Deputy Grading
|
12/8/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/16/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/19/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/21/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/22/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/23/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/27/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Grading
|
12/28/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/29/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
12/30/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
1/3/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
2/6/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
4/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
4/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
4/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
4/14/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/20/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/12/2023
|
Partial Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
7/13/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/26/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
7/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
7/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/27/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
8/3/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
8/7/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
8/9/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
8/9/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/9/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/9/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/11/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/19/2023
|
Partial Approval
|
TED RIES
|
|
METHANE-Barrier
|
8/19/2023
|
Not Ready for Inspection
|
TED RIES
|
|
METHANE-Subgrade
|
8/19/2023
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
8/30/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/31/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
9/1/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/8/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
9/8/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/15/2023
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Excavation/Setback/Form/Re-Bar
|
9/15/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2023
|
Partial Approval
|
TIMOTHY POWELL
|
|
Deputy Reinf. Concrete
|
9/20/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/21/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
9/21/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
9/21/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/22/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
10/3/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Methane Barrier
|
10/6/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
10/23/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
10/23/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
10/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
10/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Methane Barrier
|
10/27/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/27/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/27/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
10/27/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
10/27/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
10/28/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
METHANE-Rough
|
10/28/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2023
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
11/6/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/20/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/20/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/20/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/21/2023
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
11/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2023
|
Off-Hour Fees Due
|
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2023
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/28/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/8/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/10/2024
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
1/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/17/2024
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
2/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/7/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
3/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
3/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
3/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/15/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
3/19/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
3/19/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
3/19/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
4/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
4/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
4/2/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
4/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
4/3/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/4/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
4/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
4/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
4/24/2024
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/6/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
METHANE-Rough
|
5/6/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Verify Sprinkler Sign Off
|
5/6/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Wood Frame
|
5/6/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
5/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
5/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
5/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/17/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Wood Frame
|
5/20/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
5/23/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
5/28/2024
|
Not Ready for Inspection
|
JACOB MYERS
|
|
METHANE-Rough
|
5/28/2024
|
Not Ready for Inspection
|
JACOB MYERS
|
|
Verify Sprinkler Sign Off
|
5/28/2024
|
Not Ready for Inspection
|
JACOB MYERS
|
|
Wood Frame
|
5/28/2024
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
6/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
6/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
6/17/2024
|
Partial Approval
|
LARRY ARNICK
|
|
METHANE-Rough
|
6/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/17/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Green Building Rough
|
6/20/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
6/20/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
6/20/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
6/20/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/10/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
7/10/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
7/15/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
7/15/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
7/15/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
7/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/30/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
8/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/6/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/7/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/20/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
8/21/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
8/28/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
9/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
9/20/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
9/25/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
9/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
9/27/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
9/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
11/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
12/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
12/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/18/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
3/18/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
4/14/2025
|
Approved
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/19/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Footing/Foundation/Slab
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Green Building Final
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Green Building Rough
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
METHANE-Final
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
METHANE-Rough
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
SGSOV-Seismic Gas S/O Valve
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Smoke Detectors
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Verify Sprinkler Sign Off
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Wood Frame
|
6/9/2025
|
Off-Hour Fees Due
|
|
|
Pre-Inspection
|
7/18/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
7/21/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/21/2025
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
7/21/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
7/21/2025
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Final
|
7/21/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
7/21/2025
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
7/21/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
7/21/2025
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
7/21/2025
|
Approved
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/21/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/21/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Final
|
7/23/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Green Building Final
|
7/23/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Final
|
7/23/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
7/23/2025
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
7/23/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/23/2025
|
Approved
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/23/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/8/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Final
|
8/11/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
8/11/2025
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Final
|
8/11/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
8/11/2025
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/11/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/11/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Final
|
8/25/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
METHANE-Final
|
8/25/2025
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
8/25/2025
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/25/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
8/25/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/25/2025
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/26/2025
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
8/27/2025
|
OK to Issue CofO
|
DAVID BURKHEAD
|