707 S BERENDO ST 90005

Certificate Information: 707 S BERENDO ST 90005

Application / Permit
18010-10000-00635
Plan Check / Job No.
B18LA03160
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6-STORY 21 UNITS APT. BLDG. OVER 2-LEVEL SUB. PARKING, (5-story residential Type III-A construction over 1-story residential and basement parking Type I-A construction)
Permit Issued
Issued on 6/27/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 3/10/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/20/2018 APPLICANT
Assigned to Plan Check Engineer 3/22/2018 SAM CHANG
Corrections Issued 4/12/2018 SAM CHANG
Quality Review Completed 4/16/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 4/19/2018 APPLICANT
Disabled Access Plans Picked Up 4/19/2018 APPLICANT
Green Plans Picked Up 4/19/2018 APPLICANT
Applicant returned to address corrections 10/5/2018 SAM CHANG
Applicant returned to address corrections 11/6/2018 SAM CHANG
Applicant returned to address corrections 11/15/2018 SAM CHANG
Applicant returned to address corrections 12/4/2018 SAM CHANG
Applicant returned to address corrections 1/31/2019 SAM CHANG
Applicant returned to address corrections 2/14/2019 SAM CHANG
Applicant returned to address corrections 2/20/2019 SAM CHANG
Applicant returned to address corrections 3/13/2019 SAM CHANG
Plan Check Approved 4/9/2019 SAM CHANG
Issued 6/27/2019 LADBS
CofO in Progress 3/10/2026 RAFAEL ESPINOZA
Permit Finaled 3/10/2026 RAFAEL ESPINOZA
CofO Issued 3/10/2026 RAFAEL ESPINOZA
Permit Finaled 3/10/2026 RAFAEL ESPINOZA

Permit Application Clearance Information

Project located in CRA area Cleared 9/28/2018 JIM URQUHART
Highway dedication Cleared 10/15/2018 STEVE MELGAR
Building over 3-story or 36-ft Cleared 11/6/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/6/2018 CALOSHA APPROVED
Address approval Cleared 11/7/2018 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 11/7/2018 JEANETTE VONG
Permit Cleared 11/7/2018 JEANETTE VONG
Hydrant and Access approval Cleared 11/21/2018 GILBERT URREA
Driveway location Cleared 11/26/2018 COLLINS ALLAN
Internal circulation Cleared 11/26/2018 COLLINS ALLAN
Sewer availability Cleared 11/28/2018 STEVE MELGAR
Low Impact Development Cleared 12/7/2018 MITESH PATEL
Green Code Cleared 1/15/2019 SARAH ABOULHOSN
DAS Clearance Cleared 1/16/2019 ELIZABETH TOMS
Frnt yard landscape/Water mgmt Cleared 1/24/2019 MOTOUMI SASAKI
Opn space landscape/Water mgmt Cleared 1/24/2019 MOTOUMI SASAKI
Roof/Waste drainage to street Cleared 2/20/2019 ADRIAN SANCHEZ
Work Adjacent to Public Way Cleared 3/13/2019 TERRY PHAN
Fire Marshall Fire Life Safety Cleared 3/18/2019 MENOA AGHAJANI

Contact Information

Architect Kostic,, Vasa; Lic. No.: C10740 1827-10TH ST_#4      SANTA MONICA, CA 90404
Contractor Ark Construction & Development Inc; Lic. No.: 438036-B 15332 ANTIOCH ST #519      PACIFIC PALISADES, CA 90272
Engineer Berkoz,, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356
Engineer Jitechian, Ara; Lic. No.: C54893 9433 VIA PATRICIA      BURBANK, CA 91504

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Pre-Stress Concrete 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/22/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 8/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/14/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 2/14/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Barrier 2/14/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 2/14/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 2/27/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 2/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 2/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/6/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/12/2020 No Access for Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2020 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 3/13/2020 Partial Inspection DANIEL COLLINS
Deputy Reinf. Concrete 3/16/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 3/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 3/18/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/19/2020 Approved RAFAEL ESPINOZA
Footing/Foundation/Slab 3/19/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 3/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/27/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 3/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 3/27/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/8/2020 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/9/2020 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 4/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/13/2020 Corrections Issued RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 4/14/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/17/2020 Order to Comply Issued RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/20/2020 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 4/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 4/20/2020 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/20/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Shotcrete 4/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/22/2020 Conditional Approval RAFAEL ESPINOZA
Pre-Inspection 4/22/2020 Approved RAFAEL ESPINOZA
Deputy Shotcrete 4/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/27/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/29/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 4/29/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 4/30/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/30/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 5/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 5/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/7/2020 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 5/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/8/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/13/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/16/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/5/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/13/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 8/26/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 8/26/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 8/26/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 9/9/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 9/9/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 9/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/11/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/15/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/16/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/17/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 9/17/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 9/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/12/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/12/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/12/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/13/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/20/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/23/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/23/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/7/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/8/2020 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 12/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/14/2020 Conditional Approval NICK DANERI
Reinforced Masonry Frame 12/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/15/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/19/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/20/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 1/25/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/26/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/26/2021 Off-Hour Fees Due
Reinforced Concrete Frame 1/26/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/26/2021 Off-Hour Fees Due
Structural Steel Frame 3/22/2021 Corrections Issued RAFAEL ESPINOZA
Deputy Steel/Welding 3/23/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Wood Frame 3/24/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Steel/Welding 3/25/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 3/26/2021 Conditional Approval NICK DANERI
Deputy Steel/Welding 5/12/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/14/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 5/24/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/25/2021 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 6/24/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/24/2021 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 8/10/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 9/15/2021 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 9/21/2021 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 5/17/2022 Not Ready for Inspection JAMES POWERS
Deputy Wood Construction 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 10/3/2022 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/3/2022 Corrections Issued RAFAEL ESPINOZA
Deputy Wood Construction 9/21/2023 Conditional Approval GREGORY POMISH
Wood Frame 9/21/2023 Partial Inspection GREGORY POMISH
Wood Frame 9/28/2023 Partial Approval GREGORY POMISH
Wood Frame 10/6/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 10/20/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/30/2023 Partial Inspection GREGORY POMISH
Insulation 11/30/2023 Partial Approval GREGORY POMISH
Wood Frame 11/30/2023 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 12/13/2023 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/3/2024 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 1/3/2024 Partial Inspection GREGORY POMISH
Wood Frame 1/3/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 1/10/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 1/16/2024 Partial Approval GREGORY POMISH
Drywall Nailing 1/25/2024 Partial Approval GREGORY POMISH
Insulation 1/25/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/25/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 2/9/2024 Partial Inspection GREGORY POMISH
Drywall Nailing 2/16/2024 Partial Approval GREGORY POMISH
Drywall Nailing 2/20/2024 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 3/26/2024 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 3/29/2024 Conditional Approval NICK DANERI
Footing/Foundation/Slab 3/29/2024 Approved NICK DANERI
Wood Frame 5/13/2024 Not Ready for Inspection LUIS CCAMACHO
Interior/Exterior Lathing 6/3/2024 Not Ready for Inspection NICK DANERI
Wood Frame 6/3/2024 Partial Approval NICK DANERI
Interior/Exterior Lathing 6/5/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/1/2024 Partial Approval NICK DANERI
Masonry Wall/Backfill 7/23/2024 Conditional Approval NICK DANERI
Pre-Inspection 7/23/2024 Partial Inspection NICK DANERI
Masonry Wall/Backfill 7/26/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 7/30/2024 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 8/13/2024 Partial Approval LARRY ARNICK
Drywall Nailing 8/21/2024 Partial Approval NICK DANERI
Insulation 8/21/2024 Partial Approval NICK DANERI
Interior/Exterior Lathing 9/11/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/11/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/20/2024 Partial Approval TIMOTHY POWELL
Drywall Nailing 9/23/2024 Partial Approval NICK DANERI
Special/Order Compliance 10/28/2024 Partial Inspection NICK DANERI
Wood Frame 11/5/2024 Partial Inspection JEROME BLACKWOOD
Pre-Inspection 11/7/2024 Partial Inspection NICK DANERI
Wood Frame 12/5/2024 Partial Approval NICK DANERI
Special/Order Compliance 12/11/2024 Partial Inspection NICK DANERI
Masonry Wall/Backfill 1/16/2025 Partial Approval NICK DANERI
Reinforced Concrete Frame 2/11/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/11/2025 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 2/18/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 2/18/2025 Not Ready for Inspection NICK DANERI
Wood Frame 2/27/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 3/10/2025 Partial Approval NICK DANERI
Light Gage Steel Frame 3/25/2025 Partial Approval NICK DANERI
Masonry Wall/Backfill 3/27/2025 Partial Approval NICK DANERI
Masonry Wall/Backfill 4/1/2025 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/29/2025 Conditional Approval NICK DANERI
Reinforced Concrete Frame 5/1/2025 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/1/2025 Not Ready for Inspection NICK DANERI
Masonry Wall/Backfill 5/21/2025 Partial Approval NICK DANERI
Masonry Wall/Backfill 6/4/2025 Partial Approval JOEY BUCHANAN
Final 7/17/2025 Corrections Issued JOEY BUCHANAN
Green Building Final 7/17/2025 Approved JOEY BUCHANAN
Reinforced Concrete Frame 7/17/2025 Approved JOEY BUCHANAN
Reinforced Masonry Frame 7/17/2025 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 7/17/2025 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 7/17/2025 Approved JOEY BUCHANAN
Verify Sprinkler Sign Off 7/17/2025 Approved JOEY BUCHANAN
Final 8/18/2025 Not Ready for Inspection JOEY BUCHANAN
Final 11/12/2025 Conditional Approval JOEY BUCHANAN
Final 12/2/2025 Not Ready for Inspection JOEY BUCHANAN
Final 1/6/2026 Not Ready for Inspection JOEY BUCHANAN
Final 2/24/2026 Conditional Approval JOEY BUCHANAN
Final 3/2/2026 Not Ready for Inspection JAMES POWERS
Final 3/9/2026 OK to Issue CofO JOEY BUCHANAN