|
Pre-Inspection
|
1/16/2020
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
5/8/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
5/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/15/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/19/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/22/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/26/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/26/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
5/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
6/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/11/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/6/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/15/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/16/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/20/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
7/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/24/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/28/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
7/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/29/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/30/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/31/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/12/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
8/18/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/20/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
8/21/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
8/21/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/28/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/31/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
9/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
9/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
9/2/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
9/4/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/21/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/30/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/6/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
10/9/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/2/2020
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
11/10/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
11/12/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/1/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/16/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/17/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
12/17/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/21/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/28/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2021
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
2/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
2/18/2021
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/8/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/8/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/12/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/15/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/16/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/17/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/24/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
4/12/2021
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/14/2021
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
4/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
4/21/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/21/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
4/27/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
5/4/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/14/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/18/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/18/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/20/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/20/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
5/21/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/24/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/26/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
5/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
5/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
5/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/3/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/4/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/8/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/11/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
6/11/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
6/21/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/21/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
6/21/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
6/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/25/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Light Gage Steel Frame
|
6/25/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Verify Sprinkler Sign Off
|
6/25/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Insulation
|
6/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
7/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
7/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/14/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/14/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
7/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
7/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/19/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
7/19/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
7/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
7/26/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
7/26/2021
|
Approved
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
7/27/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Drywall Nailing
|
7/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
7/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
7/30/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Drywall Nailing
|
8/3/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/3/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
8/4/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
8/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
8/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/11/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
8/26/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
8/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
8/27/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/2/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/14/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
9/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
10/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/20/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/22/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/27/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/28/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/1/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/4/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/9/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/22/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
11/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
11/30/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
11/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/16/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
12/20/2021
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
12/22/2021
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
12/28/2021
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
1/3/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
1/26/2022
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
1/26/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
2/1/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/3/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/22/2022
|
Partial Approval
|
TED RIES
|
|
Masonry Wall/Backfill
|
2/28/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/11/2022
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
3/16/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/29/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/21/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/21/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
4/25/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
4/25/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
4/25/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
5/4/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
5/6/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/10/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/11/2022
|
Conditional Approval
|
NICK DANERI
|
|
Final
|
5/18/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
5/18/2022
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/18/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
5/20/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
5/20/2022
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/20/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
5/20/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/20/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
5/25/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/26/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
5/27/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
5/27/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/27/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/27/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
5/27/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
5/31/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
11/9/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
12/22/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
12/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
12/22/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
12/22/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Final
|
12/29/2022
|
OK to Issue CofO
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
12/29/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
12/29/2022
|
Approved
|
RAFAEL ESPINOZA
|