1255 S ELDEN AVE 1-93 90006

Certificate Information: 1255 S ELDEN AVE 1-93 90006

Application / Permit
18010-10000-03031
Plan Check / Job No.
B18LA12067
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW CONSTRUCTION 93 UNITS APARTMENT BUILDING (2 STORY PODIUM PARKING ABOVE GRADE AND 5 STORY RESIDENTIAL, WITH 92 LOW INCOME UNITS)
Permit Issued
Issued on 12/19/2018
Issuing Office
Metro
Current Status
CofO Issued on 4/6/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/20/2018 APPLICANT
Assigned to Plan Check Engineer 7/18/2018 LARRY LEE
Corrections Issued 7/27/2018 LARRY LEE
Quality Review Completed 7/31/2018 CHARLES CHANG
Building Plans Picked Up 8/2/2018 APPLICANT
Applicant returned to address corrections 8/20/2018 LARRY LEE
Plan Check Approved 12/18/2018 LARRY LEE
Issued 12/19/2018 LADBS
TCO Issued (Expire Date: 08-02-2021) 2/3/2021 ERNESTO CORRAL
CofO in Progress 4/6/2021 DANIEL COLLINS
CofO Issued 4/6/2021 DAVID TSAU
Permit Finaled 4/6/2021 DAVID TSAU

Permit Application Clearance Information

Address approval Cleared 7/16/2018 CARLA VALLADARES
Eng Process Fee Ord 176,300 Cleared 7/16/2018 CARLA VALLADARES
Miscellaneous Cleared 7/16/2018 YOVANA PEREZ
Permit Cleared 7/16/2018 CARLA VALLADARES
ZI Cleared 7/16/2018 YOVANA PEREZ
ZI Cleared 7/16/2018 YOVANA PEREZ
Driveway location Cleared 8/8/2018 EDUARDO HERMOSO
Internal circulation Cleared 8/8/2018 EDUARDO HERMOSO
Hydrant and Access approval Cleared 8/16/2018 GEORGE SUCHAND
Highway dedication Cleared 10/16/2018 ADOLFO GUTIERREZ
Trees in Parkway Cleared 10/16/2018 LUIS TORRES
Building over 3-story or 36-ft Cleared 11/14/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/14/2018 CALOSHA APPROVED
DAS Clearance Cleared 12/3/2018 LARRY LEE
Sewer availability Cleared 12/6/2018 NAZILA NOORIFAR
Density Bonus 12.22.A.25 Cleared 12/10/2018 KENNETH LE
Fire Marshall Fire Life Safety Cleared 12/12/2018 WILLIAM JOHNS
Frnt yard landscape/Water mgmt Cleared 12/13/2018 YOVANA PEREZ
Green Code Cleared 12/13/2018 LARRY LEE
Low Impact Development Cleared 12/13/2018 RYAN HUDSON
Miscellaneous Cleared 12/13/2018 YOVANA PEREZ
Miscellaneous Cleared 12/13/2018 YOVANA PEREZ
Miscellaneous Cleared 12/13/2018 YOVANA PEREZ
Opn space landscape/Water mgmt Cleared 12/13/2018 YOVANA PEREZ
Roof/Waste drainage to street Cleared 12/13/2018 ADRIAN SANCHEZ
Site Plan review Cleared 12/13/2018 YOVANA PEREZ

Contact Information

Architect Silberstein,, Neil Jacob; Lic. No.: C30410 17145 BALTAR STREET      VAN NUYS, CA 91406
Contractor United Building Company Inc; Lic. No.: 1034972-B 21515 HAWTHORNE BLVD STE 200      TORRANCE, CA
Engineer Adams,, Jelisa Thomas; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer Mehta,, Manish Jitendra; Lic. No.: C54381 16600 SHERMAN WAY STE 180      VAN NUYS, CA 91406

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/11/2019 Not Ready for Inspection ERNESTO CORRAL
Pre-Inspection 4/9/2019 Partial Inspection NICK DANERI
Footing/Foundation/Slab 4/16/2019 Partial Approval NICK DANERI
Footing/Foundation/Slab 4/18/2019 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 4/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/29/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/2/2019 Partial Inspection DANIEL COLLINS
Deputy Reinf. Concrete 5/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/6/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/7/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 5/8/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 5/9/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 5/9/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 5/13/2019 Conditional Approval KATY RAMIREZ
Pre-Inspection 5/13/2019 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 5/16/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 5/24/2019 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 5/31/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/3/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/4/2019 Approved DANIEL COLLINS
Deputy Reinf. Masonry 6/5/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 6/5/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/7/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 6/13/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 6/13/2019 Partial Approval HAMID PISHEHVAR
Deputy Reinf. Concrete 6/25/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 6/25/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/17/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 7/17/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/19/2019 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 7/23/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 7/23/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 7/26/2019 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/26/2019 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/30/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 8/1/2019 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 8/1/2019 Partial Approval ERNESTO CORRAL
Deputy Reinf. Masonry 8/2/2019 Conditional Approval DAVID TSAU
Deputy Reinf. Masonry 8/6/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/6/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/4/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 9/4/2019 Not Ready for Inspection DANIEL COLLINS
Deputy Reinf. Concrete 9/5/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 9/5/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/6/2019 Conditional Approval DANIEL COLLINS
Drywall Nailing 9/6/2019 Not Ready for Inspection DANIEL COLLINS
Footing/Foundation/Slab 9/6/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 9/17/2019 Partial Inspection DANIEL COLLINS
Wood Frame 9/18/2019 Partial Inspection DANIEL COLLINS
Structural Steel Frame 9/19/2019 Partial Approval DANIEL COLLINS
Wood Frame 9/23/2019 Partial Inspection DANIEL COLLINS
Wood Frame 9/25/2019 Partial Inspection DANIEL COLLINS
Wood Frame 9/27/2019 Partial Inspection DANIEL COLLINS
Pre-Inspection 9/30/2019 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 10/2/2019 Partial Approval DANIEL COLLINS
Wood Frame 10/3/2019 Partial Approval DANIEL COLLINS
Wood Frame 10/7/2019 Partial Approval DANIEL COLLINS
Deputy Wood Construction 10/8/2019 Conditional Approval DANIEL COLLINS
Wood Frame 10/8/2019 Partial Approval DANIEL COLLINS
Deputy Wood Construction 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/10/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/11/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/15/2019 Conditional Approval DANIEL COLLINS
Wood Frame 10/15/2019 Conditional Approval DANIEL COLLINS
Wood Frame 10/17/2019 Partial Approval DANIEL COLLINS
Wood Frame 10/18/2019 Not Ready for Inspection DANIEL COLLINS
Footing/Foundation/Slab 10/21/2019 Partial Approval DANIEL COLLINS
Wood Frame 10/22/2019 Partial Approval DANIEL COLLINS
Deputy Wood Construction 10/24/2019 Conditional Approval DANIEL COLLINS
Wood Frame 10/24/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/25/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/28/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 10/29/2019 Conditional Approval DANIEL COLLINS
Wood Frame 10/29/2019 Partial Approval DANIEL COLLINS
Deputy Wood Construction 10/30/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 11/5/2019 Conditional Approval DANIEL COLLINS
Wood Frame 11/5/2019 Partial Approval DANIEL COLLINS
Deputy Wood Construction 11/6/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 11/7/2019 Conditional Approval DANIEL COLLINS
Drywall Nailing 11/7/2019 Partial Inspection DANIEL COLLINS
Wood Frame 11/7/2019 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 11/8/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 11/8/2019 Conditional Approval DANIEL COLLINS
Insulation 11/8/2019 Not Ready for Inspection DANIEL COLLINS
Deputy Wood Construction 11/12/2019 Conditional Approval DANIEL COLLINS
Wood Frame 11/12/2019 Partial Inspection DANIEL COLLINS
Wood Frame 11/26/2019 Partial Approval DANIEL COLLINS
Wood Frame 12/2/2019 Partial Approval DANIEL COLLINS
Deputy Wood Construction 12/3/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 12/5/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 12/6/2019 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 12/9/2019 Conditional Approval KATY RAMIREZ
Wood Frame 12/13/2019 Partial Approval DANIEL COLLINS
Wood Frame 12/16/2019 Partial Approval DANIEL COLLINS
Wood Frame 12/19/2019 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 1/6/2020 Conditional Approval DANIEL COLLINS
Wood Frame 1/7/2020 Partial Approval DANIEL COLLINS
Insulation 1/8/2020 Not Ready for Inspection DANIEL COLLINS
Wood Frame 1/8/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 1/10/2020 Not Ready for Inspection DANIEL COLLINS
Footing/Foundation/Slab 1/21/2020 Not Ready for Inspection DANIEL COLLINS
Wood Frame 1/22/2020 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 1/27/2020 Partial Inspection DANIEL COLLINS
Wood Frame 1/28/2020 Partial Approval DANIEL COLLINS
Wood Frame 1/30/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 2/5/2020 Partial Approval DANIEL COLLINS
Wood Frame 2/5/2020 Partial Approval DANIEL COLLINS
Wood Frame 2/6/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 2/13/2020 Partial Approval DANIEL COLLINS
Deputy Wood Construction 2/19/2020 Conditional Approval DANIEL COLLINS
Insulation 2/19/2020 Partial Approval DANIEL COLLINS
Wood Frame 2/19/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 2/21/2020 Partial Approval DANIEL COLLINS
Wood Frame 2/24/2020 Partial Approval DANIEL COLLINS
Insulation 3/2/2020 Partial Approval DANIEL VARNUM
Wood Frame 3/3/2020 Not Ready for Inspection DANIEL COLLINS
Drywall Nailing 3/4/2020 Partial Approval DANIEL COLLINS
Insulation 3/4/2020 Partial Approval DANIEL COLLINS
Wood Frame 3/4/2020 Partial Approval DANIEL COLLINS
Insulation 3/11/2020 Partial Approval DANIEL COLLINS
Wood Frame 3/12/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 3/18/2020 Partial Approval DANIEL COLLINS
Insulation 3/18/2020 Partial Approval DANIEL COLLINS
Wood Frame 3/19/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 3/25/2020 Partial Approval DANIEL COLLINS
Wood Frame 3/25/2020 Partial Approval DANIEL COLLINS
Insulation 3/26/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 4/14/2020 Partial Approval DANIEL COLLINS
Insulation 4/14/2020 Partial Approval DANIEL COLLINS
Wood Frame 4/15/2020 Approved DANIEL COLLINS
Drywall Nailing 4/16/2020 Partial Approval DANIEL COLLINS
Insulation 4/20/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 4/20/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 4/21/2020 Partial Inspection DANIEL COLLINS
Drywall Nailing 4/22/2020 Partial Approval DANIEL COLLINS
Wood Frame 4/23/2020 Corrections Issued DANIEL COLLINS
Drywall Nailing 4/28/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 4/28/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 5/5/2020 Partial Approval DANIEL COLLINS
Wood Frame 5/6/2020 Not Ready for Inspection DANIEL COLLINS
Drywall Nailing 5/12/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 5/12/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 5/13/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 5/18/2020 Partial Inspection DANIEL COLLINS
Wood Frame 5/21/2020 Partial Approval DANIEL COLLINS
Insulation 5/26/2020 Partial Inspection DANIEL COLLINS
Drywall Nailing 5/28/2020 Partial Approval DANIEL COLLINS
Insulation 5/28/2020 Partial Approval DANIEL COLLINS
Insulation 6/3/2020 Partial Approval DANIEL COLLINS
Wood Frame 6/4/2020 Not Ready for Inspection DANIEL COLLINS
Drywall Nailing 6/8/2020 Partial Approval DANIEL COLLINS
Insulation 6/8/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 6/10/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 6/17/2020 Partial Approval DANIEL COLLINS
Insulation 6/17/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 6/19/2020 Partial Approval DANIEL COLLINS
Insulation 6/19/2020 Partial Approval DANIEL COLLINS
Insulation 6/22/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 6/30/2020 Partial Approval DANIEL COLLINS
Insulation 6/30/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 6/30/2020 Not Ready for Inspection DANIEL COLLINS
Interior/Exterior Lathing 7/1/2020 Not Ready for Inspection DANIEL COLLINS
Insulation 7/8/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 7/8/2020 Partial Approval DANIEL COLLINS
Insulation 7/13/2020 Corrections Issued DANIEL COLLINS
Drywall Nailing 7/14/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 7/14/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 7/16/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 7/20/2020 Partial Inspection DANIEL COLLINS
Interior/Exterior Lathing 7/20/2020 Partial Inspection DANIEL COLLINS
Drywall Nailing 7/23/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 8/5/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 8/5/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 8/10/2020 Partial Inspection DANIEL COLLINS
Wood Frame 8/11/2020 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 8/12/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 8/14/2020 Partial Inspection DANIEL COLLINS
Interior/Exterior Lathing 8/18/2020 Approved DANIEL COLLINS
Structural Steel Frame 8/20/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 8/24/2020 Conditional Approval DANIEL COLLINS
Structural Steel Frame 8/24/2020 Partial Inspection DANIEL COLLINS
Wood Frame 8/26/2020 Partial Approval DANIEL COLLINS
Interior/Exterior Lathing 8/27/2020 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 8/31/2020 Conditional Approval DANIEL COLLINS
Structural Steel Frame 8/31/2020 Partial Approval DANIEL COLLINS
Structural Steel Frame 9/2/2020 Partial Approval DANIEL COLLINS
Structural Steel Frame 9/8/2020 Partial Approval DANIEL COLLINS
Structural Steel Frame 9/9/2020 Partial Inspection DANIEL COLLINS
Light Gage Steel Frame 9/10/2020 Partial Inspection DANIEL COLLINS
Light Gage Steel Frame 9/15/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 9/25/2020 Partial Approval DANIEL COLLINS
Drywall Nailing 9/29/2020 Partial Inspection DANIEL COLLINS
Structural Steel Frame 9/30/2020 Approved DANIEL COLLINS
Drywall Nailing 10/7/2020 Partial Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 10/21/2020 Conditional Approval LANNY MERRICK
Drywall Nailing 10/21/2020 Partial Approval LANNY MERRICK
Drywall Nailing 10/22/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 11/2/2020 Partial Inspection DANIEL COLLINS
Interior/Exterior Lathing 11/4/2020 Approved DANIEL COLLINS
Wood Frame 11/9/2020 Approved DANIEL COLLINS
Interior/Exterior Lathing 11/10/2020 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 11/13/2020 Partial Approval DANIEL COLLINS
T-Bar Ceiling 11/18/2020 Approved DANIEL COLLINS
Footing/Foundation/Slab 11/20/2020 Partial Approval DANIEL COLLINS
Footing/Foundation/Slab 11/24/2020 Not Ready for Inspection DANIEL COLLINS
T-Bar Ceiling 11/30/2020 Partial Inspection DANIEL COLLINS
Footing/Foundation/Slab 12/9/2020 Approved DANIEL COLLINS
Wood Frame 12/10/2020 Approved DANIEL COLLINS
Green Building Final 12/11/2020 Not Ready for Inspection DANIEL COLLINS
Wood Frame 12/11/2020 Approved DANIEL COLLINS
Wood Frame 12/14/2020 Not Ready for Inspection DANIEL COLLINS
Drywall Nailing 12/15/2020 Partial Inspection DANIEL COLLINS
Interior/Exterior Lathing 12/16/2020 Approved DANIEL COLLINS
Masonry Wall/Backfill 12/16/2020 Approved DANIEL COLLINS
Structural Steel Frame 12/17/2020 Approved DANIEL COLLINS
Interior/Exterior Lathing 12/22/2020 Partial Inspection DANIEL COLLINS
Special/Order Compliance 12/23/2020 Partial Inspection DANIEL COLLINS
Pre-Inspection 1/5/2021 Partial Inspection DANIEL COLLINS
Interior/Exterior Lathing 1/7/2021 Approved DANIEL COLLINS
T-Bar Ceiling 1/7/2021 Approved DANIEL COLLINS
Green Building Final 1/11/2021 Approved DANIEL COLLINS
Verify Rec and Parks Fee Memo 1/12/2021 Approved DANIEL COLLINS
Verify Sprinkler Sign Off 1/12/2021 Approved DANIEL COLLINS
Interior/Exterior Lathing 1/13/2021 Approved DANIEL COLLINS
Final 1/14/2021 Partial Inspection DANIEL COLLINS
Green Building Rough 1/14/2021 Approved DANIEL COLLINS
Reinforced Concrete Frame 1/14/2021 Approved DANIEL COLLINS
Reinforced Masonry Frame 1/14/2021 Approved DANIEL COLLINS
SGSOV-Seismic Gas S/O Valve 1/14/2021 SGSOV Approved DANIEL COLLINS
Smoke Detectors 1/14/2021 Not Ready for Inspection DANIEL COLLINS
Drywall Nailing 1/19/2021 Approved DANIEL COLLINS
T-Bar Ceiling 1/20/2021 Approved DANIEL COLLINS
Final 1/21/2021 Conditional Approval DANIEL COLLINS
Smoke Detectors 1/21/2021 Approved DANIEL COLLINS
Final 1/26/2021 Not Ready for Inspection DANIEL COLLINS
Interior/Exterior Lathing 1/26/2021 Approved DANIEL COLLINS
Final 1/27/2021 Partial Inspection DANIEL COLLINS
Final 1/28/2021 OK for TCO DANIEL COLLINS
Final 2/1/2021 Partial Inspection DANIEL COLLINS
Pre-Inspection 2/2/2021 Partial Approval DANIEL COLLINS
Final 2/25/2021 Conditional Approval DANIEL COLLINS
Final 3/1/2021 Conditional Approval DANIEL COLLINS