1101 N MAIN ST 90012

Certificate Information: 1101 N MAIN ST 90012

Application / Permit
18010-10000-00346
Plan Check / Job No.
B18LA01781
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 318-unit, 5-story, Type IIIA, Apartment building over 2-story, Type IA parking and residential amenities.
Permit Issued
Issued on 5/14/2019
Issuing Office
Metro
Current Status
CofO Issued on 1/25/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/8/2018 APPLICANT
Assigned to Plan Check Engineer 3/8/2018 EUGENE BARBEAU
Corrections Issued 3/12/2018 EUGENE BARBEAU
Quality Review Completed 3/13/2018 DAVID CHANG
Building Plans Picked Up 3/16/2018 APPLICANT
Applicant returned to address corrections 5/2/2018 EUGENE BARBEAU
Applicant returned to address corrections 8/2/2018 EUGENE BARBEAU
Plan Check Approved 5/14/2019 EUGENE BARBEAU
Issued 5/14/2019 LADBS
TCO Issued (Expire Date: 09-15-2021) 3/19/2021 ERNESTO CORRAL
TCO Issued (Expire Date: 01-31-2022) 8/4/2021 ERNESTO CORRAL
TCO Issued (Expire Date: 03-09-2022) 9/10/2021 ERNESTO CORRAL
CofO in Progress 12/27/2021 TERRY HERR
CofO in Progress 1/25/2022 RAFAEL ESPINOZA
Permit Finaled 1/25/2022 TERRY HERR
CofO Issued 1/25/2022 TERRY HERR
Permit Finaled 1/25/2022 TERRY HERR

Permit Application Clearance Information

Address approval Cleared 5/1/2018 MICHAEL CASTILLO
Eng Process Fee Ord 176,300 Cleared 5/1/2018 MICHAEL CASTILLO
Sewer availability Cleared 6/1/2018 CELINA MORENO
Green Code Cleared 7/11/2018 EUGENE BARBEAU
DAS Clearance Cleared 8/23/2018 EUGENE BARBEAU
Hydrant and Access approval Cleared 9/19/2018 GEORGE SUCHAND
Fire Marshall Fire Life Safety Cleared 10/11/2018 WILLIAM JOHNS
Low Impact Development Cleared 1/17/2019 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 3/26/2019 KARAN PATEL
CPC Cleared 5/13/2019 DANALYNN DOMINGUEZ
Highway dedication Cleared 5/13/2019 TERRY PHAN
Opn space landscape/Water mgmt Cleared 5/13/2019 DANALYNN DOMINGUEZ
Permit Cleared 5/13/2019 TERRY PHAN
Site Plan review Cleared 5/13/2019 DANALYNN DOMINGUEZ
Specific Plan Cleared 5/13/2019 DANALYNN DOMINGUEZ
Tract Map conditions Cleared 5/13/2019 DANALYNN DOMINGUEZ
Building over 3-story or 36-ft Cleared 5/14/2019 CALOSHA APPROVED

Contact Information

Architect Arnold,, John Howard; Lic. No.: C30834 2166 W 30TH STREET      LOS ANGELES, CA 90018
Contractor Penick T B & Sons Inc; Lic. No.: 185381-B 15435 INNOVATION DR STE 100      SAN DIEGO, CA 92128
Engineer Kawjaree,, Samson Espiritu; Lic. No.: C83863 2820 SIERRA ST      LOS ANGELES, CA 90031
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505
Engineer Vandorpe,, Thomas Daniel; Lic. No.: S4611 1845 W ORANGEWOOD AVE SUITE 200      ORANGE, CA 92868
Landscape Architect Border,, Duane S; Lic. No.: LA5810 3820 STOCKER ST. #6      LOS ANGELES, CA 90008

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/13/2019 Approved ERNESTO CORRAL
Deputy Reinf. Concrete 6/19/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/19/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/20/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/20/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/21/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/21/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 6/21/2019 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 6/21/2019 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 6/21/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/24/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 6/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/26/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/26/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 6/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 6/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/28/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/2/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/2/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/3/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/3/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/5/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/8/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/8/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/9/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/9/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/10/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/10/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/11/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/12/2019 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/12/2019 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 7/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/16/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/16/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/17/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/17/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/18/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/18/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/19/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/19/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/22/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/22/2019 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 7/22/2019 Approved ERNESTO CORRAL
METHANE-Subgrade 7/22/2019 Approved ERNESTO CORRAL
Deputy Reinf. Concrete 7/23/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/23/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 7/23/2019 Partial Inspection ERNESTO CORRAL
METHANE-Rough 7/23/2019 Approved ERNESTO CORRAL
Deputy Reinf. Concrete 7/24/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 7/25/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/26/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/29/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/29/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/30/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/30/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 7/30/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/31/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/31/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 7/31/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/1/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/1/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/2/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/2/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 8/2/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 8/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/7/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 8/9/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/13/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 8/13/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/14/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/14/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/15/2019 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 8/15/2019 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/16/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/16/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Methane Barrier 8/20/2019 Conditional Approval FRED WOHLFARTH
Deputy Pre-Stress Concrete 8/20/2019 Conditional Approval FRED WOHLFARTH
Deputy Reinf. Concrete 8/20/2019 Conditional Approval FRED WOHLFARTH
Deputy Reinf. Masonry 8/20/2019 Conditional Approval FRED WOHLFARTH
Excavation/Setback/Form/Re-Bar 8/20/2019 Partial Approval FRED WOHLFARTH
Footing/Foundation/Slab 8/20/2019 Partial Approval FRED WOHLFARTH
Deputy Methane Barrier 8/21/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/21/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/21/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 8/21/2019 Approved DANIEL MC AULIFFE
Green Building Rough 8/21/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 8/21/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 8/21/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Methane Barrier 8/22/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/22/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/22/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 8/22/2019 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/22/2019 Partial Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 8/23/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/23/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 8/23/2019 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 8/23/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/26/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 8/26/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 8/27/2019 Conditional Approval ERNESTO CORRAL
Masonry Wall/Backfill 8/27/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 8/28/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/28/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 8/29/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/29/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 8/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 8/30/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/30/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Methane Barrier 9/4/2019 Conditional Approval JEFFREY FULTON
Deputy Pre-Stress Concrete 9/4/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 9/4/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 9/4/2019 Conditional Approval JEFFREY FULTON
Masonry Wall/Backfill 9/4/2019 Conditional Approval JEFFREY FULTON
Deputy Pre-Stress Concrete 9/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/6/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 9/6/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 9/6/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/10/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/10/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/10/2019 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 9/10/2019 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/10/2019 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/11/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 9/12/2019 Partial Inspection ERNESTO CORRAL
Green Building Rough 9/12/2019 Approved ERNESTO CORRAL
Reinforced Concrete Frame 9/12/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 9/12/2019 Not Ready for Inspection ERNESTO CORRAL
Masonry Wall/Backfill 9/16/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/17/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 9/17/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 9/17/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/23/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/23/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/23/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/24/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/24/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/24/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/25/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/25/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/25/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 9/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/30/2019 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 9/30/2019 Partial Inspection ERNESTO CORRAL
Reinforced Masonry Frame 9/30/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 9/30/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/8/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/8/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/8/2019 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 10/8/2019 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/8/2019 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 10/8/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/9/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/10/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/11/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/11/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/11/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 10/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/16/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/16/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/16/2019 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 10/16/2019 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/18/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 10/18/2019 Partial Inspection ERNESTO CORRAL
Reinforced Concrete Frame 10/18/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 10/18/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/23/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/23/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/24/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/24/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/24/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 10/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 10/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/25/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 10/25/2019 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 10/28/2019 Partial Approval DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 10/29/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/29/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/29/2019 Approved JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/30/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 10/30/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/30/2019 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 10/30/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 10/30/2019 Partial Approval JEFF BYTHEWAY
Deputy Pre-Stress Concrete 10/31/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/31/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/31/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/1/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/1/2019 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 11/1/2019 Not Ready for Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 11/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 11/4/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/4/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/4/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 11/4/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 11/5/2019 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 11/5/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 11/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 11/7/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 11/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/8/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/8/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 11/8/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 11/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/13/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 11/13/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/13/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/13/2019 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 11/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 11/14/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/14/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 11/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 11/15/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/15/2019 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 11/18/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/18/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/18/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/19/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/20/2019 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/21/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/21/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/21/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 11/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 11/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 11/25/2019 Conditional Approval ERNESTO CORRAL
Drywall Nailing 11/25/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 11/25/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/26/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/26/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 11/26/2019 Partial Inspection ERNESTO CORRAL
Reinforced Concrete Frame 11/26/2019 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 11/26/2019 Approved ERNESTO CORRAL
Deputy Drilled-In Anchors 11/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 12/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 12/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/4/2019 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 12/4/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/5/2019 Approved DANIEL MC AULIFFE
Deputy Pre-Stress Concrete 12/5/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/5/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 12/5/2019 Approved DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 12/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/6/2019 Conditional Approval ERNESTO CORRAL
Drywall Nailing 12/6/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/9/2019 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/9/2019 Partial Approval JAMES POWERS
Deputy Wood Construction 12/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 12/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/11/2019 Conditional Approval ERNESTO CORRAL
Drywall Nailing 12/11/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 12/11/2019 Partial Inspection ERNESTO CORRAL
Wall Anchors 12/11/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 12/13/2019 Conditional Approval ERNESTO CORRAL
Drywall Nailing 12/13/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 12/13/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/16/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 12/16/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 12/16/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 12/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/17/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 12/17/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 12/17/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 12/17/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 12/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/19/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 12/19/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 12/19/2019 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 12/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 12/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 12/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 12/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 12/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/2/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/2/2020 Partial Approval JAMES POWERS
Drywall Nailing 1/2/2020 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/3/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/3/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/6/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 1/6/2020 Conditional Approval ERNESTO CORRAL
Wood Frame 1/6/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 1/7/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/7/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/7/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/7/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/8/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/8/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/8/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/9/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/10/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/10/2020 Conditional Approval ERNESTO CORRAL
Reinforced Masonry Frame 1/10/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 1/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2020 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/13/2020 Partial Approval JAMES POWERS
Drywall Nailing 1/13/2020 Partial Approval JAMES POWERS
Deputy Wood Construction 1/14/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 1/15/2020 Partial Inspection ERNESTO CORRAL
Structural Steel Frame 1/15/2020 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 1/21/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/22/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 1/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/24/2020 Conditional Approval ERNESTO CORRAL
Drywall Nailing 1/24/2020 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 1/24/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 1/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/27/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/27/2020 Conditional Approval ERNESTO CORRAL
Drywall Nailing 1/27/2020 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 1/27/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 1/28/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/28/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/28/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 1/28/2020 Conditional Approval ERNESTO CORRAL
Wood Frame 1/28/2020 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 1/29/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 1/29/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/30/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 2/3/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/3/2020 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 2/3/2020 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 2/4/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 2/4/2020 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 2/4/2020 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 2/5/2020 Approved DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Inspection DANIEL MC AULIFFE
Insulation 2/5/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 2/6/2020 Conditional Approval DANIEL COLLINS
Deputy Wood Construction 2/6/2020 Conditional Approval DANIEL COLLINS
Drywall Nailing 2/6/2020 Partial Approval RAFAEL ESPINOZA
Insulation 2/6/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 2/7/2020 Approved DANIEL MC AULIFFE
Deputy Wood Construction 2/10/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 2/10/2020 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 2/11/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/18/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 2/18/2020 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 2/19/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/19/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/20/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/21/2020 Conditional Approval ERNESTO CORRAL
Drywall Nailing 2/21/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 2/21/2020 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 2/24/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/24/2020 Conditional Approval ERNESTO CORRAL
Drywall Nailing 2/24/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 2/24/2020 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 2/25/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 2/25/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 2/27/2020 Partial Inspection ERNESTO CORRAL
Wall Anchors 2/27/2020 Partial Inspection ERNESTO CORRAL
Wood Frame 2/27/2020 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 2/28/2020 Partial Approval RONALD PACHECO
Floor/Roof Diaphrgm/Shear Wall 3/2/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/2/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/4/2020 Partial Inspection DANIEL MC AULIFFE
Wood Frame 3/4/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Wood Construction 3/5/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/5/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/5/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/6/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/6/2020 Partial Inspection ERNESTO CORRAL
Deputy Wood Construction 3/9/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/10/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/10/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/13/2020 No Access for Inspection ERNESTO CORRAL
Insulation 3/13/2020 No Access for Inspection ERNESTO CORRAL
Deputy Wood Construction 3/16/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/17/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/17/2020 Partial Inspection ERNESTO CORRAL
Wood Frame 3/17/2020 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 3/19/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 3/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/23/2020 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 3/23/2020 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/23/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/23/2020 Partial Inspection ERNESTO CORRAL
Drywall Nailing 3/25/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/25/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/25/2020 Partial Inspection ERNESTO CORRAL
Drywall Nailing 3/26/2020 Not Ready for Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/26/2020 Not Ready for Inspection ERNESTO CORRAL
Insulation 3/26/2020 Not Ready for Inspection ERNESTO CORRAL
Drywall Nailing 3/27/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 3/27/2020 Partial Inspection ERNESTO CORRAL
Insulation 3/27/2020 Partial Inspection ERNESTO CORRAL
Drywall Nailing 4/1/2020 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 4/1/2020 Partial Inspection ERNESTO CORRAL
Insulation 4/1/2020 Partial Inspection ERNESTO CORRAL
Drywall Nailing 4/3/2020 Not Ready for Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 4/3/2020 Partial Inspection ERNESTO CORRAL
Insulation 4/3/2020 Not Ready for Inspection ERNESTO CORRAL
Drywall Nailing 4/6/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/6/2020 Corrections Issued RAFAEL ESPINOZA
Insulation 4/6/2020 Corrections Issued RAFAEL ESPINOZA
Drywall Nailing 4/11/2020 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 4/11/2020 Off-Hour Fees Due
Insulation 4/11/2020 Off-Hour Fees Due
Drywall Nailing 4/18/2020 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/18/2020 Not Ready for Inspection LARRY ARNICK
Insulation 4/18/2020 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 4/20/2020 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/20/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/20/2020 Partial Inspection DAVID BURKHEAD
Insulation 4/25/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 4/25/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 4/27/2020 Approved RAFAEL ESPINOZA
Deputy Wood Construction 4/29/2020 Conditional Approval JONATHAN QUACH
Light Gage Steel Frame 4/29/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 4/29/2020 Partial Approval DANIEL MC AULIFFE
Wood Frame 5/5/2020 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 5/6/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/6/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/6/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/6/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/6/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/7/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/7/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/9/2020 Partial Approval DAVID TSAU
Deputy Wood Construction 5/11/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/12/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/12/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/13/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/13/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/15/2020 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/15/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/19/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/19/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/19/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 5/20/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/22/2020 Partial Inspection ERNESTO CORRAL
Wood Frame 5/22/2020 Partial Inspection ERNESTO CORRAL
Insulation 5/27/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/2/2020 Partial Approval RAFAEL ESPINOZA
Insulation 6/2/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 6/2/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/2/2020 Partial Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Methane Barrier 6/5/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/5/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 6/5/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 6/8/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 6/8/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/9/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 6/9/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/11/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/11/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/15/2020 Partial Approval RAFAEL ESPINOZA
Insulation 6/15/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/15/2020 Partial Approval RAFAEL ESPINOZA
Insulation 6/18/2020 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 6/18/2020 Partial Inspection RAFAEL ESPINOZA
Wood Frame 6/18/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/22/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/23/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 6/23/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/23/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/25/2020 Conditional Approval RAFAEL ESPINOZA
Wood Frame 6/25/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/26/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/30/2020 Partial Approval RAFAEL ESPINOZA
Insulation 6/30/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 6/30/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/1/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/1/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/1/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/6/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 7/6/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/6/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/8/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/8/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/8/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 7/9/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 7/9/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 7/10/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/10/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/10/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Interior/Exterior Lathing 7/13/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/15/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/15/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 7/17/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/17/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/17/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/17/2020 Partial Inspection RAFAEL ESPINOZA
Insulation 7/22/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/22/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 7/23/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/23/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/23/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/23/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/27/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/27/2020 Not Ready for Inspection RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 7/28/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/28/2020 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/28/2020 Partial Approval RAFAEL ESPINOZA
Insulation 7/29/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/29/2020 Partial Inspection RAFAEL ESPINOZA
Wood Frame 7/29/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/31/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 7/31/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 7/31/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 7/31/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/3/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/3/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 8/3/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/3/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/4/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/4/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/4/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/4/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Steel/Welding 8/5/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/5/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/5/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 8/5/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/6/2020 Conditional Approval LANNY MERRICK
Insulation 8/10/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 8/10/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/12/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/12/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/12/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 8/12/2020 Partial Inspection RAFAEL ESPINOZA
Insulation 8/14/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 8/14/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/14/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/19/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/19/2020 Partial Inspection RAFAEL ESPINOZA
Wood Frame 8/19/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/21/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 8/21/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/26/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/27/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 8/27/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/27/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 8/27/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/28/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/31/2020 Conditional Approval RAFAEL ESPINOZA
Wood Frame 9/1/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/3/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/4/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/8/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 9/8/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 9/8/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/9/2020 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 9/9/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Steel/Welding 9/10/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/11/2020 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/11/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/14/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/15/2020 Conditional Approval RAFAEL ESPINOZA
Wood Frame 9/15/2020 Partial Approval RAFAEL ESPINOZA
Insulation 9/17/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Wood Frame 9/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Steel/Welding 9/18/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/21/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/22/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 9/22/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 9/22/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/23/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 9/24/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/25/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Wood Construction 9/28/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 9/29/2020 Partial Approval RAFAEL ESPINOZA
Insulation 9/29/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 9/29/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/30/2020 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 10/1/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/6/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 10/6/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/6/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 10/13/2020 Partial Approval RAFAEL ESPINOZA
Insulation 10/16/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 10/16/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/20/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/22/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 10/22/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/22/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/23/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 10/28/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/5/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/6/2020 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 11/6/2020 Partial Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/10/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 11/12/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 11/12/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 11/16/2020 Approved RAFAEL ESPINOZA
Footing/Foundation/Slab 12/4/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/11/2020 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 12/11/2020 Partial Approval NICK DANERI
Masonry Wall/Backfill 12/16/2020 Partial Approval RAFAEL ESPINOZA
Final 1/15/2021 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 1/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 1/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 1/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 1/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 1/15/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 1/15/2021 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 2/1/2021 Partial Inspection RAFAEL ESPINOZA
Smoke Detectors 2/17/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 2/17/2021 Partial Approval RAFAEL ESPINOZA
Final 2/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 2/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 2/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 2/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 2/18/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 2/18/2021 SGSOV Not Ready RAFAEL ESPINOZA
Final 3/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 3/10/2021 Approved RAFAEL ESPINOZA
Green Building Final 3/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 3/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 3/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 3/10/2021 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 3/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 3/16/2021 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 3/19/2021 Partial Approval RAFAEL ESPINOZA
Final 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 4/23/2021 Partial Inspection RAFAEL ESPINOZA
Green Building Final 4/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 4/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 4/27/2021 Conditional Approval RAFAEL ESPINOZA
Final 6/2/2021 Partial Inspection RAFAEL ESPINOZA
Green Building Final 6/2/2021 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 6/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 6/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 6/21/2021 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 6/21/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 6/21/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 6/21/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 7/8/2021 Partial Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 7/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 7/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 7/9/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/13/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 7/13/2021 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 8/9/2021 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 8/11/2021 Approved RAFAEL ESPINOZA
Final 8/12/2021 Corrections Issued RAFAEL ESPINOZA
Reinforced Concrete Frame 8/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 8/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 8/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 8/12/2021 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 8/18/2021 Approved RAFAEL ESPINOZA
Special/Order Compliance 8/25/2021 Approved RAFAEL ESPINOZA
Final 10/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 10/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 10/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 10/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 12/16/2021 Conditional Approval EDWIN GREGORYONA
Reinforced Concrete Frame 12/16/2021 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 12/16/2021 Approved EDWIN GREGORYONA
Smoke Detectors 12/16/2021 Approved EDWIN GREGORYONA
Final 12/23/2021 Not Ready for Inspection NICK DANERI
Special/Order Compliance 1/5/2022 Partial Inspection RAFAEL ESPINOZA
Final 1/25/2022 OK to Issue CofO RAFAEL ESPINOZA