2310-2310 3/4 E 3RD ST 90033

Certificate Information: 2310-2310 3/4 E 3RD ST 90033

Application / Permit
18010-10000-02980
Plan Check / Job No.
B18LA12011
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
NEW 2 STORY DUPLEX WITH ATTACHED 2 CAR GARAGE
Permit Issued
Issued on 6/24/2020
Issuing Office
Metro
Current Status
CofO Issued on 4/13/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/14/2018 APPLICANT
Disabled Access Plans Picked Up 7/16/2018 APPLICANT
Green Plans Picked Up 7/23/2018 APPLICANT
Assigned to Plan Check Engineer 7/31/2018 ARMEN JIVALAGIAN
Corrections Issued 8/16/2018 ARMEN JIVALAGIAN
Quality Review Completed 8/21/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 8/23/2018 APPLICANT
Applicant returned to address corrections 3/15/2019 ARMEN JIVALAGIAN
Applicant returned to address corrections 4/17/2019 ARMEN JIVALAGIAN
Plan Check Approved 2/21/2020 ARMEN JIVALAGIAN
Issued 6/24/2020 LADBS
CofO in Progress 4/9/2025 FREDDIE RIVERA
Permit Finaled 4/13/2025 DEROLD HAUFF
CofO Issued 4/13/2025 DEROLD HAUFF
Permit Finaled 4/13/2025 DEROLD HAUFF

Permit Application Clearance Information

Clean Up Green Up Cleared 9/6/2018 YOVANA PEREZ
Address approval Cleared 12/19/2019 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 12/19/2019 THOMAS LANG
Highway dedication Cleared 12/19/2019 THOMAS LANG
Permit Cleared 12/19/2019 THOMAS LANG
Project located in CRA area Cleared 12/19/2019 GRACIELA ACOSTA
Frnt yard landscape/Water mgmt Cleared 12/26/2019 JOE LUCKEY
Hydrant and Access approval Cleared 12/26/2019 JEREMY CARTER
Sewer availability Cleared 12/26/2019 CELINA MORENO
GPI Written Notices Cleared 1/31/2020 ARMEN JIVALAGIAN
Grading Pre-Inspection Cleared 1/31/2020 ARMEN JIVALAGIAN
Green Code Cleared 1/31/2020 ARMEN JIVALAGIAN
Low Impact Development Cleared 1/31/2020 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 1/31/2020 JEANETTE VONG
Trees in Parkway Cleared 2/3/2020 STEPHEN DUPREY
DAS Clearance Cleared 2/21/2020 WAI LAU

Contact Information

Contractor D L T Construction; Lic. No.: 890424-B 6000 S AVALON BLVD      LOS ANGELES, CA 90003
Engineer Palaha, Jiwanjit Singh; Lic. No.: C49533 20529 E RANCHO SAN JOSE DR      COVINA, CA 91724

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/6/2020 Corrections Issued OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 9/17/2020 Not Ready for Inspection OSVALDO PARAMO
METHANE-Subgrade 9/17/2020 Not Ready for Inspection OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 10/21/2020 Partial Approval OSVALDO PARAMO
METHANE-Rough 10/21/2020 Partial Approval OSVALDO PARAMO
Deputy Reinf. Concrete 11/2/2020 Approved OSVALDO PARAMO
Footing/Foundation/Slab 11/2/2020 Partial Approval OSVALDO PARAMO
METHANE-Barrier 11/2/2020 Partial Inspection OSVALDO PARAMO
METHANE-Subgrade 11/2/2020 Partial Inspection OSVALDO PARAMO
Deputy Methane Barrier 11/5/2020 No Access for Inspection ELMER BLAND
Deputy Methane Barrier 11/6/2020 No Access for Inspection ELMER BLAND
Deputy Methane Barrier 11/9/2020 No Access for Inspection ELMER BLAND
Footing/Foundation/Slab 11/12/2020 Approved OSVALDO PARAMO
METHANE-Barrier 11/12/2020 Approved OSVALDO PARAMO
METHANE-Subgrade 11/12/2020 Approved OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 1/19/2021 Approved OSVALDO PARAMO
Green Building Rough 1/19/2021 Approved OSVALDO PARAMO
METHANE-Rough 1/19/2021 Approved OSVALDO PARAMO
Verify Sprinkler Sign Off 1/19/2021 Approved OSVALDO PARAMO
Wood Frame 1/19/2021 Not Ready for Inspection OSVALDO PARAMO
Wood Frame 2/12/2021 Not Ready for Inspection OSVALDO PARAMO
Wood Frame 2/17/2021 Partial Approval CRAIG VAUGHAN
Insulation 2/24/2021 Approved OSVALDO PARAMO
Interior/Exterior Lathing 2/24/2021 Partial Approval OSVALDO PARAMO
Drywall Nailing 3/2/2021 Approved OSVALDO PARAMO
Green Building Rough 3/2/2021 Approved OSVALDO PARAMO
Interior/Exterior Lathing 3/2/2021 Approved OSVALDO PARAMO
Verify Sprinkler Sign Off 3/2/2021 Approved OSVALDO PARAMO
Wood Frame 3/2/2021 Approved OSVALDO PARAMO
Final 8/11/2023 Corrections Issued SCOTT FINNILA
Green Building Final 8/11/2023 Not Ready for Inspection SCOTT FINNILA
SGSOV-Seismic Gas S/O Valve 8/11/2023 SGSOV Not Ready SCOTT FINNILA
Smoke Detectors 8/11/2023 Not Ready for Inspection SCOTT FINNILA
Deputy Methane Barrier 2/12/2024 Conditional Approval FREDDIE RIVERA
Deputy Methane Barrier 2/16/2024 Conditional Approval FREDDIE RIVERA
Final 7/3/2024 Corrections Issued FREDDIE RIVERA
Green Building Final 7/3/2024 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 7/3/2024 SGSOV Approved FREDDIE RIVERA
Smoke Detectors 7/3/2024 Approved FREDDIE RIVERA
Final 11/25/2024 Partial Inspection FREDDIE RIVERA
Final 2/10/2025 Corrections Issued FREDDIE RIVERA
Final 2/14/2025 OK to Issue CofO FREDDIE RIVERA