| Green Building Rough | 5/4/2022 | Not Ready for Inspection | KATY RAMIREZ | 
                        
                            | Reinforced Concrete Frame | 5/4/2022 | Not Ready for Inspection | KATY RAMIREZ | 
                        
                            | Verify Sprinkler Sign Off | 5/4/2022 | Not Ready for Inspection | KATY RAMIREZ | 
                        
                            | Footing/Foundation/Slab | 5/6/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 5/16/2022 | Partial Inspection | ERNESTO CORRAL | 
                        
                            | Deputy Methane Barrier | 5/17/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Reinf. Concrete | 5/20/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 5/20/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Excavation/Setback/Form/Re-Bar | 5/23/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Green Building Rough | 5/23/2022 | Approved | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 5/23/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Piling/Pier/Caisson | 5/24/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 5/25/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 5/25/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 5/27/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 5/31/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Piling/Pier/Caisson | 6/1/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 6/2/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 6/7/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Methane Barrier | 6/9/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Reinf. Concrete | 6/22/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 6/22/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 6/23/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Methane Barrier | 6/28/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 6/28/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Reinforced Concrete Frame | 6/28/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 6/29/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 6/29/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 6/29/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 6/29/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 6/30/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Reinf. Concrete | 7/1/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Reinforced Concrete Frame | 7/7/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 7/7/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/8/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 7/8/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/11/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Reinf. Concrete | 7/12/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Reinf. Concrete | 7/12/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 7/12/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Masonry Frame | 7/12/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 7/12/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/13/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Deputy Reinf. Concrete | 7/14/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Piling/Pier/Caisson | 7/14/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/15/2022 | Conditional Approval | TED RIES | 
                        
                            | Deputy Reinf. Concrete | 7/18/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Reinforced Concrete Frame | 7/18/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 7/18/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Methane Barrier | 7/19/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/19/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/19/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Footing/Foundation/Slab | 7/19/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/20/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 7/20/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 7/20/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Reinforced Masonry Frame | 7/20/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Other (see comments) | 7/21/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Reinf. Concrete | 7/21/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Footing/Foundation/Slab | 7/21/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/22/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Excavation/Setback/Form/Re-Bar | 7/22/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 7/27/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Shotcrete | 7/27/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Reinf. Concrete | 7/28/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 7/28/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 7/28/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 7/29/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 7/29/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Methane Barrier | 8/2/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Reinf. Concrete | 8/2/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Excavation/Setback/Form/Re-Bar | 8/2/2022 | Partial Approval | TED RIES | 
                        
                            | Reinforced Concrete Frame | 8/2/2022 | Partial Approval | TED RIES | 
                        
                            | Structural Steel Frame | 8/2/2022 | Not Ready for Inspection | TED RIES | 
                        
                            | Verify Sprinkler Sign Off | 8/2/2022 | Not Ready for Inspection | TED RIES | 
                        
                            | Deputy Reinf. Concrete | 8/3/2022 | Conditional Approval | TED RIES | 
                        
                            | Reinforced Masonry Frame | 8/3/2022 | Partial Approval | TED RIES | 
                        
                            | Deputy Shotcrete | 8/4/2022 | Conditional Approval | TED RIES | 
                        
                            | Deputy Shotcrete | 8/5/2022 | Conditional Approval | TED RIES | 
                        
                            | Footing/Foundation/Slab | 8/5/2022 | Not Ready for Inspection | TED RIES | 
                        
                            | Deputy Shotcrete | 8/8/2022 | Conditional Approval | TED RIES | 
                        
                            | Piling/Pier/Caisson | 8/8/2022 | Partial Approval | TED RIES | 
                        
                            | Deputy Methane Barrier | 8/9/2022 | Conditional Approval | TED RIES | 
                        
                            | Excavation/Setback/Form/Re-Bar | 8/9/2022 | Conditional Approval | TED RIES | 
                        
                            | Deputy Reinf. Concrete | 8/10/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 8/10/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 8/10/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 8/17/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 8/19/2022 | Conditional Approval | ERNESTO CORRAL | 
                        
                            | Footing/Foundation/Slab | 8/24/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 8/25/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 8/25/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 8/26/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Reinf. Concrete | 8/26/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Pre-Stress Concrete | 8/29/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 8/29/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 8/30/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 8/30/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 8/30/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 8/30/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 8/31/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 8/31/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 9/1/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Pre-Stress Concrete | 9/2/2022 | Conditional Approval | WINSTON DUNNING | 
                        
                            | Deputy Pre-Stress Concrete | 9/9/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 9/9/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 9/9/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 9/9/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 9/12/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 9/13/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 9/14/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 9/14/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 9/15/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 9/15/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 9/15/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 9/16/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 9/16/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 9/19/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 9/19/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 9/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 9/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Shotcrete | 9/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 9/23/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 9/23/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 9/29/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 9/29/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 9/30/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 10/3/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 10/3/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 10/5/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 10/5/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 10/12/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 10/12/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 10/12/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 10/12/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 10/13/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 10/13/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 10/13/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Structural Steel Frame | 10/13/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 10/14/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Shotcrete | 10/14/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Reinforced Concrete Frame | 10/17/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 10/20/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 10/20/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 10/24/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Other (see comments) | 10/28/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 10/28/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 10/28/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Reinforced Concrete Frame | 10/28/2022 | Partial Approval | JAMES POWERS | 
                        
                            | Verify Sprinkler Sign Off | 10/28/2022 | Not Ready for Inspection | JAMES POWERS | 
                        
                            | Deputy Pre-Stress Concrete | 11/2/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 11/2/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Reinforced Concrete Frame | 11/3/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/7/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 11/7/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 11/8/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 11/8/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 11/8/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 11/8/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/9/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 11/9/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 11/9/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/10/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 11/10/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 11/15/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 11/15/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 11/16/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 11/16/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 11/16/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/17/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 11/17/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/18/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 11/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 11/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 11/22/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 11/22/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/23/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Shotcrete | 11/23/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 11/23/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 11/23/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 11/28/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 11/30/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 11/30/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/5/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 12/5/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 12/5/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Methane Barrier | 12/7/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/7/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/7/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 12/7/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 12/7/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/8/2022 | Conditional Approval | KATY RAMIREZ | 
                        
                            | Reinforced Masonry Frame | 12/8/2022 | Partial Approval | KATY RAMIREZ | 
                        
                            | Deputy Pre-Stress Concrete | 12/9/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 12/9/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Reinforced Concrete Frame | 12/9/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 12/9/2022 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/12/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/13/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/14/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/15/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 12/15/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 12/15/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 12/15/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/16/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/16/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/19/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 12/19/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 12/19/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/20/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/20/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/21/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/22/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/22/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/23/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/23/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Reinforced Concrete Frame | 12/23/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/27/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/27/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 12/28/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/28/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/28/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 12/29/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 12/29/2022 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 12/29/2022 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 12/29/2022 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Pre-Stress Concrete | 12/30/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/30/2022 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Pre-Stress Concrete | 1/3/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/3/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/4/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/4/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/5/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Steel/Welding | 1/5/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Footing/Foundation/Slab | 1/5/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Reinf. Concrete | 1/6/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Deputy Steel/Welding | 1/6/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Drywall Nailing | 1/6/2023 | Partial Approval | GREGORY POMISH | 
                        
                            | Light Gage Steel Frame | 1/6/2023 | Partial Approval | GREGORY POMISH | 
                        
                            | Deputy Reinf. Concrete | 1/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/11/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/11/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 1/12/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 1/12/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 1/12/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 1/12/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 1/13/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/13/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/17/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/17/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 1/17/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/18/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/18/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 1/18/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/19/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 1/19/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 1/19/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 1/19/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 1/19/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 1/20/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/20/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 1/20/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/23/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 1/23/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 1/23/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Concrete Frame | 1/23/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 1/23/2023 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 1/24/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/24/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/25/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/25/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 1/25/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/26/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 1/26/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 1/26/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 1/26/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 1/27/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 1/27/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 1/27/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 1/27/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Footing/Foundation/Slab | 1/27/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 1/27/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Concrete | 1/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 1/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Concrete | 1/31/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/31/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 1/31/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/1/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/2/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 2/2/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 2/3/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 2/3/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Drilled-In Anchors | 2/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 2/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/9/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 2/9/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 2/9/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 2/10/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 2/10/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 2/10/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 2/10/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 2/10/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 2/13/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 2/13/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 2/13/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 2/14/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 2/14/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/15/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 2/15/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 2/16/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/17/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 2/17/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 2/17/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 2/21/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 2/23/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Steel/Welding | 2/23/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Wood Construction | 2/23/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 2/23/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Reinf. Masonry | 2/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 2/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 3/2/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/2/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 3/2/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 3/2/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 3/2/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 3/3/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/3/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 3/3/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/3/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 3/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 3/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/7/2023 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 3/7/2023 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 3/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 3/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 3/9/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/9/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 3/9/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 3/9/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 3/9/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/13/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/13/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Masonry Frame | 3/13/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Verify Sprinkler Sign Off | 3/13/2023 | Partial Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/14/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/14/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 3/15/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/16/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/17/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Drywall Nailing | 3/17/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Reinf. Masonry | 3/20/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Deputy Steel/Welding | 3/20/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Deputy Wood Construction | 3/20/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/20/2023 | Partial Approval | GREGORY POMISH | 
                        
                            | Deputy Reinf. Masonry | 3/21/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/21/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 3/21/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 3/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 3/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 3/23/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/23/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 3/23/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 3/24/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Deputy Steel/Welding | 3/24/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Deputy Wood Construction | 3/24/2023 | Conditional Approval | GREGORY POMISH | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/24/2023 | Partial Inspection | GREGORY POMISH | 
                        
                            | Deputy Reinf. Masonry | 3/28/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Steel/Welding | 3/28/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Wood Construction | 3/28/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 3/28/2023 | Partial Approval | EDWIN GREGORYONA | 
                        
                            | Deputy Reinf. Masonry | 4/3/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/3/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 4/3/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 4/3/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 4/4/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/4/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 4/4/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Masonry Wall/Backfill | 4/4/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 4/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 4/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 4/7/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 4/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 4/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 4/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 4/11/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/11/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 4/11/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 4/11/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 4/11/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 4/11/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Masonry Frame | 4/11/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 4/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 4/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 4/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 4/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 4/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 4/18/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/18/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 4/18/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/19/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 4/19/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/20/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Reinforced Masonry Frame | 4/20/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Drilled-In Anchors | 4/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 4/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 4/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 4/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 4/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 4/26/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 4/26/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 4/26/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 4/26/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 4/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 4/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 4/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 4/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 4/28/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 4/28/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 4/28/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 4/28/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 4/28/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Reinf. Masonry | 5/1/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/1/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 5/1/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/2/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 5/2/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 5/2/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/3/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 5/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 5/4/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Insulation | 5/4/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 5/5/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/5/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 5/5/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 5/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 5/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 5/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 5/8/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 5/8/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 5/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 5/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 5/10/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/11/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/12/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 5/15/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/15/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/16/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/16/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 5/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 5/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 5/17/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 5/18/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/18/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/19/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/19/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Drywall Nailing | 5/19/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 5/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/22/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 5/24/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/24/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 5/24/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 5/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 5/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 5/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 5/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 5/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 5/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 5/31/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 5/31/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 5/31/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 5/31/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 6/1/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 6/1/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/1/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 6/1/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 6/2/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/2/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Wood Frame | 6/2/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 6/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 6/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 6/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/5/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 6/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 6/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/6/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 6/7/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 6/7/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 6/7/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Reinf. Masonry | 6/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 6/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Wood Construction | 6/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 6/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/12/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/13/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 6/13/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/14/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 6/15/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/15/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 6/16/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/16/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Wood Frame | 6/16/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 6/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/21/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/22/2023 | Conditional Approval | KATY RAMIREZ | 
                        
                            | Deputy Wood Construction | 6/22/2023 | Conditional Approval | KATY RAMIREZ | 
                        
                            | Wood Frame | 6/22/2023 | Partial Approval | KATY RAMIREZ | 
                        
                            | Deputy Steel/Welding | 6/23/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Wood Construction | 6/23/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/23/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Insulation | 6/23/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 6/26/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Wood Frame | 6/26/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 6/27/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 6/28/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 6/29/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 6/29/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 6/30/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Wood Frame | 6/30/2023 | Corrections Issued | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 7/3/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/3/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/3/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/6/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/7/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Wood Frame | 7/7/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 7/10/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/10/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/11/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/11/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Wood Frame | 7/12/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/13/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/14/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/17/2023 | Conditional Approval | DARRYL ARNOLD | 
                        
                            | Wood Frame | 7/17/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/18/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/18/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/19/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/19/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/20/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Wood Frame | 7/20/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/21/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 7/26/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 7/26/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/2/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 8/2/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/3/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/7/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/9/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/10/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/11/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 8/11/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/15/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/16/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/18/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Wood Construction | 8/18/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 8/18/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/22/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/23/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/24/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 8/25/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/28/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 8/28/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/29/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 8/29/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Shotcrete | 8/30/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/30/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 8/31/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/1/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 9/6/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/7/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 9/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/8/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 9/8/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 9/11/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/11/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 9/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 9/13/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/13/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 9/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 9/15/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/15/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 9/15/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Insulation | 9/15/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/18/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/19/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/20/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 9/21/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Concrete | 9/22/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/22/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 9/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/26/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 9/26/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 9/27/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/27/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 9/28/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 9/28/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 9/29/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 9/29/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Insulation | 9/29/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Light Gage Steel Frame | 9/29/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 10/2/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 10/2/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 10/2/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/3/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/4/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/5/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 10/5/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/6/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Pre-Inspection | 10/6/2023 | Partial Inspection | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/10/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/10/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/10/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/11/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/11/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/12/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 10/12/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Reinf. Masonry | 10/13/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/13/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/13/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/16/2023 | Conditional Approval | RICARDO ROBLES | 
                        
                            | Drywall Nailing | 10/16/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Drilled-In Anchors | 10/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/18/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Insulation | 10/18/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 10/19/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Drilled-In Anchors | 10/20/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/20/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 10/20/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/23/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 10/23/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Drilled-In Anchors | 10/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/25/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Insulation | 10/25/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/26/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 10/26/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/27/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/27/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 10/30/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 10/31/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 10/31/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/2/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/3/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/3/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/6/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/6/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Insulation | 11/6/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/7/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/7/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/8/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 11/9/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 11/13/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/13/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/14/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Insulation | 11/14/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/15/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Structural Steel Frame | 11/15/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/17/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 11/17/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/20/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 11/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/21/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/28/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 11/28/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Interior/Exterior Lathing | 11/28/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/29/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 11/29/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 11/30/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 11/30/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Interior/Exterior Lathing | 12/1/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 12/4/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Interior/Exterior Lathing | 12/4/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 12/5/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 12/7/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 12/12/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/14/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 12/14/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 12/15/2023 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 12/18/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 12/18/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 12/20/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 12/20/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 12/21/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 12/21/2023 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 12/22/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Insulation | 12/22/2023 | Not Ready for Inspection | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 12/26/2023 | Conditional Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 12/26/2023 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 12/29/2023 | Conditional Approval | RAFAEL ESPINOZA | 
                        
                            | Drywall Nailing | 12/29/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Interior/Exterior Lathing | 12/29/2023 | Partial Approval | RAFAEL ESPINOZA | 
                        
                            | Deputy Steel/Welding | 1/2/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 1/2/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 1/5/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/8/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/9/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 1/10/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Interior/Exterior Lathing | 1/10/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 1/11/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/12/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/16/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/17/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 1/18/2024 | No Access for Inspection | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/18/2024 | No Access for Inspection | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 1/19/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 1/19/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 1/19/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 1/22/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/23/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Drilled-In Anchors | 1/26/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/26/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 1/30/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/1/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 2/1/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 2/2/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/6/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 2/9/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 2/12/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/13/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/14/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 2/20/2024 | Conditional Approval | NICK DANERI | 
                        
                            | Deputy Steel/Welding | 2/21/2024 | Conditional Approval | NICK DANERI | 
                        
                            | Light Gage Steel Frame | 2/21/2024 | Partial Approval | NICK DANERI | 
                        
                            | Deputy Drilled-In Anchors | 2/27/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 2/27/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Insulation | 2/27/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 3/4/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 3/4/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 3/7/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 3/11/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/12/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 3/12/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 3/13/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/14/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/15/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/18/2024 | No Access for Inspection | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/19/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 3/19/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 3/21/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Deputy Steel/Welding | 3/26/2024 | Conditional Approval | MICHAEL ROSENBERG | 
                        
                            | Drywall Nailing | 3/26/2024 | Partial Approval | RONALD JIMENEZ | 
                        
                            | Deputy Steel/Welding | 3/28/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 3/28/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 3/28/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/2/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/4/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Pre-Inspection | 4/4/2024 | Approved | LARRY ARNICK | 
                        
                            | Deputy Steel/Welding | 4/8/2024 | Conditional Approval | RAMAZANALI ALMASI | 
                        
                            | Light Gage Steel Frame | 4/8/2024 | Not Ready for Inspection | RAMAZANALI ALMASI | 
                        
                            | Deputy Steel/Welding | 4/29/2024 | Conditional Approval | JEFFREY FULTON | 
                        
                            | Drywall Nailing | 4/29/2024 | Partial Inspection | JEFFREY FULTON | 
                        
                            | Footing/Foundation/Slab | 4/29/2024 | Partial Inspection | JEFFREY FULTON | 
                        
                            | Light Gage Steel Frame | 4/29/2024 | Partial Inspection | JEFFREY FULTON | 
                        
                            | Deputy Drilled-In Anchors | 5/2/2024 | Conditional Approval | JEFFREY FULTON | 
                        
                            | Light Gage Steel Frame | 5/8/2024 | Not Ready for Inspection | JEFFREY FULTON | 
                        
                            | Reinforced Concrete Frame | 5/8/2024 | Not Ready for Inspection | JEFFREY FULTON | 
                        
                            | Verify Sprinkler Sign Off | 5/8/2024 | Not Ready for Inspection | JEFFREY FULTON | 
                        
                            | Deputy Steel/Welding | 5/13/2024 | Conditional Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 5/13/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Drywall Nailing | 5/17/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 5/17/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 5/17/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Drywall Nailing | 5/21/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 5/29/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 5/29/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 5/29/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Masonry Wall/Backfill | 5/31/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Reinforced Masonry Frame | 5/31/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 6/4/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 6/7/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 6/14/2024 | Partial Inspection | JEFFREY FULTON | 
                        
                            | Verify Sprinkler Sign Off | 6/14/2024 | Not Ready for Inspection | JEFFREY FULTON | 
                        
                            | Footing/Foundation/Slab | 6/17/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Drywall Nailing | 6/21/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 6/21/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 6/25/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 6/25/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 6/26/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 6/27/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Interior/Exterior Lathing | 7/1/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 7/8/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 7/8/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 7/12/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 7/12/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 7/19/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 7/19/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 7/31/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 8/16/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 9/27/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Final | 11/19/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Footing/Foundation/Slab | 11/19/2024 | Approved | LARRY ARNICK | 
                        
                            | Green Building Final | 11/19/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 11/19/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Masonry Frame | 11/19/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | SGSOV-Seismic Gas S/O Valve | 11/19/2024 | SGSOV Not Ready | LARRY ARNICK | 
                        
                            | Smoke Detectors | 11/19/2024 | Approved | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 11/19/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Pre-Inspection | 11/20/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 11/21/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Wall Anchors | 11/21/2024 | Approved | LARRY ARNICK | 
                        
                            | Pre-Inspection | 11/22/2024 | Partial Approval | LARRY ARNICK | 
                        
                            | Final | 11/26/2024 | Partial Inspection | LARRY ARNICK | 
                        
                            | Green Building Final | 11/26/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 11/26/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Masonry Frame | 11/26/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | SGSOV-Seismic Gas S/O Valve | 11/26/2024 | SGSOV Not Ready | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 11/26/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Light Gage Steel Frame | 11/27/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Structural Steel Frame | 11/27/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Pre-Inspection | 12/2/2024 | Partial Inspection | LARRY ARNICK | 
                        
                            | Final | 12/3/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Green Building Final | 12/3/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 12/3/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Masonry Frame | 12/3/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | SGSOV-Seismic Gas S/O Valve | 12/3/2024 | SGSOV Not Ready | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 12/3/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Wall Anchors | 12/3/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 12/4/2024 | Approved | LARRY ARNICK | 
                        
                            | Drywall Nailing | 12/5/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Final | 12/10/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Green Building Final | 12/10/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 12/10/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Masonry Frame | 12/10/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | SGSOV-Seismic Gas S/O Valve | 12/10/2024 | SGSOV Not Ready | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 12/10/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Floor/Roof Diaphrgm/Shear Wall | 12/11/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Drywall Nailing | 12/12/2024 | Approved | LARRY ARNICK | 
                        
                            | Final | 12/17/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Green Building Final | 12/17/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Reinforced Concrete Frame | 12/17/2024 | Approved | LARRY ARNICK | 
                        
                            | Reinforced Masonry Frame | 12/17/2024 | Approved | LARRY ARNICK | 
                        
                            | SGSOV-Seismic Gas S/O Valve | 12/17/2024 | SGSOV Approved | LARRY ARNICK | 
                        
                            | T-Bar Ceiling | 12/17/2024 | Approved | LARRY ARNICK | 
                        
                            | Verify Sprinkler Sign Off | 12/17/2024 | Approved | LARRY ARNICK | 
                        
                            | T-Bar Ceiling | 12/18/2024 | Not Ready for Inspection | LARRY ARNICK | 
                        
                            | Wall Anchors | 12/19/2024 | Approved | LARRY ARNICK | 
                        
                            | Final | 12/20/2024 | OK for TCO | LARRY ARNICK | 
                        
                            | Green Building Final | 12/20/2024 | Approved | LARRY ARNICK | 
                        
                            | Special/Order Compliance | 5/28/2025 | Partial Inspection | LARRY ARNICK | 
                        
                            | Pre-Inspection | 7/2/2025 | Approved | LARRY ARNICK | 
                        
                            | Final | 9/8/2025 | Conditional Approval | LARRY ARNICK |