748 S IROLO ST 1-33 90005

Certificate Information: 748 S IROLO ST 1-33 90005

Application / Permit
18010-10000-01753
Plan Check / Job No.
B18LA07998
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW CONSTRUCTION FOR A 6-STORY MULTI-RESIDENTIAL BUILDING WITH A SUBTERRANEAN LEVEL. (5 story, 33 residential units type III-A construction over 1 story and basement parking garages type I-A construction)
Permit Issued
Issued on 10/8/2020
Issuing Office
Metro
Current Status
Issued on 10/8/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/25/2018 APPLICANT
Disabled Access Plans Picked Up 5/31/2018 APPLICANT
Assigned to Plan Check Engineer 6/7/2018 SAM CHANG
Corrections Issued 6/29/2018 SAM CHANG
Quality Review Completed 7/5/2018 SIAVOSH POURSABAHIAN
Applicant returned to address corrections 2/27/2019 SAM CHANG
Applicant returned to address corrections 1/28/2020 SAM CHANG
Applicant returned to address corrections 2/21/2020 SAM CHANG
Applicant returned to address corrections 3/13/2020 SAM CHANG
Green Plans Picked Up 9/14/2020 APPLICANT
Plan Check Approved 9/24/2020 SAM CHANG
Issued 10/8/2020 APPLICANT
Building Plans Picked Up 10/8/2020 APPLICANT
TCO Issued (Expire Date: 12-30-2025) 7/3/2025 RAFAEL ESPINOZA
TCO Issued (Expire Date: 06-28-2026) 12/30/2025 JOEY BUCHANAN

Permit Application Clearance Information

Address approval Cleared 10/5/2018 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 10/5/2018 STEVE MELGAR
Permit Cleared 10/5/2018 STEVE MELGAR
Hydrant and Access approval Cleared 11/8/2018 ROBERT DUFF
ZA Case Cleared 11/29/2018 BLAYNE SUTTON-WILLS
Project located in CRA area Cleared 3/15/2019 JIM URQUHART
Green Code Cleared 1/17/2020 SAM CHANG
Sewer availability Cleared 2/18/2020 EMIL KYUPELYAN
DAS Clearance Cleared 2/25/2020 SHINE LIN
Frnt yard landscape/Water mgmt Cleared 2/27/2020 TERRI OSBORNE
Opn space landscape/Water mgmt Cleared 2/27/2020 TERRI OSBORNE
Building over 3-story or 36-ft Cleared 4/21/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/21/2020 CALOSHA APPROVED
Highway dedication Cleared 4/21/2020 CELINA MORENO
Internal circulation Cleared 6/10/2020 PETE EYRE
Permit Cleared 6/15/2020 WALLIE JONG
Work Adjacent to Public Way Cleared 7/28/2020 ROSA SILVA
Low Impact Development Cleared 8/14/2020 JORGE MEJIA LEMUS
Fire Marshall Fire Life Safety Cleared 8/27/2020 MENOA AGHAJANI
Roof/Waste drainage to street Cleared 8/27/2020 WALLIE JONG

Contact Information

Architect Ko,, Michael Myungsoo; Lic. No.: C22356 3435 WILSHIRE BLVD #2905      LOS ANGELES, CA 90010
Contractor Chateau Operating Corp; Lic. No.: 851158-B P O BOX 660087      ARCADIA, CA 91066
Engineer Lee,, Jack C; Lic. No.: GE2153 576 E LAMBERT RD      BREA, CA 92821
Engineer Park, Juntae; Lic. No.: C65104 1444 HI POINT ST      LOS ANGELES, CA 90035
Landscape Architect Kim,, David Dong-Sik; Lic. No.: LA2831 3000 W 6TH STREET SUITE 300      LOS ANGELES, CA 90020

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 2/17/2021 Corrections Issued RAFAEL ESPINOZA
Piling/Pier/Caisson 2/19/2021 Corrections Issued RAFAEL ESPINOZA
Piling/Pier/Caisson 6/14/2021 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 7/13/2021 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 7/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 10/5/2021 Partial Approval JAMES POWERS
Pre-Inspection 11/3/2021 Approved TED RIES
Deputy Reinf. Concrete 12/3/2021 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/9/2021 Partial Approval NICK DANERI
Footing/Foundation/Slab 12/9/2021 Partial Approval NICK DANERI
Green Building Rough 12/15/2021 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 12/15/2021 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 12/15/2021 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 12/17/2021 Partial Approval NICK DANERI
Masonry Wall/Backfill 1/11/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 2/25/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/28/2022 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/1/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/13/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/14/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/15/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/15/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/19/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/20/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/21/2022 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/22/2022 Conditional Approval NICK DANERI
Pre-Inspection 4/26/2022 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 5/4/2022 Not Ready for Inspection NICK DANERI
Excavation/Setback/Form/Re-Bar 5/5/2022 Partial Approval NICK DANERI
Special/Order Compliance 5/5/2022 Partial Approval NICK DANERI
Footing/Foundation/Slab 5/12/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 5/18/2022 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 5/18/2022 Partial Approval EDWIN GREGORYONA
Wood Frame 5/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/20/2022 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 5/21/2022 Off-Hour Fees Due
Masonry Wall/Backfill 5/26/2022 Partial Approval NICK DANERI
Footing/Foundation/Slab 7/21/2022 Not Ready for Inspection NICK DANERI
Green Building Rough 7/23/2022 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 7/23/2022 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 7/23/2022 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 9/1/2022 Conditional Approval WINSTON DUNNING
Structural Steel Frame 9/7/2022 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/17/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/1/2022 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 12/29/2022 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 1/17/2023 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/19/2023 Conditional Approval GREGORY POMISH
Pre-Inspection 2/14/2023 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/24/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 3/7/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/14/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/20/2023 Partial Approval NICK DANERI
Deputy Steel/Welding 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 4/20/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/1/2023 Partial Approval NICK DANERI
Drywall Nailing 5/18/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/18/2023 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/23/2023 Partial Approval NICK DANERI
Drywall Nailing 5/25/2023 Partial Approval NICK DANERI
Drywall Nailing 5/30/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 5/30/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Not Ready for Inspection NICK DANERI
Insulation 6/16/2023 Partial Approval NICK DANERI
Insulation 6/22/2023 Partial Approval NICK DANERI
Insulation 6/27/2023 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/30/2023 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 7/3/2023 Not Ready for Inspection LARRY ARNICK
Insulation 7/10/2023 Not Ready for Inspection LARRY ARNICK
Insulation 7/12/2023 Partial Approval GREGORY POMISH
Insulation 7/13/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 7/19/2023 Partial Approval GREGORY POMISH
Insulation 7/19/2023 Partial Approval GREGORY POMISH
Drywall Nailing 7/20/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 7/26/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 7/27/2023 Partial Approval GREGORY POMISH
Drywall Nailing 7/31/2023 Partial Inspection GREGORY POMISH
Insulation 7/31/2023 Partial Approval GREGORY POMISH
Insulation 8/1/2023 Partial Inspection GREGORY POMISH
Drywall Nailing 8/11/2023 Partial Approval NICK DANERI
Drywall Nailing 8/14/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 8/23/2023 Partial Approval NICK DANERI
Insulation 8/29/2023 Partial Approval NICK DANERI
Insulation 8/31/2023 Not Ready for Inspection NICK DANERI
Insulation 9/5/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/8/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 9/13/2023 Partial Approval GREGORY POMISH
Insulation 9/18/2023 Partial Approval GREGORY POMISH
Drywall Nailing 10/6/2023 Not Ready for Inspection NICK DANERI
Wood Frame 10/6/2023 Not Ready for Inspection NICK DANERI
Drywall Nailing 10/11/2023 Partial Approval NICK DANERI
Interior/Exterior Lathing 10/23/2023 Partial Approval NICK DANERI
Pre-Inspection 10/26/2023 Partial Inspection GREGORY POMISH
Pre-Inspection 11/7/2023 Partial Inspection GREGORY POMISH
Drywall Nailing 11/13/2023 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 11/14/2023 Not Ready for Inspection EDWIN GREGORYONA
Drywall Nailing 11/22/2023 Partial Approval NICK DANERI
Insulation 12/4/2023 Partial Approval GREGORY POMISH
Insulation 12/11/2023 Partial Approval GREGORY POMISH
Insulation 12/12/2023 Not Ready for Inspection GREGORY POMISH
Insulation 12/15/2023 Not Ready for Inspection EDWIN GREGORYONA
Insulation 12/20/2023 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/2/2024 Partial Approval GREGORY POMISH
Drywall Nailing 1/5/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/8/2024 Partial Inspection GREGORY POMISH
Insulation 1/16/2024 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/23/2024 Partial Approval KATY RAMIREZ
Drywall Nailing 1/25/2024 Partial Approval GREGORY POMISH
Pre-Inspection 2/7/2024 Partial Inspection NICK DANERI
Drywall Nailing 2/16/2024 Partial Approval GREGORY POMISH
Final 2/29/2024 Partial Inspection NICK DANERI
Footing/Foundation/Slab 2/29/2024 Not Ready for Inspection NICK DANERI
Green Building Final 2/29/2024 Not Ready for Inspection NICK DANERI
Green Building Rough 2/29/2024 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/29/2024 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 2/29/2024 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 2/29/2024 SGSOV Not Ready NICK DANERI
Smoke Detectors 2/29/2024 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 2/29/2024 Not Ready for Inspection NICK DANERI
Drywall Nailing 3/4/2024 Partial Approval NICK DANERI
Pre-Inspection 3/20/2024 Partial Approval NICK DANERI
Drywall Nailing 4/11/2024 Partial Approval JEROME BLACKWOOD
Green Building Rough 5/13/2024 Not Ready for Inspection LUIS CCAMACHO
Reinforced Concrete Frame 5/13/2024 Partial Inspection LUIS CCAMACHO
Verify Sprinkler Sign Off 5/13/2024 Not Ready for Inspection LUIS CCAMACHO
Excavation/Setback/Form/Re-Bar 5/16/2024 Partial Approval NICK DANERI
Pre-Inspection 6/18/2024 Partial Inspection NICK DANERI
Pre-Inspection 7/11/2024 Partial Inspection NICK DANERI
Pre-Inspection 8/19/2024 Partial Approval NICK DANERI
Pre-Inspection 9/9/2024 Partial Approval NICK DANERI
Drywall Nailing 9/19/2024 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 9/25/2024 Partial Inspection NICK DANERI
Pre-Inspection 10/2/2024 Partial Inspection NICK DANERI
Drywall Nailing 10/9/2024 Partial Approval NICK DANERI
Special/Order Compliance 10/16/2024 Partial Inspection NICK DANERI
Pre-Inspection 11/26/2024 Partial Inspection NICK DANERI
Pre-Inspection 11/27/2024 Partial Inspection NICK DANERI
Pre-Inspection 12/12/2024 Partial Inspection NICK DANERI
Pre-Inspection 1/31/2025 Partial Inspection NICK DANERI
Final 2/6/2025 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 2/6/2025 Not Ready for Inspection NICK DANERI
Green Building Final 2/6/2025 Not Ready for Inspection NICK DANERI
Green Building Rough 2/6/2025 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/6/2025 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 2/6/2025 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 2/6/2025 SGSOV Not Ready NICK DANERI
Smoke Detectors 2/6/2025 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 2/6/2025 Not Ready for Inspection NICK DANERI
T-Bar Ceiling 3/11/2025 Not Ready for Inspection EDWIN GREGORYONA
Special/Order Compliance 3/13/2025 Partial Approval NICK DANERI
Green Building Final 4/18/2025 Approved NICK DANERI
Final 5/1/2025 Conditional Approval NICK DANERI
Footing/Foundation/Slab 5/1/2025 Approved NICK DANERI
Green Building Rough 5/1/2025 Approved NICK DANERI
Reinforced Concrete Frame 5/1/2025 Approved NICK DANERI
Reinforced Masonry Frame 5/1/2025 Approved NICK DANERI
SGSOV-Seismic Gas S/O Valve 5/1/2025 SGSOV Approved NICK DANERI
Smoke Detectors 5/1/2025 Approved NICK DANERI
Verify Sprinkler Sign Off 5/1/2025 Approved NICK DANERI
Final 5/8/2025 Partial Approval NICK DANERI
Final 5/28/2025 Partial Approval NICK DANERI
Special/Order Compliance 6/3/2025 Approved JOEY BUCHANAN
Order to Comply 7/1/2025 Not Required LARRY ARNICK
Final 7/3/2025 OK for TCO LARRY ARNICK
Special/Order Compliance 12/2/2025 Approved JOEY BUCHANAN
Special/Order Compliance 6/2/2026 Approved JOEY BUCHANAN