9131 N DARBY AVE 1-146 91325

Certificate Information: 9131 N DARBY AVE 1-146 91325

Application / Permit
18010-10000-01024
Plan Check / Job No.
B18LA04390
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PROPOSED 5 STORY MIXED USE- RESTAURANT (CORE AND SHELL- TI ON SEPARATE PERMIT) AND APARTMENTS OVER PARKING STAIRS AND RAILS ARE DEFERRED
Permit Issued
Issued on 8/22/2018
Issuing Office
Valley
Current Status
CofO Issued on 7/1/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/8/2018 APPLICANT
Assigned to Plan Check Engineer 3/29/2018 JOHN VASQUEZ
Corrections Issued 4/11/2018 JOHN VASQUEZ
Building Plans Picked Up 4/12/2018 APPLICANT
Quality Review Completed 4/18/2018 CHARLES CHANG
Applicant returned to address corrections 6/5/2018 JOHN VASQUEZ
Applicant returned to address corrections 7/2/2018 JOHN VASQUEZ
Applicant returned to address corrections 7/9/2018 JOHN VASQUEZ
Applicant returned to address corrections 7/27/2018 JOHN VASQUEZ
Applicant returned to address corrections 8/2/2018 JOHN VASQUEZ
Plan Check Approved 8/15/2018 JOHN VASQUEZ
Issued 8/22/2018 LADBS
TCO Issued (Expire Date: 04-13-2021) 10/15/2020 JEFFREY DURAN
TCO Issued (Expire Date: 10-11-2021) 4/14/2021 RICKEY JACKSON
CofO in Progress 6/17/2021 DANNY RODRIGUEZ
Permit Finaled 7/1/2021 RICKEY JACKSON
CofO Issued 7/1/2021 RICKEY JACKSON
Permit Finaled 7/1/2021 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 4/13/2018 CUC NGUYEN
Highway dedication Cleared 5/17/2018 EDUARDO PEDROZA
Sewer availability Cleared 5/18/2018 NAZILA NOORIFAR
Hydrant and Access approval Cleared 5/22/2018 JOHN DALLAS
Eng Process Fee Ord 176,300 Cleared 5/23/2018 NAZILA NOORIFAR
Encroachment in public way Cleared 6/20/2018 KENNETH PHAM
Work Adjacent to Public Way Cleared 6/29/2018 HOK CHI CHIU
Low Impact Development Cleared 7/27/2018 SAM NAVID
Roof/Waste drainage to street Cleared 7/27/2018 CARLA VALLADARES
Stormwater Pollution Mitigatn Cleared 7/27/2018 SAM NAVID
Food Service Establishment Cleared 7/30/2018 KENNETH BROWNE
Driveway location Cleared 8/2/2018 KEN AITCHISON
Internal circulation Cleared 8/2/2018 KEN AITCHISON
Bicycle Parking Cleared 8/3/2018 FATIMA GUERRA
DAS Clearance Cleared 8/3/2018 JOHN VASQUEZ
Green Code Cleared 8/3/2018 DONALD CRICHLOW
Permit Cleared 8/6/2018 EDUARDO PEDROZA
Density Bonus 12.22.A.25 Cleared 8/9/2018 JAMES MCCARTHY
DCP conditions approval Cleared 8/13/2018 JAMES MCCARTHY
Fire Marshall Fire Life Safety Cleared 8/13/2018 DOMINIQUE MEDINA
"Q" conditions Cleared 8/14/2018 IVORY CHAMBESHI
"T" removal Cleared 8/14/2018 IVORY CHAMBESHI
CPC Cleared 8/14/2018 IVORY CHAMBESHI
Frnt yard landscape/Water mgmt Cleared 8/14/2018 IVORY CHAMBESHI
Opn space landscape/Water mgmt Cleared 8/14/2018 IVORY CHAMBESHI
Site Plan review Cleared 8/14/2018 IVORY CHAMBESHI
Building over 3-story or 36-ft Cleared 8/15/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/15/2018 CALOSHA APPROVED

Contact Information

Architect Empakeris, Donatas Eduard; Lic. No.: C13779 1535 6TH STREET SUITE 101   DE ARCHITECTS    SANTA MONICA, CA 90401
Contractor Frymer Development Inc; Lic. No.: 860661-B 2461 SANTA MONICA BLVD 134      SANTA MONICA, CA 90404
Engineer Labib, Youhanna T; Lic. No.: S4549 209 E EL SEGUNDO BLVD      EL SEGUNDO, CA 90245
Engineer Larocca, Francis Joseph; Lic. No.: C75121 1821 PACIFIC COAST HWY 38      HERMOSA BEACH, CA 90254

Inspector Information

GREGORY POMISH, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI
EDWIN GREGORYONA, (818) 374-3303 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 8/27/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 9/5/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 9/5/2018 Not Ready for Inspection ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/11/2018 Partial Approval ROBERT COLE
Footing/Foundation/Slab 9/11/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 9/12/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/12/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 9/19/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 9/21/2018 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/24/2018 Conditional Approval ROBERT COLE
Deputy Shotcrete 10/4/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 10/4/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 10/9/2018 Conditional Approval CAMERON CHABAN
Deputy Shotcrete 10/9/2018 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/9/2018 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/10/2018 Conditional Approval ROBERT COLE
Deputy Shotcrete 10/10/2018 Conditional Approval ROBERT COLE
Green Building Rough 10/10/2018 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 10/10/2018 Not Ready for Inspection ROBERT COLE
Deputy Shotcrete 10/11/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 10/11/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 10/12/2018 Conditional Approval ROBERT COLE
Deputy Shotcrete 10/12/2018 Conditional Approval ROBERT COLE
Deputy Shotcrete 10/16/2018 Conditional Approval ROBERT COLE
Deputy Shotcrete 10/17/2018 Conditional Approval ROBERT COLE
Green Building Rough 10/17/2018 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 10/17/2018 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 10/17/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 10/18/2018 Conditional Approval ROBERT COLE
Deputy Shotcrete 10/18/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 10/19/2018 Conditional Approval JAMES STEPHENS
Deputy Shotcrete 10/19/2018 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 10/23/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 10/23/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 10/25/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 10/25/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 10/26/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 10/26/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 10/26/2018 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 10/29/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 10/30/2018 Conditional Approval ROBERT COLE
Reinforced Masonry Frame 10/30/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 10/31/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 10/31/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 10/31/2018 Partial Approval ROBERT COLE
Reinforced Masonry Frame 10/31/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 11/1/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 11/1/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 11/2/2018 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 11/5/2018 Conditional Approval ROBERT COLE
Reinforced Masonry Frame 11/5/2018 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 11/6/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 11/7/2018 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 11/7/2018 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 11/8/2018 Conditional Approval ROBERT COLE
Reinforced Masonry Frame 11/8/2018 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 11/9/2018 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 11/20/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 11/20/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 11/27/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 11/27/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 11/28/2018 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 12/7/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 12/11/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 12/18/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 12/19/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 12/19/2018 Partial Approval JAMES STEPHENS
Footing/Foundation/Slab 12/20/2018 Off-Hour Fees Due
Green Building Rough 12/20/2018 Not Ready for Inspection ROBERT COLE
Green Building Rough 12/20/2018 Off-Hour Fees Due
Reinforced Concrete Frame 12/20/2018 Off-Hour Fees Due
Verify Sprinkler Sign Off 12/20/2018 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 12/20/2018 Off-Hour Fees Due
Footing/Foundation/Slab 12/21/2018 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 12/24/2018 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 12/24/2018 Partial Approval ROBERT COLE
Footing/Foundation/Slab 2/4/2019 Partial Inspection ROBERT COLE
Green Building Rough 2/5/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 2/5/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 2/5/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 2/6/2019 Conditional Approval ROBERT COLE
Reinforced Concrete Frame 2/6/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 2/7/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 2/13/2019 Conditional Approval ROBERT COLE
Excavation/Setback/Form/Re-Bar 2/13/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 2/21/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 2/21/2019 Partial Inspection ROBERT COLE
Deputy Reinf. Concrete 2/22/2019 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/22/2019 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/25/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 2/26/2019 Conditional Approval ROBERT COLE
Deputy Shotcrete 2/27/2019 Conditional Approval ROBERT COLE
Green Building Rough 2/27/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 2/27/2019 Partial Inspection ROBERT COLE
Verify Sprinkler Sign Off 2/27/2019 Not Ready for Inspection ROBERT COLE
Excavation/Setback/Form/Re-Bar 2/28/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 3/1/2019 Conditional Approval ROBERT COLE
Deputy Shotcrete 3/1/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 3/4/2019 Conditional Approval ROBERT COLE
Deputy Shotcrete 3/4/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 3/4/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 3/5/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 3/5/2019 Conditional Approval ROBERT COLE
Reinforced Masonry Frame 3/5/2019 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 3/8/2019 Approved DANNY RODRIGUEZ
Deputy Shotcrete 3/8/2019 Approved DANNY RODRIGUEZ
Green Building Rough 3/8/2019 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 3/8/2019 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 3/8/2019 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 3/8/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 3/12/2019 Conditional Approval ROBERT COLE
Reinforced Masonry Frame 3/12/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 3/13/2019 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 3/15/2019 Partial Approval ROBERT COLE
Deputy Reinf. Concrete 4/2/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 4/4/2019 Conditional Approval ROBERT COLE
Green Building Rough 4/4/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 4/4/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 4/8/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 4/12/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 4/16/2019 Conditional Approval ROBERT COLE
Deputy Wood Construction 4/16/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 4/16/2019 Partial Inspection ROBERT COLE
Deputy Reinf. Concrete 4/17/2019 Conditional Approval ROBERT COLE
Deputy Wood Construction 4/17/2019 Conditional Approval ROBERT COLE
Green Building Rough 4/17/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 4/17/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 4/17/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 4/18/2019 Conditional Approval ROBERT COLE
Deputy Drilled-In Anchors 4/23/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 4/23/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 4/30/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 4/30/2019 Partial Inspection ROBERT COLE
Green Building Rough 5/1/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 5/1/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 5/1/2019 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Concrete 5/2/2019 Conditional Approval ROBERT COLE
Green Building Rough 5/7/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 5/7/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 5/7/2019 Partial Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 5/9/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 5/14/2019 Partial Approval ROBERT COLE
Green Building Rough 5/15/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 5/15/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 5/15/2019 Partial Approval ROBERT COLE
Green Building Rough 5/22/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 5/22/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 5/22/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 5/28/2019 Partial Inspection ROBERT COLE
Green Building Rough 5/30/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 5/30/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 5/30/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 6/3/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 6/3/2019 Partial Approval ROBERT COLE
Green Building Rough 6/6/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/6/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 6/6/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 6/10/2019 Partial Inspection ROBERT COLE
Green Building Rough 6/11/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/11/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 6/11/2019 Partial Approval ROBERT COLE
Green Building Rough 6/13/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/13/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 6/13/2019 Partial Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 6/17/2019 Partial Approval ROBERT COLE
Green Building Rough 6/18/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/18/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 6/18/2019 Conditional Approval ROBERT COLE
Deputy Wood Construction 6/20/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 6/20/2019 Partial Approval ROBERT COLE
Green Building Rough 6/25/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 6/25/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 6/25/2019 Partial Inspection ROBERT COLE
Green Building Rough 7/1/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/1/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 7/1/2019 Partial Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 7/2/2019 Partial Approval ROBERT COLE
Deputy Wood Construction 7/3/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 7/3/2019 Order to Comply Issued ROBERT COLE
Deputy Drilled-In Anchors 7/10/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 7/10/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 7/11/2019 Conditional Approval ROBERT COLE
Green Building Rough 7/11/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/11/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 7/11/2019 Partial Approval ROBERT COLE
Deputy Wood Construction 7/15/2019 Conditional Approval ROBERT COLE
Green Building Rough 7/15/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 7/15/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 7/15/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 7/15/2019 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 7/16/2019 Conditional Approval ROBERT COLE
Deputy Reinf. Concrete 7/16/2019 Conditional Approval ROBERT COLE
Deputy Wood Construction 7/16/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 7/17/2019 Partial Approval JAMES STEPHENS
Deputy Wood Construction 7/18/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 7/18/2019 Partial Approval ROBERT COLE
Deputy Shotcrete 7/22/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 7/22/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 7/23/2019 Conditional Approval ROBERT COLE
Green Building Rough 7/23/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/23/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 7/23/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 7/24/2019 Conditional Approval ROBERT COLE
Structural Steel Frame 7/24/2019 Corrections Issued ROBERT COLE
Deputy Reinf. Concrete 7/25/2019 Conditional Approval ROBERT COLE
Deputy Steel/Welding 7/25/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 7/25/2019 Partial Inspection ROBERT COLE
Deputy Steel/Welding 7/26/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/31/2019 Conditional Approval ROBERT COLE
Green Building Rough 7/31/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/31/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 7/31/2019 Partial Approval ROBERT COLE
Deputy Steel/Welding 8/1/2019 Conditional Approval ROBERT COLE
Green Building Rough 8/5/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 8/5/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 8/5/2019 Partial Approval ROBERT COLE
Light Gage Steel Frame 8/9/2019 Partial Inspection DANNY RODRIGUEZ
Green Building Rough 8/13/2019 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 8/13/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 8/13/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 8/13/2019 Partial Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 8/14/2019 Partial Approval ROBERT COLE
Green Building Rough 8/20/2019 Not Ready for Inspection ROBERT COLE
Reinforced Concrete Frame 8/20/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 8/20/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 8/20/2019 Partial Approval ROBERT COLE
Drywall Nailing 8/23/2019 Partial Approval JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 8/26/2019 Partial Approval ROBERT COLE
Drywall Nailing 8/28/2019 No Access for Inspection ROBERT COLE
Deputy Wood Construction 8/29/2019 Conditional Approval ROBERT COLE
Drywall Nailing 8/29/2019 Partial Approval ROBERT COLE
Green Building Rough 8/29/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 8/29/2019 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 8/30/2019 Partial Inspection ROBERT COLE
Deputy Steel/Welding 9/4/2019 Conditional Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Partial Approval ROBERT COLE
Insulation 9/6/2019 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 9/10/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 9/10/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 9/10/2019 Partial Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 9/11/2019 Partial Inspection ROBERT COLE
Green Building Rough 9/12/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 9/12/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 9/12/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 9/16/2019 Not Ready for Inspection ROBERT COLE
Deputy Drilled-In Anchors 9/17/2019 Conditional Approval ROBERT COLE
Light Gage Steel Frame 9/17/2019 Partial Approval ROBERT COLE
Green Building Rough 9/18/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 9/18/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 9/18/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 9/23/2019 Partial Approval ROBERT COLE
Insulation 9/24/2019 Partial Approval ROBERT COLE
Insulation 9/26/2019 Partial Approval ROBERT COLE
Insulation 9/27/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 10/1/2019 Partial Approval ROBERT COLE
Green Building Rough 10/2/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 10/2/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 10/2/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/4/2019 Partial Approval JAMES STEPHENS
Insulation 10/4/2019 Partial Approval JAMES STEPHENS
Drywall Nailing 10/7/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 10/8/2019 Partial Approval ROBERT COLE
Insulation 10/8/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/9/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/10/2019 Partial Inspection ROBERT COLE
Insulation 10/11/2019 Not Ready for Inspection ROBERT COLE
Insulation 10/15/2019 Partial Approval ROBERT COLE
Insulation 10/16/2019 Partial Approval ROBERT COLE
Insulation 10/17/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/18/2019 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 10/21/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 10/22/2019 Partial Inspection ROBERT COLE
Drywall Nailing 10/23/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/24/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/29/2019 Partial Approval ROBERT COLE
Insulation 10/29/2019 Partial Approval ROBERT COLE
Green Building Rough 10/30/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 10/30/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 10/30/2019 Partial Approval ROBERT COLE
Drywall Nailing 10/31/2019 Partial Approval ROBERT COLE
Wood Frame 10/31/2019 Partial Approval ROBERT COLE
Insulation 11/1/2019 Partial Approval DANNY RODRIGUEZ
Insulation 11/4/2019 Partial Approval ROBERT COLE
Drywall Nailing 11/6/2019 Partial Approval ROBERT COLE
Insulation 11/6/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 11/8/2019 Partial Approval ROBERT COLE
Insulation 11/8/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/12/2019 Partial Approval ROBERT COLE
Deputy Wood Construction 11/13/2019 Conditional Approval ROBERT COLE
Drywall Nailing 11/13/2019 Partial Approval ROBERT COLE
Insulation 11/13/2019 Partial Approval ROBERT COLE
Insulation 11/14/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/18/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/19/2019 Partial Approval ROBERT COLE
Insulation 11/20/2019 Partial Approval ROBERT COLE
Drywall Nailing 11/21/2019 Corrections Issued ROBERT COLE
Drywall Nailing 11/22/2019 Partial Approval ROBERT COLE
Insulation 11/22/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 11/25/2019 Partial Approval ROBERT COLE
Drywall Nailing 11/27/2019 Partial Approval ROBERT COLE
Green Building Rough 11/27/2019 Not Ready for Inspection ROBERT COLE
Insulation 11/27/2019 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 11/27/2019 Not Ready for Inspection ROBERT COLE
Drywall Nailing 12/2/2019 Partial Inspection ROBERT COLE
Insulation 12/2/2019 Partial Approval ROBERT COLE
Green Building Rough 12/3/2019 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 12/3/2019 Not Ready for Inspection ROBERT COLE
Wood Frame 12/3/2019 Partial Approval ROBERT COLE
Insulation 12/4/2019 Partial Approval ROBERT COLE
Drywall Nailing 12/5/2019 Partial Approval ROBERT COLE
Insulation 12/5/2019 Partial Approval ROBERT COLE
Drywall Nailing 12/6/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Partial Approval ROBERT COLE
Drywall Nailing 12/9/2019 Partial Approval ROBERT COLE
Insulation 12/9/2019 Partial Approval ROBERT COLE
Drywall Nailing 12/10/2019 Partial Approval ROBERT COLE
Wood Frame 12/10/2019 Partial Approval ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 12/12/2019 Partial Approval ROBERT COLE
Insulation 12/12/2019 Partial Approval ROBERT COLE
Drywall Nailing 12/13/2019 Partial Approval JAMES STEPHENS
Insulation 12/13/2019 Partial Approval JAMES STEPHENS
Insulation 12/17/2019 Partial Approval JAMES STEPHENS
Light Gage Steel Frame 12/17/2019 Partial Approval JAMES STEPHENS
Green Building Rough 12/18/2019 Partial Inspection JAMES STEPHENS
Insulation 12/18/2019 Partial Approval JAMES STEPHENS
Verify Sprinkler Sign Off 12/18/2019 Partial Inspection JAMES STEPHENS
Wood Frame 12/18/2019 Partial Approval JAMES STEPHENS
Drywall Nailing 12/20/2019 Partial Approval JEFF BYTHEWAY
Green Building Rough 12/20/2019 Not Ready for Inspection JEFF BYTHEWAY
Verify Sprinkler Sign Off 12/20/2019 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 12/20/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 12/24/2019 Partial Approval ROBERT DAVIS
Green Building Rough 12/24/2019 Not Ready for Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 12/24/2019 Not Ready for Inspection ROBERT DAVIS
Wood Frame 12/24/2019 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/26/2019 Partial Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 12/26/2019 Partial Inspection ROBERT COLE
Drywall Nailing 12/30/2019 Partial Approval ROBERT COLE
Wood Frame 12/30/2019 Partial Approval ROBERT COLE
Drywall Nailing 12/31/2019 Not Ready for Inspection ROBERT COLE
Insulation 12/31/2019 Partial Approval ROBERT COLE
Drywall Nailing 1/3/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 1/3/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/8/2020 Partial Approval ROBERT COLE
Insulation 1/8/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/9/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/10/2020 Partial Approval JAMES STEPHENS
Drywall Nailing 1/14/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/15/2020 Partial Approval ROBERT COLE
Green Building Rough 1/15/2020 Not Ready for Inspection ROBERT COLE
Interior/Exterior Lathing 1/15/2020 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 1/15/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 1/15/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/16/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 1/16/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 1/16/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 1/17/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 1/17/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/21/2020 Partial Approval ROBERT COLE
Insulation 1/21/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/22/2020 Partial Approval ROBERT COLE
Insulation 1/22/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/23/2020 Not Ready for Inspection ROBERT COLE
Insulation 1/23/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 1/23/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 1/24/2020 Partial Inspection JEFFREY FULTON
Insulation 1/24/2020 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 1/24/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/27/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 1/27/2020 Partial Approval ROBERT COLE
Drywall Nailing 1/28/2020 Not Ready for Inspection JAMES STEPHENS
Insulation 1/28/2020 Partial Approval JAMES STEPHENS
Drywall Nailing 1/30/2020 Order to Comply Issued ROBERT COLE
Insulation 1/30/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 1/30/2020 Partial Approval ROBERT COLE
Green Building Rough 1/31/2020 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 1/31/2020 No Access for Inspection ROBERT COLE
Wood Frame 1/31/2020 Partial Inspection ROBERT COLE
Insulation 2/4/2020 Partial Approval ROBERT COLE
Insulation 2/5/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 2/5/2020 Partial Approval ROBERT COLE
Drywall Nailing 2/6/2020 Partial Approval ROBERT COLE
Insulation 2/6/2020 Partial Approval ROBERT COLE
Drywall Nailing 2/7/2020 Partial Approval JAMES STEPHENS
Insulation 2/7/2020 Partial Approval JAMES STEPHENS
Drywall Nailing 2/11/2020 Not Ready for Inspection ROBERT COLE
Green Building Rough 2/11/2020 Not Ready for Inspection ROBERT COLE
Insulation 2/11/2020 Partial Inspection ROBERT COLE
Light Gage Steel Frame 2/11/2020 Corrections Issued ROBERT COLE
Verify Sprinkler Sign Off 2/11/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 2/11/2020 Partial Inspection ROBERT COLE
Drywall Nailing 2/12/2020 Partial Approval ROBERT COLE
Insulation 2/12/2020 Partial Approval ROBERT COLE
Drywall Nailing 2/13/2020 Partial Approval ROBERT COLE
Insulation 2/13/2020 Partial Inspection ROBERT COLE
Drywall Nailing 2/14/2020 Partial Inspection ROBERT COLE
Insulation 2/14/2020 Partial Inspection ROBERT COLE
Deputy Steel/Welding 2/19/2020 Conditional Approval ROBERT COLE
Drywall Nailing 2/19/2020 Partial Approval ROBERT COLE
Insulation 2/19/2020 Partial Approval ROBERT COLE
Drywall Nailing 2/20/2020 Partial Inspection ROBERT COLE
Insulation 2/20/2020 Partial Inspection ROBERT COLE
Drywall Nailing 2/21/2020 Not Ready for Inspection JAMES STEPHENS
Insulation 2/21/2020 Partial Approval JAMES STEPHENS
Drywall Nailing 2/25/2020 Not Ready for Inspection ROBERT COLE
Insulation 2/25/2020 Partial Approval ROBERT COLE
Drywall Nailing 2/26/2020 Partial Approval ROBERT COLE
Insulation 2/26/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 2/26/2020 Partial Approval ROBERT COLE
Drywall Nailing 2/27/2020 Partial Approval ROBERT COLE
Insulation 2/27/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 2/28/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 2/28/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 3/2/2020 Partial Approval ROBERT COLE
Wood Frame 3/2/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 3/3/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/4/2020 Not Ready for Inspection ROBERT COLE
Insulation 3/4/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 3/4/2020 Partial Approval ROBERT COLE
Deputy Steel/Welding 3/5/2020 Conditional Approval ROBERT COLE
Insulation 3/6/2020 Partial Approval JEFFREY DURAN
Wood Frame 3/6/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/9/2020 Conditional Approval ROBERT COLE
Insulation 3/9/2020 Partial Inspection ROBERT COLE
Interior/Exterior Lathing 3/9/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/10/2020 Partial Approval JEFFREY DURAN
Green Building Rough 3/10/2020 Partial Inspection JEFFREY DURAN
Insulation 3/10/2020 Not Ready for Inspection JEFFREY DURAN
Light Gage Steel Frame 3/10/2020 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 3/10/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 3/11/2020 Partial Approval ROBERT COLE
Insulation 3/11/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 3/13/2020 Partial Inspection ROBERT COLE
Insulation 3/13/2020 Partial Inspection ROBERT COLE
Drywall Nailing 3/16/2020 Partial Approval ROBERT COLE
Insulation 3/16/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/17/2020 Partial Approval ROBERT COLE
Insulation 3/17/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 3/17/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/18/2020 Partial Inspection ROBERT COLE
Drywall Nailing 3/19/2020 Partial Inspection ROBERT COLE
Insulation 3/19/2020 Partial Inspection ROBERT COLE
Drywall Nailing 3/23/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 3/23/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/24/2020 Partial Approval ROBERT COLE
Green Building Rough 3/24/2020 Not Ready for Inspection ROBERT COLE
Insulation 3/24/2020 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 3/24/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 3/24/2020 Partial Approval ROBERT COLE
Drywall Nailing 3/25/2020 Corrections Issued ROBERT COLE
Insulation 3/25/2020 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 3/26/2020 Conditional Approval ROBERT COLE
Drywall Nailing 3/26/2020 Partial Approval ROBERT COLE
Insulation 3/26/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 3/31/2020 Partial Approval ROBERT COLE
Insulation 3/31/2020 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 4/1/2020 Conditional Approval ROBERT COLE
Drywall Nailing 4/1/2020 Partial Inspection ROBERT COLE
Masonry Wall/Backfill 4/1/2020 Not Ready for Inspection ROBERT COLE
Deputy Reinf. Masonry 4/2/2020 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 4/2/2020 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 4/3/2020 Conditional Approval ROBERT COLE
Drywall Nailing 4/6/2020 Partial Approval ROBERT COLE
Drywall Nailing 4/7/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 4/7/2020 Partial Inspection ROBERT COLE
Drywall Nailing 4/8/2020 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 4/10/2020 Conditional Approval ROBERT COLE
Drywall Nailing 4/10/2020 Partial Approval ROBERT COLE
Deputy Drilled-In Anchors 4/13/2020 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 4/13/2020 Conditional Approval ROBERT COLE
Drywall Nailing 4/13/2020 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 4/14/2020 Approved JEFFREY DURAN
Drywall Nailing 4/14/2020 Partial Approval JEFFREY DURAN
Insulation 4/14/2020 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 4/14/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 4/14/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 4/15/2020 Conditional Approval ROBERT COLE
Masonry Wall/Backfill 4/15/2020 Partial Inspection ROBERT COLE
Drywall Nailing 4/16/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 4/21/2020 Partial Approval ROBERT COLE
Deputy Reinf. Masonry 4/22/2020 Conditional Approval ROBERT COLE
Drywall Nailing 4/22/2020 Partial Approval ROBERT COLE
Green Building Rough 4/24/2020 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 4/24/2020 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 4/24/2020 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 4/27/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 4/28/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 4/28/2020 Corrections Issued ROBERT COLE
Light Gage Steel Frame 4/30/2020 Not Ready for Inspection JOE VELASQUEZ
Insulation 5/1/2020 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 5/1/2020 Conditional Approval ROBERT COLE
Insulation 5/5/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 5/5/2020 Partial Approval ROBERT COLE
Green Building Rough 5/6/2020 Not Ready for Inspection ROBERT COLE
Insulation 5/6/2020 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 5/6/2020 Partial Approval ROBERT COLE
Verify Sprinkler Sign Off 5/6/2020 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 5/7/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/11/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 5/11/2020 Partial Approval ROBERT COLE
Drywall Nailing 5/13/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 5/13/2020 Partial Approval ROBERT COLE
Drywall Nailing 5/15/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 5/18/2020 Partial Approval ROBERT COLE
Drywall Nailing 5/21/2020 Partial Approval JOE VELASQUEZ
Light Gage Steel Frame 5/22/2020 Partial Approval ROBERT COLE
Special/Order Compliance 5/22/2020 Corrections Issued ROBERT COLE
Drywall Nailing 5/27/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 5/27/2020 Not Ready for Inspection ROBERT COLE
Drywall Nailing 5/29/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 5/29/2020 Partial Approval ROBERT COLE
Insulation 6/2/2020 Not Ready for Inspection ROBERT COLE
Light Gage Steel Frame 6/2/2020 Not Ready for Inspection ROBERT COLE
Insulation 6/4/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 6/4/2020 Partial Inspection ROBERT COLE
Light Gage Steel Frame 6/5/2020 Partial Inspection ROBERT COLE
Deputy Reinf. Concrete 6/8/2020 Conditional Approval ROBERT COLE
Drywall Nailing 6/8/2020 Partial Approval ROBERT COLE
Drywall Nailing 6/9/2020 Partial Inspection ROBERT COLE
Light Gage Steel Frame 6/9/2020 Partial Inspection ROBERT COLE
Drywall Nailing 6/10/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 6/10/2020 Partial Inspection ROBERT COLE
Interior/Exterior Lathing 6/11/2020 Partial Inspection ROBERT COLE
Drywall Nailing 6/12/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 6/15/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 6/16/2020 Partial Inspection ROBERT COLE
Light Gage Steel Frame 6/17/2020 Partial Approval ROBERT COLE
Drywall Nailing 6/19/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 6/19/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 6/19/2020 Partial Approval ROBERT COLE
Drywall Nailing 6/22/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 6/22/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 6/23/2020 Partial Approval ROBERT COLE
Drywall Nailing 6/24/2020 Partial Approval ROBERT COLE
Drywall Nailing 6/26/2020 Partial Approval ROBERT COLE
Interior/Exterior Lathing 6/26/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 7/1/2020 Partial Approval ROBERT COLE
Light Gage Steel Frame 7/7/2020 Partial Approval ROBERT COLE
Drywall Nailing 7/8/2020 Approved ROBERT COLE
Final 7/8/2020 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 7/8/2020 Approved ROBERT COLE
Green Building Final 7/8/2020 Not Ready for Inspection ROBERT COLE
Green Building Rough 7/8/2020 Approved ROBERT COLE
Insulation 7/8/2020 Approved ROBERT COLE
Interior/Exterior Lathing 7/8/2020 Approved ROBERT COLE
Reinforced Concrete Frame 7/8/2020 Partial Approval ROBERT COLE
SGSOV-Seismic Gas S/O Valve 7/8/2020 SGSOV Not Ready ROBERT COLE
SUSMP-Std. Urban Storm Water 7/8/2020 Not Ready for Inspection ROBERT COLE
Smoke Detectors 7/8/2020 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/8/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 7/8/2020 Partial Approval ROBERT COLE
Drywall Nailing 7/14/2020 Approved ROBERT COLE
Final 7/14/2020 Not Ready for Inspection ROBERT COLE
Footing/Foundation/Slab 7/14/2020 Conditional Approval ROBERT COLE
Green Building Final 7/14/2020 Not Ready for Inspection ROBERT COLE
Insulation 7/14/2020 Approved ROBERT COLE
Interior/Exterior Lathing 7/14/2020 Approved ROBERT COLE
Reinforced Concrete Frame 7/14/2020 Conditional Approval ROBERT COLE
SGSOV-Seismic Gas S/O Valve 7/14/2020 SGSOV Not Ready ROBERT COLE
SUSMP-Std. Urban Storm Water 7/14/2020 Not Ready for Inspection ROBERT COLE
Smoke Detectors 7/14/2020 Not Ready for Inspection ROBERT COLE
Verify Sprinkler Sign Off 7/14/2020 Not Ready for Inspection ROBERT COLE
Wood Frame 7/14/2020 Conditional Approval ROBERT COLE
Light Gage Steel Frame 7/16/2020 Partial Approval ROBERT COLE
Insulation 7/21/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/24/2020 Partial Approval ROBERT DAVIS
Drywall Nailing 7/28/2020 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 7/28/2020 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/31/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/3/2020 Approved HAMID PISHEHVAR
Light Gage Steel Frame 8/3/2020 Approved HAMID PISHEHVAR
Drywall Nailing 8/5/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/7/2020 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 8/7/2020 Corrections Issued DANNY RODRIGUEZ
Light Gage Steel Frame 8/10/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/12/2020 Partial Approval HAMID PISHEHVAR
Light Gage Steel Frame 8/17/2020 Conditional Approval JEFFREY FULTON
Light Gage Steel Frame 8/18/2020 Partial Inspection JEFFREY FULTON
Deputy Shotcrete 8/19/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 8/20/2020 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/25/2020 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/31/2020 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 9/9/2020 Conditional Approval DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 9/10/2020 SGSOV Not Ready DANNY RODRIGUEZ
Light Gage Steel Frame 9/16/2020 Not Ready for Inspection HAMID PISHEHVAR
Final 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 9/21/2020 SGSOV Not Ready DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/21/2020 Not Ready for Inspection DAVID BURKHEAD
Final 9/23/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 9/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 9/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 9/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 9/23/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 9/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
Smoke Detectors 9/23/2020 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 9/23/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 9/23/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 9/24/2020 Partial Inspection DANNY RODRIGUEZ
Final 9/25/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 9/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 9/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 9/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 9/25/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 9/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Smoke Detectors 9/25/2020 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 9/25/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 9/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 9/28/2020 Partial Inspection DANNY RODRIGUEZ
Final 10/1/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 10/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 10/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/1/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 10/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Smoke Detectors 10/1/2020 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/1/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 10/1/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 10/5/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 10/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 10/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/5/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 10/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Smoke Detectors 10/5/2020 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/5/2020 Partial Inspection DANNY RODRIGUEZ
Wood Frame 10/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 10/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 10/8/2020 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 10/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/8/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 10/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Smoke Detectors 10/8/2020 Approved DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 10/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 10/13/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/13/2020 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 10/13/2020 Partial Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/13/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 10/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 10/13/2020 Not Ready for Inspection DANNY RODRIGUEZ
Final 10/15/2020 OK for TCO DANNY RODRIGUEZ
Reinforced Concrete Frame 10/15/2020 Approved DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/15/2020 SGSOV Not Ready DANNY RODRIGUEZ
SUSMP-Std. Urban Storm Water 10/15/2020 Approved DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/15/2020 Approved DANNY RODRIGUEZ
Wood Frame 10/15/2020 Approved DANNY RODRIGUEZ
Final 2/25/2021 Partial Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 2/25/2021 SGSOV Approved DANNY RODRIGUEZ
Final 2/26/2021 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/25/2021 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/30/2021 Not Ready for Inspection DANNY RODRIGUEZ
Final 3/31/2021 Partial Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 3/31/2021 Not Ready for Inspection DANNY RODRIGUEZ
Final 4/13/2021 OK for TCO DANNY RODRIGUEZ