252 N HOOVER ST 90004

Certificate Information: 252 N HOOVER ST 90004

Application / Permit
18010-10000-02884
Plan Check / Job No.
B18LA11811
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6 STORY 39 UNIT APARTMENT, 4 STORIES OF TYPE III-A CONSTRUCTION OVER 2 STORIES (GARAGE) OF TYPE I-A CONSTRUCTION. NFPA SPIRNKLERS THROUGHOUT (TOC - 4 UNITS TO BE EXTREMELY LOW INCOME)
Permit Issued
Issued on 12/4/2019
Issuing Office
Metro
Current Status
CofO Issued on 12/28/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/13/2018 APPLICANT
Disabled Access Plans Picked Up 7/17/2018 APPLICANT
Green Plans Picked Up 7/19/2018 APPLICANT
Assigned to Plan Check Engineer 8/2/2018 MICHAEL PEREZ
Corrections Issued 8/30/2018 MICHAEL PEREZ
Quality Review Completed 9/4/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 9/13/2018 APPLICANT
Applicant returned to address corrections 4/15/2019 MICHAEL PEREZ
Applicant returned to address corrections 4/16/2019 MICHAEL PEREZ
Applicant returned to address corrections 4/17/2019 MICHAEL PEREZ
Applicant returned to address corrections 4/30/2019 MICHAEL PEREZ
Plan Check Approved 12/4/2019 MICHAEL PEREZ
Issued 12/4/2019 LADBS
CofO in Progress 12/28/2022 RAFAEL ESPINOZA
Permit Finaled 12/28/2022 ERNESTO CORRAL
CofO Issued 12/28/2022 ERNESTO CORRAL
Permit Finaled 12/28/2022 ERNESTO CORRAL

Permit Application Clearance Information

Permit Cleared 11/6/2018 STEVE MELGAR
Green Code Cleared 11/20/2018 COLIN LOREDO
Low Impact Development Cleared 1/4/2019 MITESH PATEL
Hydrant and Access approval Cleared 1/22/2019 GEORGE SUCHAND
DAS Clearance Cleared 1/25/2019 SOMKIAT SUPANYACHOTSKUL
Building over 3-story or 36-ft Cleared 2/1/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/1/2019 CALOSHA APPROVED
GPI Written Notices Cleared 2/1/2019 MICHAEL PEREZ
Grading Pre-Inspection Cleared 2/1/2019 MICHAEL PEREZ
Trees in Parkway Cleared 4/10/2019 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 5/8/2019 ELAINE LEI
Sewer availability Cleared 5/8/2019 ELAINE LEI
Address approval Cleared 9/26/2019 JEANIE LAM
Roof/Waste drainage to street Cleared 9/26/2019 JEANIE LAM
Density Bonus 12.22.A.31 Cleared 10/9/2019 MICHAEL ZIRBES
CPC Cleared 11/7/2019 AIDA KARAPETIAN
CPC Cleared 11/7/2019 AIDA KARAPETIAN
Miscellaneous Cleared 11/27/2019 AIDA KARAPETIAN
Opn space landscape/Water mgmt Cleared 11/27/2019 AIDA KARAPETIAN
Prkng lot landscape/Water mgmt Cleared 11/27/2019 AIDA KARAPETIAN

Contact Information

Architect Afari,, Frank; Lic. No.: C19872 1453 CLUBVIEW DRIVE      LOS ANGELES, CA 90024
Contractor Daniel S D Construction Inc; Lic. No.: 657391-B 2934 BEVERLY GLEN CIRCLE #357      LOS ANGELES, CA 90077
Engineer Enayat,, Simhaee; Lic. No.: C37206 1332 S ST JOSEPH PL      LOS ANGELES, CA 90015
Engineer Knur,, Reinard Thomas; Lic. No.: GE2755 1435 MONCADO DR      GLENDALE, CA 91207
Engineer Pirbadian,, Amir; Lic. No.: C72413 5435 BALBOA BLVD 214      ENCINO, CA 91342

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/12/2019 Approved LESLIE TRUJILLO
Footing/Foundation/Slab 1/24/2020 Not Ready for Inspection ERNESTO CORRAL
METHANE-Barrier 1/24/2020 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 1/24/2020 Not Ready for Inspection ERNESTO CORRAL
Footing/Foundation/Slab 2/3/2020 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 2/3/2020 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 2/3/2020 Not Ready for Inspection ERNESTO CORRAL
Footing/Foundation/Slab 2/12/2020 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 2/12/2020 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 2/12/2020 Not Ready for Inspection ERNESTO CORRAL
Piling/Pier/Caisson 2/12/2020 Corrections Issued ERNESTO CORRAL
Deputy Reinf. Concrete 2/14/2020 Conditional Approval LESLIE TRUJILLO
Piling/Pier/Caisson 3/5/2020 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 3/6/2020 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 3/6/2020 Partial Inspection ERNESTO CORRAL
METHANE-Subgrade 3/6/2020 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 3/9/2020 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/20/2020 Not Ready for Inspection ERNESTO CORRAL
METHANE-Rough 4/20/2020 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 4/20/2020 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 4/20/2020 Not Ready for Inspection ERNESTO CORRAL
Footing/Foundation/Slab 5/1/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Barrier 5/1/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 5/1/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 5/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 5/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/4/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Shotcrete 5/7/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/8/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 5/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Rough 5/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 5/14/2020 Approved RAFAEL ESPINOZA
METHANE-Rough 5/14/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 5/14/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/14/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 6/2/2020 Partial Approval NICK DANERI
METHANE-Barrier 6/2/2020 Conditional Approval NICK DANERI
METHANE-Subgrade 6/2/2020 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 6/15/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 6/15/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 6/15/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 6/26/2020 Partial Approval NICK DANERI
METHANE-Barrier 6/26/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 6/26/2020 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 7/21/2020 Partial Approval NICK DANERI
METHANE-Barrier 7/21/2020 Partial Inspection NICK DANERI
METHANE-Subgrade 7/21/2020 Partial Inspection NICK DANERI
METHANE-Rough 8/7/2020 Not Ready for Inspection NICK DANERI
Piling/Pier/Caisson 8/7/2020 Partial Approval NICK DANERI
Reinforced Concrete Frame 8/7/2020 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 8/7/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/11/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/11/2020 Partial Approval NICK DANERI
METHANE-Barrier 8/11/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 8/11/2020 Conditional Approval NICK DANERI
Piling/Pier/Caisson 8/11/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/12/2020 Conditional Approval NICK DANERI
Piling/Pier/Caisson 8/12/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 8/14/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/26/2020 Partial Approval NICK DANERI
METHANE-Barrier 8/26/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 8/26/2020 Not Ready for Inspection NICK DANERI
Piling/Pier/Caisson 8/26/2020 Partial Inspection NICK DANERI
Footing/Foundation/Slab 8/31/2020 Partial Approval NICK DANERI
METHANE-Barrier 8/31/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 8/31/2020 Not Ready for Inspection NICK DANERI
Piling/Pier/Caisson 8/31/2020 Partial Approval NICK DANERI
Footing/Foundation/Slab 9/15/2020 Not Ready for Inspection NICK DANERI
METHANE-Barrier 9/15/2020 Not Ready for Inspection NICK DANERI
METHANE-Subgrade 9/15/2020 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 9/18/2020 Conditional Approval NICK DANERI
Deputy Methane Barrier 9/29/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 10/5/2020 Partial Inspection NICK DANERI
METHANE-Barrier 10/5/2020 Approved NICK DANERI
METHANE-Subgrade 10/5/2020 Approved NICK DANERI
Deputy Reinf. Concrete 10/7/2020 Conditional Approval NICK DANERI
Masonry Wall/Backfill 10/8/2020 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 10/13/2020 Partial Approval NICK DANERI
Deputy Shotcrete 10/15/2020 Conditional Approval NICK DANERI
METHANE-Rough 11/19/2020 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 11/19/2020 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 11/19/2020 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 11/20/2020 Partial Approval NICK DANERI
Deputy Reinf. Concrete 11/23/2020 Conditional Approval NICK DANERI
Masonry Wall/Backfill 12/9/2020 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/10/2020 Partial Approval NICK DANERI
Deputy Shotcrete 12/11/2020 Conditional Approval NICK DANERI
Masonry Wall/Backfill 12/21/2020 Partial Approval NICK DANERI
Deputy Shotcrete 12/22/2020 Conditional Approval NICK DANERI
Footing/Foundation/Slab 2/16/2021 Not Ready for Inspection NICK DANERI
METHANE-Rough 2/17/2021 Approved NICK DANERI
Reinforced Concrete Frame 2/17/2021 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 2/17/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 2/19/2021 Partial Approval NICK DANERI
Masonry Wall/Backfill 2/22/2021 Not Ready for Inspection NICK DANERI
Deputy Reinf. Concrete 2/24/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/25/2021 Not Ready for Inspection NICK DANERI
Deputy Wood Construction 3/26/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/26/2021 Partial Approval NICK DANERI
Deputy Wood Construction 4/12/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 4/13/2021 Partial Approval NICK DANERI
Deputy Wood Construction 4/29/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 4/29/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/22/2021 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/23/2021 Partial Approval DANIEL COLLINS
Deputy Wood Construction 7/28/2021 Conditional Approval DANIEL COLLINS
Insulation 8/9/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/11/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 8/18/2021 Partial Approval JONATHAN QUACH
Wood Frame 8/24/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/26/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/27/2021 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/2/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 9/2/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 10/1/2021 Approved RAFAEL ESPINOZA
Insulation 10/29/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 11/1/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 11/2/2021 Partial Approval RAFAEL ESPINOZA
Insulation 11/8/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 11/10/2021 Partial Approval RAFAEL ESPINOZA
Insulation 11/12/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 11/12/2021 Partial Approval RAFAEL ESPINOZA
Insulation 11/16/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 11/16/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/17/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/23/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/30/2021 Partial Approval NICK DANERI
Drywall Nailing 12/7/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 12/8/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 12/21/2021 Partial Approval NICK DANERI
Light Gage Steel Frame 1/18/2022 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/23/2022 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 3/9/2022 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 7/5/2022 Corrections Issued RAFAEL ESPINOZA
Final 7/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 7/12/2022 Approved RAFAEL ESPINOZA
Green Building Final 7/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 7/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 7/12/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 7/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/12/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 7/26/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 7/26/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/26/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 7/26/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 7/26/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 7/26/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/26/2022 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 10/13/2022 Partial Inspection RAFAEL ESPINOZA
Final 11/1/2022 Corrections Issued RAFAEL ESPINOZA
Final 11/9/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 11/9/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 11/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 11/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 11/9/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 11/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/9/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 11/22/2022 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/22/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 11/22/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 11/22/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 11/22/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/22/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 12/28/2022 OK to Issue CofO RAFAEL ESPINOZA
Reinforced Concrete Frame 12/28/2022 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 12/28/2022 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/28/2022 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 12/28/2022 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/28/2022 Approved RAFAEL ESPINOZA