839 S FEDORA ST 90005

Certificate Information: 839 S FEDORA ST 90005

Application / Permit
18010-10000-00377
Plan Check / Job No.
B18LA01952
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 7 Story 81-unit Apartment Building with 2-Story Subterranean Parking Garage. 7-story superstructure includes 5-story Type IIIA on top of 2 story Type IA construction. Usiong TOC Tier 1 Ordinance with 9 very low income unit.
Permit Issued
Issued on 12/31/2019
Issuing Office
Metro
Current Status
CofO Issued on 10/18/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/9/2018 APPLICANT
Assigned to Plan Check Engineer 3/8/2018 QUAN NGHIEM
Corrections Issued 3/22/2018 QUAN NGHIEM
Quality Review Completed 3/28/2018 BILL STUTSMAN
Building Plans Picked Up 4/3/2018 APPLICANT
Applicant returned to address corrections 3/5/2019 QUAN NGHIEM
Applicant returned to address corrections 10/9/2019 QUAN NGHIEM
Plan Check Approved 12/31/2019 QUAN NGHIEM
Issued 12/31/2019 LADBS
TCO Issued (Expire Date: 10-18-2022) 4/21/2022 ERNESTO CORRAL
CofO in Progress 10/18/2022 RAFAEL ESPINOZA
CofO Issued 10/18/2022 ERNESTO CORRAL
Permit Finaled 10/18/2022 ERNESTO CORRAL

Permit Application Clearance Information

Project located in CRA area Cleared 8/17/2018 JIM URQUHART
Address approval Cleared 2/6/2019 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 2/6/2019 JEANETTE VONG
Highway dedication Cleared 2/6/2019 JEANETTE VONG
Site Plan review Cleared 2/6/2019 KIT AWAKUNI
Building over 3-story or 36-ft Cleared 3/29/2019 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/29/2019 CALOSHA APPROVED
Green Code Cleared 4/1/2019 QUAN NGHIEM
Frnt yard landscape/Water mgmt Cleared 4/2/2019 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 4/2/2019 SOPHIE GABEL-SCHEINBAU
Sewer availability Cleared 8/27/2019 JEANETTE VONG
Hydrant and Access approval Cleared 10/22/2019 GEORGE SUCHAND
Low Impact Development Cleared 10/23/2019 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 10/23/2019 JEANIE LAM
Density Bonus 12.22.A.31 Cleared 10/28/2019 LOUIE MILLER
Fire Marshall Fire Life Safety Cleared 11/12/2019 WILLIAM JOHNS
DAS Clearance Cleared 11/13/2019 QUAN NGHIEM
Work Adjacent to Public Way Cleared 12/27/2019 TERRY PHAN

Contact Information

Contractor Frymer Construction; Lic. No.: 860661-B 2461 SANTA MONICA BLVD 134      SANTA MONICA, CA 90404

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/16/2020 Approved LESLIE TRUJILLO
Footing/Foundation/Slab 4/23/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/29/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/1/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/6/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/7/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/11/2020 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 5/12/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 5/12/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/12/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/13/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/29/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/25/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/1/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/7/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/9/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 7/15/2020 Corrections Issued RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/15/2020 Not Ready for Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 7/16/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 7/16/2020 Approved RAFAEL ESPINOZA
Masonry Wall/Backfill 7/28/2020 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 7/31/2020 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/11/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/11/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/13/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/17/2020 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/18/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/18/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/19/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/21/2020 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/21/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/24/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 8/28/2020 Partial Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 8/31/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/21/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/25/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/29/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/30/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/2/2020 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/2/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/6/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/2/2020 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/2/2020 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/2/2020 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 11/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/12/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/13/2020 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 11/17/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/19/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 11/20/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/2/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 12/7/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 12/9/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/9/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 12/22/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 1/6/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 1/6/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 1/8/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 1/12/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/12/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 1/14/2021 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 1/28/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 1/29/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/1/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/1/2021 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/2/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/4/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/4/2021 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/8/2021 Partial Approval NICK DANERI
Deputy Steel/Welding 2/10/2021 Conditional Approval NICK DANERI
Structural Steel Frame 2/17/2021 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/18/2021 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 2/19/2021 Partial Approval JAMES POWERS
Drywall Nailing 2/22/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/22/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/23/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/24/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/25/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/25/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/1/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/4/2021 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 3/9/2021 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 3/15/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/22/2021 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/23/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/24/2021 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/25/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/30/2021 Partial Approval RAFAEL ESPINOZA
Insulation 3/31/2021 Partial Approval NICK DANERI
Drywall Nailing 4/1/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/5/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/12/2021 Partial Approval RAFAEL ESPINOZA
Insulation 4/12/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/16/2021 Partial Approval JONATHAN QUACH
Drywall Nailing 4/19/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 4/23/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/23/2021 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/26/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 4/29/2021 Partial Approval DANIEL COLLINS
Floor/Roof Diaphrgm/Shear Wall 4/29/2021 Partial Approval DANIEL COLLINS
Deputy Wood Construction 5/3/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 5/3/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/3/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/3/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/3/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/4/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 5/4/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/5/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 5/5/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/6/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/7/2021 Partial Approval DAVID BURKHEAD
Insulation 5/11/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/11/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 5/12/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/12/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/14/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/18/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/18/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/18/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/19/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/19/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/20/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/21/2021 Partial Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/21/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 5/21/2021 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/24/2021 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/24/2021 Partial Approval DAVID BURKHEAD
Insulation 5/24/2021 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/25/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/25/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/25/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/26/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/26/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/27/2021 Partial Approval RAFAEL ESPINOZA
Insulation 5/27/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/28/2021 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 6/1/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/1/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/1/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/3/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 6/3/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/4/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/4/2021 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/7/2021 Conditional Approval NICK DANERI
Wood Frame 6/7/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/8/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/8/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/9/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/10/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/10/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 6/11/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 6/14/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 6/15/2021 Partial Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 6/15/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/16/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 6/16/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/22/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/23/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/24/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/29/2021 Partial Approval RAFAEL ESPINOZA
Insulation 6/29/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 6/30/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 7/1/2021 Partial Approval RAFAEL ESPINOZA
Insulation 7/1/2021 Partial Approval RAFAEL ESPINOZA
Insulation 7/2/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/2/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/2/2021 Partial Approval RAFAEL ESPINOZA
Insulation 7/6/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/6/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/7/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/7/2021 Partial Inspection RAFAEL ESPINOZA
Insulation 7/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 7/9/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/9/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/9/2021 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 7/12/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/12/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/15/2021 Partial Approval RAFAEL ESPINOZA
Insulation 7/20/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/20/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/20/2021 Not Ready for Inspection JAMES POWERS
Insulation 7/22/2021 Partial Approval JAMES POWERS
Insulation 7/23/2021 Partial Approval JAMES POWERS
Insulation 7/26/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/26/2021 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 7/26/2021 Not Ready for Inspection JAMES POWERS
Wood Frame 7/26/2021 Not Ready for Inspection JAMES POWERS
Drywall Nailing 7/29/2021 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/2/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/5/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/11/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/11/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/13/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/13/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/16/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 8/16/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/20/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/20/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 8/20/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/23/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/23/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/24/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 8/24/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/27/2021 Partial Approval RAFAEL ESPINOZA
Insulation 8/27/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/31/2021 Partial Approval RAFAEL ESPINOZA
Insulation 9/10/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/10/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 9/13/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/13/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 9/22/2021 Partial Approval RAFAEL ESPINOZA
Insulation 10/7/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/7/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/18/2021 Partial Approval RAFAEL ESPINOZA
Insulation 10/18/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/28/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/1/2021 Partial Approval RAFAEL ESPINOZA
Insulation 11/1/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/1/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/3/2021 Partial Approval RAFAEL ESPINOZA
Insulation 11/4/2021 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 11/10/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/16/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 11/18/2021 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 11/30/2021 Approved RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/30/2021 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 12/6/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 12/6/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/21/2021 Conditional Approval NICK DANERI
Light Gage Steel Frame 12/22/2021 Partial Approval NICK DANERI
Drywall Nailing 12/30/2021 Partial Approval NICK DANERI
Interior/Exterior Lathing 1/10/2022 Approved RAFAEL ESPINOZA
Masonry Wall/Backfill 1/26/2022 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 2/1/2022 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/7/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/8/2022 Approved RAFAEL ESPINOZA
Pre-Inspection 3/7/2022 Partial Inspection RAFAEL ESPINOZA
Final 3/10/2022 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 3/16/2022 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 3/29/2022 Approved RAFAEL ESPINOZA
Final 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 3/29/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 3/29/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 4/4/2022 Partial Approval RAFAEL ESPINOZA
Final 4/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 4/11/2022 Approved RAFAEL ESPINOZA
Green Building Final 4/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 4/11/2022 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 4/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/11/2022 Approved RAFAEL ESPINOZA
Wood Frame 4/11/2022 Approved RAFAEL ESPINOZA
Final 4/15/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 4/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/15/2022 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 4/15/2022 Approved RAFAEL ESPINOZA
Final 4/21/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 4/21/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/21/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/21/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 9/28/2022 Approved RAFAEL ESPINOZA
Final 10/18/2022 OK to Issue CofO RAFAEL ESPINOZA
Green Building Final 10/18/2022 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 10/18/2022 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 10/18/2022 Approved RAFAEL ESPINOZA