Deputy Pre-Stress Concrete
|
7/10/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/10/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/11/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/11/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/12/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/15/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/15/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/16/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/17/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/17/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/18/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/19/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Pre-Stress Concrete
|
7/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
7/22/2019
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Pre-Inspection
|
8/1/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
2/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/14/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
2/14/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
2/14/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
2/27/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
2/27/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/6/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/12/2020
|
No Access for Inspection
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
3/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
3/13/2020
|
Partial Inspection
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/17/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
3/17/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/17/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/18/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/19/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/19/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
3/19/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/19/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
3/27/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/27/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/27/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
4/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/8/2020
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
4/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/13/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/13/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/13/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/14/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/17/2020
|
Order to Comply Issued
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
4/20/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
4/22/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
4/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/30/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/8/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/16/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/5/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/13/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
8/26/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/26/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
9/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
9/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
9/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
9/9/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
9/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
9/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
11/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/12/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/12/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/12/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
11/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/13/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/13/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/23/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/23/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/1/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/3/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/8/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
12/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/14/2020
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
12/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/15/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/19/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/20/2021
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
1/25/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/26/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/26/2021
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
1/26/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/26/2021
|
Off-Hour Fees Due
|
|
|
Structural Steel Frame
|
3/22/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/23/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/24/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
3/24/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
3/26/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
5/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/13/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
5/24/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/25/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
6/24/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
6/24/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
8/10/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/11/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
9/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Piling/Pier/Caisson
|
5/17/2022
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Deputy Wood Construction
|
9/20/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/3/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
9/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Wood Frame
|
9/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/28/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
10/6/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
10/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/30/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
11/30/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
11/30/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
12/13/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
1/3/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
1/3/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
1/3/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/10/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/25/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
1/25/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
1/25/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/9/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/20/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/26/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
3/29/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
3/29/2024
|
Approved
|
NICK DANERI
|
|
Wood Frame
|
5/13/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Interior/Exterior Lathing
|
6/3/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
6/3/2024
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
6/5/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/1/2024
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
7/23/2024
|
Conditional Approval
|
NICK DANERI
|
|
Pre-Inspection
|
7/23/2024
|
Partial Inspection
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
7/26/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
7/29/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
7/30/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
8/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
8/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
9/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
9/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
9/20/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
9/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
10/28/2024
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
11/5/2024
|
Partial Inspection
|
JEROME BLACKWOOD
|
|
Pre-Inspection
|
11/7/2024
|
Partial Inspection
|
NICK DANERI
|
|
Wood Frame
|
12/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
12/11/2024
|
Partial Inspection
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
1/16/2025
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/11/2025
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/11/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/18/2025
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/18/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
2/27/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
3/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
3/25/2025
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
3/27/2025
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
4/1/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
4/29/2025
|
Conditional Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/1/2025
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/1/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
5/21/2025
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
6/4/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Final
|
7/17/2025
|
Corrections Issued
|
JOEY BUCHANAN
|
|
Green Building Final
|
7/17/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
7/17/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Masonry Frame
|
7/17/2025
|
Approved
|
JOEY BUCHANAN
|
|
SGSOV-Seismic Gas S/O Valve
|
7/17/2025
|
SGSOV Approved
|
JOEY BUCHANAN
|
|
Smoke Detectors
|
7/17/2025
|
Approved
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
7/17/2025
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
8/18/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Final
|
11/12/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Final
|
12/2/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Final
|
1/6/2026
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Final
|
2/24/2026
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Final
|
3/2/2026
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Final
|
3/9/2026
|
OK to Issue CofO
|
JOEY BUCHANAN
|