Pre-Inspection
|
12/12/2019
|
Approved
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
1/24/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
METHANE-Barrier
|
1/24/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
1/24/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
2/3/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
METHANE-Barrier
|
2/3/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
2/3/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
2/12/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
METHANE-Barrier
|
2/12/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
2/12/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Piling/Pier/Caisson
|
2/12/2020
|
Corrections Issued
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
2/14/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Piling/Pier/Caisson
|
3/5/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
3/6/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
METHANE-Barrier
|
3/6/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
3/6/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
3/9/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
4/20/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
METHANE-Rough
|
4/20/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
4/20/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Verify Sprinkler Sign Off
|
4/20/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
5/1/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
5/1/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
5/1/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/14/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
METHANE-Rough
|
5/14/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/14/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/2/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
6/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
METHANE-Subgrade
|
6/2/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
6/15/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
6/15/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
6/15/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/26/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
6/26/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
6/26/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
7/21/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
7/21/2020
|
Partial Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
7/21/2020
|
Partial Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
8/7/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
8/7/2020
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
8/7/2020
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
8/7/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/11/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
8/11/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
8/11/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
8/11/2020
|
Conditional Approval
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
8/11/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/12/2020
|
Conditional Approval
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
8/12/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
8/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/26/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
8/26/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
8/26/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
8/26/2020
|
Partial Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
8/31/2020
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Barrier
|
8/31/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
8/31/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
8/31/2020
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
9/15/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Barrier
|
9/15/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Subgrade
|
9/15/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/18/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Methane Barrier
|
9/29/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/5/2020
|
Partial Inspection
|
NICK DANERI
|
|
METHANE-Barrier
|
10/5/2020
|
Approved
|
NICK DANERI
|
|
METHANE-Subgrade
|
10/5/2020
|
Approved
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/7/2020
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
10/8/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
10/13/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
10/15/2020
|
Conditional Approval
|
NICK DANERI
|
|
METHANE-Rough
|
11/19/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/19/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/19/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
11/20/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/23/2020
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
12/9/2020
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/10/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
12/11/2020
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
12/21/2020
|
Partial Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
12/22/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/16/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
2/17/2021
|
Approved
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/17/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/17/2021
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/19/2021
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
2/22/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/24/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/25/2021
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Wood Construction
|
3/26/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/26/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
4/12/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2021
|
Partial Approval
|
NICK DANERI
|
|
Deputy Wood Construction
|
4/29/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/29/2021
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/22/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/23/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Wood Construction
|
7/28/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Insulation
|
8/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/11/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
8/18/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Wood Frame
|
8/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/26/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
9/2/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
10/1/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/29/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
11/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
11/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/8/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
11/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
11/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
11/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/17/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/23/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/30/2021
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
12/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/8/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/21/2021
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
1/18/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
2/23/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
3/9/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
7/5/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Final
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/12/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
7/12/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/12/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
7/26/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
7/26/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/26/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
7/26/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
7/26/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
7/26/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/26/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
10/13/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
11/1/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Final
|
11/9/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
11/9/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
11/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
11/9/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
11/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/9/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
11/22/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
11/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
11/22/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
11/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
12/28/2022
|
OK to Issue CofO
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
12/28/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
12/28/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
12/28/2022
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
12/28/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
12/28/2022
|
Approved
|
RAFAEL ESPINOZA
|