Pre-Inspection
|
10/28/2020
|
Approved
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
2/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
2/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
3/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
3/26/2021
|
Approved
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
4/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
4/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
4/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
4/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
4/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
4/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
4/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
4/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
4/30/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Methane Barrier
|
5/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
5/12/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
5/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
5/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
5/18/2021
|
Partial Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
5/18/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/19/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/20/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
5/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
5/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
5/25/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
5/25/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
5/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
6/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
6/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
6/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
6/11/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
6/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
6/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
6/21/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
6/21/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/21/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/21/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
6/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
6/24/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/24/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/28/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
6/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/1/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
7/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/7/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
7/7/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/7/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
7/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
7/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/9/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Other (see comments)
|
7/12/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
7/12/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Shotcrete
|
7/12/2021
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
7/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
7/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/15/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
7/16/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
7/22/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
7/22/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/22/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
7/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
7/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
7/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/23/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/23/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Green Building Rough
|
7/30/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
7/30/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
7/30/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
7/30/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/2/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/5/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
8/5/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
8/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
8/5/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
8/11/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
8/16/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
8/24/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
9/7/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Barrier
|
9/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Subgrade
|
9/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
9/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
9/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Subgrade
|
9/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/28/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
9/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
9/29/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/1/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/5/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
10/6/2021
|
Approved
|
JAMES POWERS
|
|
METHANE-Rough
|
10/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/6/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/7/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/8/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/13/2021
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
10/13/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
10/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
10/15/2021
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/22/2021
|
Partial Approval
|
RUSSELL BONVOULOIR
|
|
METHANE-Barrier
|
10/22/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
METHANE-Subgrade
|
10/22/2021
|
Partial Inspection
|
RUSSELL BONVOULOIR
|
|
METHANE-Rough
|
10/26/2021
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
10/26/2021
|
Partial Approval
|
MARK FERRARI
|
|
Verify Sprinkler Sign Off
|
10/26/2021
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Footing/Foundation/Slab
|
11/19/2021
|
Partial Inspection
|
TED RIES
|
|
METHANE-Barrier
|
11/19/2021
|
Not Ready for Inspection
|
TED RIES
|
|
METHANE-Subgrade
|
11/19/2021
|
Not Ready for Inspection
|
TED RIES
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2021
|
Partial Inspection
|
TED RIES
|
|
METHANE-Rough
|
11/23/2021
|
Partial Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
11/23/2021
|
Partial Approval
|
TED RIES
|
|
Verify Sprinkler Sign Off
|
11/23/2021
|
Not Ready for Inspection
|
TED RIES
|
|
Deputy Reinf. Concrete
|
11/24/2021
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
12/1/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/3/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
12/6/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Rough
|
12/9/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/9/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/9/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/10/2021
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/17/2021
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
2/23/2022
|
Approved
|
JAMES POWERS
|
|
METHANE-Subgrade
|
2/23/2022
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
METHANE-Rough
|
2/25/2022
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
2/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/25/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
3/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
3/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
4/1/2022
|
Not Ready for Inspection
|
TED RIES
|
|
Structural Steel Frame
|
4/4/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/5/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
4/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
4/19/2022
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
4/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/10/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/19/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
5/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
5/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/27/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/15/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/15/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
6/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
6/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Masonry
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
6/22/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
6/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
6/29/2022
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
6/29/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
6/30/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
7/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
8/24/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
8/31/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/31/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
9/9/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/15/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/13/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
10/13/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
10/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/26/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
10/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/1/2022
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
11/17/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
11/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
11/23/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
11/29/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/1/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/2/2022
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/7/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/8/2022
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
12/12/2022
|
Approved
|
ALAN MORELOS
|
|
Wood Frame
|
12/12/2022
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/13/2022
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
12/15/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
12/16/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/20/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Wood Frame
|
12/20/2022
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
12/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
12/28/2022
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/4/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/10/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/13/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
1/18/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/18/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/20/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
1/25/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
1/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
2/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/2/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/3/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
2/8/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
2/10/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
2/14/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
2/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
2/16/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
2/21/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
2/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
2/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
2/28/2023
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
3/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
3/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
3/14/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
3/16/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
3/29/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
4/7/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
4/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/18/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
4/19/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
4/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
4/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
4/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/2/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/3/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/9/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
5/12/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/16/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
5/25/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
5/31/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
6/5/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
6/6/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/21/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/22/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Light Gage Steel Frame
|
6/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
6/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
6/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
6/30/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
7/5/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/11/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
7/12/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
7/14/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/18/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/25/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
7/26/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/27/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
8/8/2023
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
8/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Insulation
|
8/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
8/23/2023
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
8/24/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
8/29/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Drywall Nailing
|
9/8/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/12/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/13/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/19/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/20/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/21/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/28/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
9/29/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
10/11/2023
|
Partial Approval
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
10/12/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Interior/Exterior Lathing
|
10/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
10/30/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
11/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Final
|
11/1/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/1/2023
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
11/1/2023
|
SGSOV Not Ready
|
JAMES POWERS
|
|
Smoke Detectors
|
11/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
11/14/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/15/2023
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
11/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
11/17/2023
|
SGSOV Not Ready
|
JAMES POWERS
|
|
Smoke Detectors
|
11/17/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/17/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
11/28/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
11/28/2023
|
SGSOV Not Ready
|
JAMES POWERS
|
|
Smoke Detectors
|
11/28/2023
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
11/28/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Special/Order Compliance
|
11/29/2023
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
12/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
12/1/2023
|
SGSOV Not Ready
|
JAMES POWERS
|
|
Smoke Detectors
|
12/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/1/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
12/22/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
12/22/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/22/2023
|
Partial Approval
|
JAMES POWERS
|
|
SGSOV-Seismic Gas S/O Valve
|
12/22/2023
|
SGSOV Approved
|
JAMES POWERS
|
|
Smoke Detectors
|
12/22/2023
|
Approved
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
12/22/2023
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
12/28/2023
|
OK for TCO
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
12/28/2023
|
Approved
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
12/28/2023
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
12/28/2023
|
Approved
|
ERNESTO CORRAL
|
|
Verify Sprinkler Sign Off
|
12/28/2023
|
Approved
|
JAMES POWERS
|
|
Special/Order Compliance
|
12/31/2023
|
Off-Hour Fees Due
|
|
|
Special/Order Compliance
|
5/29/2024
|
Partial Approval
|
JAMES POWERS
|
|
Special/Order Compliance
|
10/29/2024
|
Approved
|
JAMES POWERS
|
|
Final
|
11/25/2024
|
OK for TCO
|
JAMES POWERS
|
|
Final
|
12/4/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Wood Construction
|
12/6/2024
|
Partial Approval
|
JAMES POWERS
|
|
Final
|
12/6/2024
|
OK to Issue CofO
|
JAMES POWERS
|