601 S MANHATTAN PL 90005

Certificate Information: 601 S MANHATTAN PL 90005

Application / Permit
18010-10000-02079
Plan Check / Job No.
B18LA09042
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
new construction for a 6 story mixed use building, retail and 51 units residential building over 2 levels of basements per TOC-Tier 4 and DIR-2018-5355-TOC-WDI. 1st story commercial(retail)/ garage and basements garage type I-A, 5 levels w/ mezzanine residential type III-A
Permit Issued
Issued on 11/13/2023
Issuing Office
Metro
Current Status
Issued on 11/13/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/8/2018 APPLICANT
Disabled Access Plans Picked Up 6/12/2018 APPLICANT
Assigned to Plan Check Engineer 6/21/2018 SAM CHANG
Corrections Issued 7/20/2018 SAM CHANG
Quality Review Completed 7/26/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 7/27/2018 APPLICANT
Applicant returned to address corrections 2/11/2020 SAM CHANG
Applicant returned to address corrections 2/25/2021 SAM CHANG
Applicant returned to address corrections 3/19/2021 SAM CHANG
Green Plans Picked Up 5/27/2021 APPLICANT
Applicant returned to address corrections 7/15/2021 SAM CHANG
Applicant returned to address corrections 7/21/2021 SAM CHANG
Applicant returned to address corrections 10/5/2022 SAM CHANG
Applicant returned to address corrections 11/15/2022 SAM CHANG
Plan Check Approved 11/23/2022 SAM CHANG
Issued 11/13/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 7/31/2018 STEVE MELGAR
Permit Cleared 7/31/2018 STEVE MELGAR
CPC Cleared 11/29/2018 BLAYNE SUTTON-WILLS
ZA Case Cleared 11/29/2018 BLAYNE SUTTON-WILLS
Project located in CRA area Cleared 12/14/2018 JIM URQUHART
Eng Process Fee Ord 176,300 Cleared 3/12/2019 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 3/13/2019 GEORGE SUCHAND
Driveway location Cleared 3/14/2019 MOHAMMAD HASAN
Internal circulation Cleared 3/14/2019 MOHAMMAD HASAN
Building over 3-story or 36-ft Cleared 4/1/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/1/2020 CALOSHA APPROVED
Highway dedication Cleared 7/9/2020 CELINA MORENO
Green Code Cleared 7/28/2020 KHEDER ALRAZAA
Density Bonus 12.22.A.31 Cleared 8/11/2020 JAMES MCCARTHY
DAS Clearance Cleared 9/8/2020 WAI LAU
Hold Cleared 12/23/2021 JASON SHEETS
Low Impact Development Cleared 1/24/2022 ANDRES COVARRUBIAS
Work Adjacent to Public Way Cleared 3/31/2022 JOSE RODRIGUEZ
Sewer availability Cleared 4/5/2022 CELINA MORENO
Bicycle Parking Cleared 4/21/2022 JEREMY CHOK
Encroachment in public way Cleared 4/21/2022 JEREMY CHOK
Fire Marshall Fire Life Safety Cleared 8/4/2022 WILLIAM JOHNS
Site Plan review Cleared 8/23/2022 RYAN LY
Roof/Waste drainage to street Cleared 10/19/2022 CHRISTOPHER ROCHA
Miscellaneous Cleared 10/26/2022 RYAN LY
Miscellaneous Cleared 10/26/2022 RYAN LY
Miscellaneous Cleared 10/26/2022 RYAN LY
Opn space landscape/Water mgmt Cleared 10/26/2022 RYAN LY

Contact Information

Architect Ko,, Michael Myungsoo; Lic. No.: C22356 3435 WILSHIRE BLVD #2905      LOS ANGELES, CA 90010
Contractor Pacific Construction Co; Lic. No.: 336285-B 18419 NAPA STREET #E      NORTHRIDGE, CA 91325
Engineer Lota,, Dante S; Lic. No.: S2314 19325 TRENTHAM AVE      CERRITOS, CA 90701
Engineer Pukkanasut,, Jirayus; Lic. No.: C73728 1424 ROLLING HILLS DR      FULLERTON, CA 92835

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/15/2024 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 11/25/2024 Approved DAVID BURKHEAD
Footing/Foundation/Slab 11/25/2024 Partial Approval DAVID BURKHEAD
Pre-Inspection 12/2/2024 Approved MARTIN TAVITIAN
Green Building Rough 12/4/2024 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 12/4/2024 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 12/4/2024 Partial Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 1/10/2025 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/10/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/17/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 1/17/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/17/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/24/2025 Corrections Issued LARRY ARNICK
Verify Sprinkler Sign Off 1/24/2025 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/27/2025 Partial Approval RAFAEL CORTES
Deputy Shotcrete 1/28/2025 Conditional Approval LARRY ARNICK
Insulation 1/28/2025 Partial Inspection LUIS CCAMACHO
Masonry Wall/Backfill 1/28/2025 Partial Inspection CHRISTOPHER BLACKWOOD
Pre-Inspection 1/28/2025 Partial Approval RAFAEL CORTES
Reinforced Concrete Frame 1/28/2025 Conditional Approval LARRY ARNICK
Special/Order Compliance 1/28/2025 Approved RONALD JIMENEZ
Special/Order Compliance 1/28/2025 Partial Inspection RAMAZANALI ALMASI
Structural Steel Frame 1/28/2025 Approved ALFREDO LOPEZ
Verify Sprinkler Sign Off 1/28/2025 Not Ready for Inspection LARRY ARNICK
Wall Anchors 1/28/2025 Not Ready for Inspection PAUL BAZERKANIAN
Wall Anchors 1/28/2025 Partial Inspection LARRY ARNICK
Drywall Nailing 1/29/2025 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 1/29/2025 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 3/4/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/4/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/12/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/26/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 4/1/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/1/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/8/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/8/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/5/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/5/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/23/2025 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/23/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 7/3/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/3/2025 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/15/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/16/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/8/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/8/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/16/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/16/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 11/10/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 11/10/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 12/2/2025 Conditional Approval DAVID BURKHEAD
Wood Frame 12/2/2025 Partial Approval DAVID BURKHEAD
Wood Frame 12/16/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/14/2026 Partial Approval EDWIN GREGORYONA
Wood Frame 2/4/2026 Partial Approval MARTIN TAVITIAN
Floor/Roof Diaphrgm/Shear Wall 3/4/2026 Partial Approval MARTIN TAVITIAN
Wood Frame 3/5/2026 Partial Approval MARTIN TAVITIAN
Drywall Nailing 3/9/2026 Not Ready for Inspection MARTIN TAVITIAN
Insulation 3/9/2026 Partial Approval MARTIN TAVITIAN
Deputy Wood Construction 3/16/2026 Partial Approval MARTIN TAVITIAN
Drywall Nailing 3/16/2026 Partial Approval MARTIN TAVITIAN
Insulation 3/16/2026 Partial Approval MARTIN TAVITIAN
Wood Frame 3/26/2026 Partial Approval MARTIN TAVITIAN
Drywall Nailing 4/3/2026 Partial Approval MARTIN TAVITIAN
Drywall Nailing 5/29/2026 Partial Approval MARTIN TAVITIAN
Insulation 5/29/2026 Partial Approval MARTIN TAVITIAN
Drywall Nailing 6/5/2026 No Result Entered MARTIN TAVITIAN