1525 N MARLAY DR 90069

Certificate Information: 1525 N MARLAY DR 90069

Application / Permit
18010-10000-02615
Plan Check / Job No.
B18LA10859
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2 STORY SFD OVER STORAGE BASEMENT SPACE WITH ATTACHED 2 CAR GARAGE
Permit Issued
Issued on 11/27/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 4/9/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/31/2018 APPLICANT
Green Plans Picked Up 7/9/2018 APPLICANT
Assigned to Plan Check Engineer 7/12/2018 ZAW HAN
Corrections Issued 7/23/2018 ZAW HAN
Building Plans Picked Up 7/30/2018 APPLICANT
Quality Review Completed 8/13/2018 HERNAN ARREOLA
Applicant returned to address corrections 8/15/2018 ZAW HAN
Applicant returned to address corrections 11/5/2018 ZAW HAN
Applicant returned to address corrections 4/1/2019 ZAW HAN
Applicant returned to address corrections 4/23/2019 ZAW HAN
Applicant returned to address corrections 6/4/2019 ZAW HAN
Applicant returned to address corrections 10/15/2019 ZAW HAN
Plan Check Approved 10/18/2019 ZAW HAN
Issued 11/27/2019 LADBS
CofO in Progress 3/31/2026 ROY SPAULDING
CofO Issued 4/9/2026 DEROLD HAUFF
Permit Finaled 4/9/2026 DEROLD HAUFF

Permit Application Clearance Information

CPC Cleared 1/15/2019 TREVOR MARTIN
Frnt yard landscape/Water mgmt Cleared 1/15/2019 TREVOR MARTIN
Miscellaneous Cleared 1/24/2019 TREVOR MARTIN
Address approval Cleared 4/1/2019 ELAINE LEI
BHO/Hillside ordinance Cleared 4/1/2019 ELAINE LEI
BHO/Hillside ordinance Cleared 4/1/2019 ELAINE LEI
BHO/Hillside ordinance Cleared 4/1/2019 ELAINE LEI
Eng Process Fee Ord 176,300 Cleared 4/1/2019 ELAINE LEI
Hydrant and Access approval Cleared 4/1/2019 GILBERT URREA
Permit Cleared 4/1/2019 ELAINE LEI
Sewer availability Cleared 4/1/2019 ELAINE LEI
Trees in Parkway Cleared 4/24/2019 ADRIAN SANCHEZ
Landscape for retaining wall Cleared 8/20/2019 SARAH GOLDMAN
Construction near power lines Cleared 8/27/2019 RIDWAN HARDY
Construction within easement Cleared 8/27/2019 RIDWAN HARDY
Green Code Cleared 9/4/2019 Zaw Han
Disturb/Remove Protected Trees Cleared 9/11/2019 ADRIAN SANCHEZ
Low Impact Development Cleared 9/17/2019 MITESH PATEL
Roof/Waste drainage to street Cleared 9/17/2019 ELAINE LEI
Excavation more than 5-ft deep Cleared 10/15/2019 CALOSHA APPROVED
GPI Written Notices Cleared 10/15/2019 VASIL MIHALEV
Grading Pre-Inspection Cleared 10/15/2019 VASIL MIHALEV

Contact Information

Contractor Construction Management & Funding Inc; Lic. No.: 827119-B 9903 SANTA MONICA BLVD #626      BEVERLY HILLS, CA 90212
Engineer Alex, Zaretskiy; Lic. No.: C84868 1386 RAMONA DR      NEWBURY PARK, CA 91320
Engineer Coons, Justin Edward; Lic. No.: L8790 PO BOX 86      ACTON, CA 93510
Engineer Payan, Atanacio; Lic. No.: L7796 2404 MARY CLARE ST      CORONA, CA 92882
Engineer Polon, Gordon Leonard; Lic. No.: C28564 709 19TH STREET      SANTA MONICA, CA 90402
Engineer Zweigler, Robert Ingraham; Lic. No.: GE2120 1461 E. CHEVY CHASE DR. #200      GLENDALE, CA 91206
Geologist Cugno, Giuseppe; Lic. No.: EG1804 J. BYER GROUP, THE   1461 E CHEVY CHASE DR, #200    GLENDALE, CA 91206

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 1/27/2021 Partial Approval RAUL BARAJAS
Pre-Inspection 2/26/2024 Approved RICHARD DOCKUS
Pre-Inspection 2/27/2024 Partial Inspection RAUL BARAJAS
Pre-Inspection 3/4/2024 Approved RICHARD DOCKUS
Piling/Pier/Caisson 5/30/2024 Not Ready for Inspection RAUL BARAJAS
Deputy Reinf. Concrete 6/3/2024 Conditional Approval BRIAN SULLIVAN
Piling/Pier/Caisson 6/3/2024 Not Ready for Inspection CRAIG VAUGHAN
Piling/Pier/Caisson 6/4/2024 Corrections Issued RAUL BARAJAS
Underground Mechanical 7/23/2024 Conditional Approval JOAQUIN GREENOUGH
Footing/Foundation/Slab 8/15/2024 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 8/30/2024 Not Ready for Inspection RAUL BARAJAS
Verify Rec and Parks Fee Memo 8/30/2024 Not Ready for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 9/10/2024 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 9/12/2024 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 10/2/2024 Partial Inspection BRIAN SULLIVAN
Footing/Foundation/Slab 10/21/2024 Partial Approval JOAQUIN GREENOUGH
Deputy Reinf. Concrete 10/23/2024 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 11/13/2024 Partial Approval JOSE MACIAS
Footing/Foundation/Slab 11/21/2024 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 12/30/2024 Partial Approval ROY SPAULDING
Deputy Reinf. Concrete 1/2/2025 Conditional Approval ROY SPAULDING
Deputy Reinf. Concrete 1/7/2025 Conditional Approval ROY SPAULDING
Excavation/Setback/Form/Re-Bar 1/22/2025 Partial Approval ROY SPAULDING
Pool Piping 1/22/2025 Approved ROY SPAULDING
Deputy Shotcrete 1/24/2025 Conditional Approval ROY SPAULDING
Deputy Reinf. Concrete 3/3/2025 Conditional Approval ROY SPAULDING
Excavation/Setback/Form/Re-Bar 3/3/2025 Partial Approval BRENDAN MORELLI
BUILDING-Rough-Frame 4/9/2025 Not Ready for Inspection ROY SPAULDING
Deputy Drilled-In Anchors 4/9/2025 Conditional Approval ROY SPAULDING
Deputy Wood Construction 4/9/2025 Conditional Approval ROY SPAULDING
Green Building Rough 4/9/2025 Not Ready for Inspection ROY SPAULDING
Verify Sprinkler Sign Off 4/9/2025 Not Ready for Inspection ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 4/24/2025 Partial Approval ROY SPAULDING
Deputy Wood Construction 4/30/2025 Conditional Approval ROY SPAULDING
Deputy Wood Construction 5/2/2025 Conditional Approval ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 5/2/2025 Approved ROY SPAULDING
Insulation 5/8/2025 Partial Approval ROY SPAULDING
BUILDING-Rough-Frame 5/14/2025 Not Ready for Inspection ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 5/14/2025 Partial Approval ROY SPAULDING
Green Building Rough 5/14/2025 Not Ready for Inspection ROY SPAULDING
Verify Sprinkler Sign Off 5/14/2025 Not Ready for Inspection ROY SPAULDING
HVAC-Rough 6/4/2025 Not Ready for Inspection ROY SPAULDING
BUILDING-Rough-Frame 6/11/2025 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Rough 6/11/2025 Corrections Issued BRENDAN MORELLI
HVAC-Rough 6/11/2025 Corrections Issued BRENDAN MORELLI
PLUMBING-Rough 6/11/2025 Corrections Issued BRENDAN MORELLI
ELECTRICAL-Rough 6/13/2025 Partial Approval BRENDAN MORELLI
HVAC-Rough 6/13/2025 Conditional Approval BRENDAN MORELLI
PLUMBING-Rough 6/13/2025 Not Ready for Inspection BRENDAN MORELLI
Shower Pan 6/13/2025 Not Ready for Inspection BRENDAN MORELLI
BUILDING-Rough-Frame 6/16/2025 Not Ready for Inspection CRAIG VAUGHAN
Green Building Rough 6/16/2025 Not Ready for Inspection CRAIG VAUGHAN
Verify Sprinkler Sign Off 6/16/2025 Not Ready for Inspection CRAIG VAUGHAN
ELECTRICAL-Rough 6/17/2025 Not Ready for Inspection ROY SPAULDING
HVAC-Rough 6/17/2025 Not Ready for Inspection ROY SPAULDING
PLUMBING-Rough 6/17/2025 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Rough 6/20/2025 Partial Approval DAVID WILLIAMS
HVAC-Rough 6/20/2025 Partial Approval DAVID WILLIAMS
PLUMBING-Rough 6/20/2025 Partial Approval DAVID WILLIAMS
Verify Sprinkler Sign Off 6/20/2025 Not Ready for Inspection DAVID WILLIAMS
BUILDING-Rough-Frame 6/24/2025 Not Ready for Inspection BRENDAN MORELLI
ELECTRICAL-Rough 6/24/2025 Approved BRENDAN MORELLI
Green Building Rough 6/24/2025 Not Ready for Inspection BRENDAN MORELLI
HVAC-Rough 6/24/2025 Approved BRENDAN MORELLI
PLUMBING-Rough 6/24/2025 Approved BRENDAN MORELLI
Shower Pan 6/24/2025 Partial Approval BRENDAN MORELLI
Shower Pan 6/26/2025 Approved JOSH MEISTER
BUILDING-Rough-Frame 6/27/2025 Not Ready for Inspection RAUL BARAJAS
Green Building Rough 6/27/2025 Not Ready for Inspection RAUL BARAJAS
Structural Steel Frame 6/27/2025 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 6/27/2025 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 7/1/2025 Partial Approval ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 7/1/2025 Not Ready for Inspection ROY SPAULDING
BUILDING-Rough-Frame 7/8/2025 Partial Approval ROY SPAULDING
Interior/Exterior Lathing 7/8/2025 Approved ROY SPAULDING
Insulation 7/9/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 7/11/2025 Approved ROY SPAULDING
Drywall Nailing 7/21/2025 Approved ROY SPAULDING
Green Building Rough 7/21/2025 Approved ROY SPAULDING
Special/Order Compliance 8/1/2025 Not Ready for Inspection CRAIG VAUGHAN
Sewer 9/10/2025 Approved ROY SPAULDING
Footing/Foundation/Slab 10/10/2025 Approved ROY SPAULDING
HVAC-Final 10/27/2025 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Final 11/5/2025 Corrections Issued ROY SPAULDING
HVAC-Final 11/5/2025 Approved ROY SPAULDING
PLUMBING-Final 11/5/2025 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Final 11/7/2025 Approved ROY SPAULDING
Gas Test 11/7/2025 Approved ROY SPAULDING
Green Building Final 11/7/2025 Not Ready for Inspection ROY SPAULDING
PLUMBING-Final 11/7/2025 Not Ready for Inspection ROY SPAULDING
Green Building Final 11/14/2025 No Access for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 11/14/2025 SGSOV Not Ready ROY SPAULDING
Smoke Detectors 11/14/2025 No Access for Inspection ROY SPAULDING
BUILDING-Rough-Frame 11/19/2025 Approved ROY SPAULDING
Final 11/19/2025 Corrections Issued ROY SPAULDING
Reinforced Concrete Frame 11/19/2025 Approved ROY SPAULDING
Verify Sprinkler Sign Off 11/19/2025 Approved ROY SPAULDING
Final 12/5/2025 Not Ready for Inspection SCOTT FINNILA
Green Building Final 12/5/2025 Approved SCOTT FINNILA
SGSOV-Seismic Gas S/O Valve 12/5/2025 SGSOV Not Ready SCOTT FINNILA
Service/Power Release 12/5/2025 Not Ready for Inspection SCOTT FINNILA
Smoke Detectors 12/5/2025 Approved SCOTT FINNILA
Service/Power Release 12/22/2025 No Access for Inspection ROY SPAULDING
Service/Power Release 12/23/2025 Approved ROY SPAULDING
Final 2/25/2026 Not Ready for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 2/25/2026 SGSOV Not Ready ROY SPAULDING
Special/Order Compliance 3/5/2026 Corrections Issued BRIAN SULLIVAN
Final 3/17/2026 Corrections Issued ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 3/17/2026 SGSOV Approved ROY SPAULDING
Wood Frame 3/19/2026 Approved ROY SPAULDING
Final 3/24/2026 OK to Issue CofO ROY SPAULDING