Pre-Inspection
|
6/3/2019
|
Approved
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
7/31/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/1/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
8/1/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
8/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
8/7/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
8/7/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
METHANE-Barrier
|
8/7/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
METHANE-Subgrade
|
8/7/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/8/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
8/8/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
8/8/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Methane Barrier
|
8/9/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/14/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/14/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
8/15/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
8/15/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
8/15/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
METHANE-Barrier
|
8/15/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
8/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
8/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
8/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/20/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/20/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/21/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
8/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
8/23/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
METHANE-Rough
|
8/23/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Masonry Wall/Backfill
|
8/23/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
8/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Reinforced Masonry Frame
|
8/23/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Verify Sprinkler Sign Off
|
8/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/26/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/27/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/28/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
8/28/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
METHANE-Rough
|
8/28/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Reinforced Concrete Frame
|
8/28/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Verify Sprinkler Sign Off
|
8/28/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/29/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
8/30/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
8/30/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
9/3/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
9/3/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
METHANE-Rough
|
9/3/2019
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
|
Piling/Pier/Caisson
|
9/3/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Reinforced Concrete Frame
|
9/3/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Verify Sprinkler Sign Off
|
9/3/2019
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
9/4/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
9/4/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
9/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
9/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/9/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/10/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/11/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/11/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/17/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/17/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
METHANE-Subgrade
|
9/23/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/25/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/25/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/26/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/26/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/27/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Masonry
|
9/27/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
9/30/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
10/1/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/1/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
10/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
10/3/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/3/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
10/3/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
METHANE-Barrier
|
10/3/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
10/3/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/4/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/10/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/11/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Methane Barrier
|
10/15/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
10/16/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
10/17/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/17/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Methane Barrier
|
10/18/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/21/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
10/22/2019
|
Partial Approval
|
JAMES POWERS
|
|
METHANE-Barrier
|
10/22/2019
|
Approved
|
JAMES POWERS
|
|
METHANE-Subgrade
|
10/22/2019
|
Approved
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/25/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/28/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/29/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/30/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
10/31/2019
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Concrete Frame
|
10/31/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/1/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/4/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/4/2019
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
11/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/7/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/8/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/14/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/15/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/20/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/21/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
11/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
11/25/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
11/25/2019
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
11/26/2019
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
12/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/2/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
12/3/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/3/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
12/4/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/4/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
12/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/5/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Other (see comments)
|
12/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
12/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/6/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/9/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/10/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/13/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
12/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Drilled-In Anchors
|
12/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
12/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Drilled-In Anchors
|
12/20/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
12/23/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/24/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/26/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
12/27/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
12/30/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy EIFS
|
12/31/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Drilled-In Anchors
|
1/3/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
1/3/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
1/3/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
1/6/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
1/6/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/6/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
1/6/2020
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
1/7/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
1/8/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
1/8/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
1/9/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
1/10/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/10/2020
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
1/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/23/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
1/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
METHANE-Rough
|
1/23/2020
|
Approved
|
LESLIE TRUJILLO
|
|
Structural Steel Frame
|
1/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Verify Sprinkler Sign Off
|
1/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Wood Frame
|
1/23/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
1/30/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
2/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
2/3/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
2/3/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
2/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
2/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/7/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Other (see comments)
|
2/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
2/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/19/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
2/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/24/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/25/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
2/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/12/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
3/12/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Verify Sprinkler Sign Off
|
3/12/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Wood Frame
|
3/12/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
3/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/20/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
3/20/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/23/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
3/24/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
3/25/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Green Building Rough
|
3/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/25/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
3/25/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/31/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/31/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
3/31/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/1/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Shotcrete
|
4/2/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Steel/Welding
|
4/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/10/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
4/10/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/13/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/13/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
4/13/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
4/13/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/13/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
4/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/24/2020
|
Conditional Approval
|
RONALD PACHECO
|
|
Deputy Steel/Welding
|
4/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
4/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
4/30/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/4/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
5/7/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/7/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/7/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Structural Steel Frame
|
5/11/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/11/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/15/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/18/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
5/18/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
5/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
5/20/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
5/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/4/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/5/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
6/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
6/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/9/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
6/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/10/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
6/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
6/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/12/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/12/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/15/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/18/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
6/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/22/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/22/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/23/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
6/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
6/25/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/25/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
6/26/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/6/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/6/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Wall Anchors
|
7/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
7/31/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
7/31/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/6/2020
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Deputy Steel/Welding
|
8/6/2020
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Verify Sprinkler Sign Off
|
8/6/2020
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Wood Frame
|
8/6/2020
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Fireproofing
|
8/7/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
8/7/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/7/2020
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Fireproofing
|
8/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/14/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
8/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/26/2020
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
8/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/4/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/25/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
9/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
9/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/30/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
10/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
10/2/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
10/2/2020
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
10/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
10/13/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
10/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
10/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
10/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
10/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Fireproofing
|
10/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/5/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
11/17/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
11/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Final
|
1/13/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/13/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
1/13/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/13/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
1/13/2021
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
1/13/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/13/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
1/13/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
2/3/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
2/4/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
2/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
2/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/16/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Final
|
2/16/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
2/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
2/16/2021
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
2/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
2/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
2/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/17/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/17/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
3/3/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
3/3/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/3/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
3/3/2021
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
3/3/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/3/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
3/3/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Final
|
3/8/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
3/9/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
3/9/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/9/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
3/9/2021
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/9/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
3/9/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
3/11/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
3/18/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
4/8/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
4/20/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
4/20/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
4/20/2021
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
4/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
4/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
4/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
10/4/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/4/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
10/4/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/4/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/4/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
10/20/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
12/3/2021
|
OK to Issue CofO
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
12/3/2021
|
Approved
|
RAFAEL ESPINOZA
|