006

Application / Permit
18010-10000-03412
Plan Check / Job No.
B18LA13583
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED 6 STORY (5 LEVELS OF TYPE III-A OVER ONE LEVEL OF TYPE 1-A) OVER 1 LEVEL OF TYPE 1-A BASEMENT GARAGE WITH 50 RESIDENTIAL UNITS W/ROOF TOP DECK TOC PROJECT (TIER 3) 50 UNIT APARTMENT (45 MARKET RATE WITH 5 ELI UNITS) 70% DENSITY INCREASE, PARKING BASED ON .5 PER UNIT, 50% FAR INCREASE, WITH 3 ADDITIONAL INCENTIVES- YARD REDUCTIONS, AND OPEN SPACE REDUCTION. STAIRS AND RAILS ARE DEFERRED
Permit Issued
Issued on 3/28/2019
Issuing Office
Metro
Current Status
CofO Issued on 3/31/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/3/2018 APPLICANT
Assigned to Plan Check Engineer 8/2/2018 JOHN VASQUEZ
Green Plans Picked Up 8/6/2018 APPLICANT
Corrections Issued 8/21/2018 JOHN VASQUEZ
Quality Review Completed 8/23/2018 CHARLES CHANG
Building Plans Picked Up 8/27/2018 APPLICANT
Applicant returned to address corrections 9/19/2018 JOHN VASQUEZ
Applicant returned to address corrections 11/28/2018 JOHN VASQUEZ
Applicant returned to address corrections 12/4/2018 JOHN VASQUEZ
Applicant returned to address corrections 12/13/2018 JOHN VASQUEZ
Applicant returned to address corrections 12/27/2018 JOHN VASQUEZ
Applicant returned to address corrections 2/7/2019 JOHN VASQUEZ
Applicant returned to address corrections 2/21/2019 JOHN VASQUEZ
Applicant returned to address corrections 3/12/2019 JOHN VASQUEZ
Plan Check Approved 3/22/2019 JOHN VASQUEZ
Issued 3/28/2019 LADBS
TCO Issued (Expire Date: 04-24-2021) 10/26/2020 DAVID TSAU
CofO in Progress 3/31/2021 RAFAEL ESPINOZA
CofO Issued 3/31/2021 DAVID TSAU
Permit Finaled 3/31/2021 DAVID TSAU

Permit Application Clearance Information

Construction near power lines Cleared 9/7/2018 WALTER RAMIREZ
Construction within easement Cleared 9/7/2018 WALTER RAMIREZ
Address approval Cleared 9/24/2018 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 9/24/2018 JEANETTE VONG
Highway dedication Cleared 9/26/2018 JAMES MORALEZ
Hydrant and Access approval Cleared 10/3/2018 GEORGE SUCHAND
Green Code Cleared 11/7/2018 SARAH ABOULHOSN
DAS Clearance Cleared 11/15/2018 ELIZABETH TOMS
Bicycle Parking Cleared 11/19/2018 KAREN LE
Permit Cleared 11/19/2018 STEVE MELGAR
Project located in CRA area Cleared 12/5/2018 JIM URQUHART
Driveway location Cleared 12/13/2018 TAIMOUR TANAVOLI
Internal circulation Cleared 12/13/2018 TAIMOUR TANAVOLI
Building over 3-story or 36-ft Cleared 1/23/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/23/2019 CALOSHA APPROVED
Trees in Parkway Cleared 1/28/2019 JOHN KIM
Low Impact Development Cleared 2/20/2019 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 2/20/2019 NGOC KIEM
Sewer availability Cleared 2/20/2019 JAMES MORALEZ
Stormwater Pollution Mitigatn Cleared 2/20/2019 MARTIN FRAGOSO
DCP conditions approval Cleared 3/5/2019 MICHAEL ZIRBES
Density Bonus 12.22.A.31 Cleared 3/5/2019 MICHAEL ZIRBES
Frnt yard landscape/Water mgmt Cleared 3/13/2019 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 3/13/2019 SOPHIE GABEL-SCHEINBAU
Miscellaneous Cleared 3/13/2019 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 3/13/2019 SOPHIE GABEL-SCHEINBAU
Fire Marshall Fire Life Safety Cleared 3/19/2019 DOMINIQUE MEDINA
Work Adjacent to Public Way Cleared 3/19/2019 BOK GOH

Contact Information

Architect Kim, Seong Bae; Lic. No.: C23320 3450 WILSHIRE BLVD SUITE 1000      LOS ANGELES, CA 90010
Contractor Wilshire Construction L P; Lic. No.: 1048091-B 3470 WILSHIRE   STE 1010    LOS ANGELES, CA 90010
Engineer Lee, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/17/2019 Partial Inspection LESLIE TRUJILLO
Deputy Steel/Welding 4/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/23/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/23/2019 Partial Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/28/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/31/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/31/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/6/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 6/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Seismic Resistance 6/7/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 6/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/25/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/22/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/22/2019 Partial Inspection LESLIE TRUJILLO
Green Building Rough 7/23/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/23/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/23/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/31/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 7/31/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/30/2019 Partial Approval JAMES POWERS
Structural Steel Frame 9/3/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/30/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/15/2019 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 10/30/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/12/2019 No Access for Inspection LESLIE TRUJILLO
Deputy Wood Construction 11/13/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/13/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/18/2019 Partial Approval LESLIE TRUJILLO
Insulation 11/25/2019 Partial Approval DANIEL COLLINS
Wood Frame 11/27/2019 Not Ready for Inspection DAVID BURKHEAD
Deputy Wood Construction 12/3/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 12/3/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 12/20/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 12/20/2019 Partial Approval LESLIE TRUJILLO
Insulation 1/2/2020 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/6/2020 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 1/7/2020 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/9/2020 Not Ready for Inspection LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/10/2020 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/13/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/16/2020 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/21/2020 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/22/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/23/2020 No Access for Inspection LESLIE TRUJILLO
Drywall Nailing 1/24/2020 Not Ready for Inspection LESLIE TRUJILLO
Drywall Nailing 1/28/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/28/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 1/30/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/31/2020 Partial Approval RAFAEL ESPINOZA
Insulation 1/31/2020 Partial Inspection RAFAEL ESPINOZA
Insulation 2/4/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 2/5/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/11/2020 Not Ready for Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 2/14/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 2/20/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 2/20/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/20/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/24/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/24/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/25/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/25/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/25/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/4/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/5/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/5/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/6/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/9/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/10/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/12/2020 No Access for Inspection LESLIE TRUJILLO
Drywall Nailing 3/13/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/16/2020 Partial Approval RAFAEL ESPINOZA
Structural Steel Frame 3/16/2020 Approved RAFAEL ESPINOZA
Drywall Nailing 3/23/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/23/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/25/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/3/2020 Partial Approval RAFAEL ESPINOZA
Insulation 4/3/2020 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 4/10/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/10/2020 Partial Approval RAFAEL ESPINOZA
Insulation 4/14/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 4/21/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/5/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/19/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/26/2020 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 5/28/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/11/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/20/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/10/2020 Partial Approval RAFAEL ESPINOZA
Final 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 8/21/2020 Approved RAFAEL ESPINOZA
Green Building Final 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 8/21/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 8/21/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 8/21/2020 Partial Approval RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 8/21/2020 SGSOV Not Ready RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/21/2020 Not Ready for Inspection RAFAEL ESPINOZA
Final 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 9/4/2020 SGSOV Not Ready RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 9/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Grading Pre-Inspection 9/9/2020 Partial Inspection RAFAEL ESPINOZA
Final 10/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 10/13/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 10/13/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 10/13/2020 Conditional Approval RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/13/2020 SGSOV Approved RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 10/13/2020 Approved RAFAEL ESPINOZA
Smoke Detectors 10/13/2020 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Final 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/23/2020 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 10/23/2020 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/23/2020 Approved RAFAEL ESPINOZA
Final 12/11/2020 Not Ready for Inspection RAFAEL ESPINOZA
Final 2/18/2021 Conditional Approval RAFAEL ESPINOZA
Final 3/3/2021 Corrections Issued RAFAEL ESPINOZA
Special/Order Compliance 3/31/2021 Approved RAFAEL ESPINOZA