Pre-Inspection
|
5/13/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
11/16/2020
|
Conditional Approval
|
PAUL DAVIDSON
|
Deputy Grading
|
11/17/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
11/18/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
11/19/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
11/20/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Other (see comments)
|
11/23/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Other (see comments)
|
11/24/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Other (see comments)
|
11/25/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
11/30/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
12/1/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
12/2/2020
|
Approved
|
JOHN DODGE
|
Deputy Grading
|
12/3/2020
|
Approved
|
JOHN DODGE
|
Deputy Grading
|
12/4/2020
|
Approved
|
JOHN DODGE
|
Deputy Grading
|
12/7/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
12/8/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
12/9/2020
|
No Access for Inspection
|
TED RIES
|
Deputy Grading
|
12/10/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Grading
|
12/11/2020
|
Approved
|
JEFF BYTHEWAY
|
Footing/Foundation/Slab
|
12/21/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
12/22/2020
|
Approved
|
JEFF BYTHEWAY
|
Excavation/Setback/Form/Re-Bar
|
12/23/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
12/24/2020
|
Conditional Approval
|
TED RIES
|
Green Building Rough
|
12/24/2020
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
METHANE-Rough
|
12/24/2020
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
12/24/2020
|
Partial Approval
|
JEFF BYTHEWAY
|
Verify Sprinkler Sign Off
|
12/24/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
12/28/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
12/29/2020
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
1/5/2021
|
Approved
|
DERRICK SPENCER
|
Excavation/Setback/Form/Re-Bar
|
1/16/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Footing/Foundation/Slab
|
1/16/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
METHANE-Barrier
|
1/16/2021
|
Approved
|
JEFF BYTHEWAY
|
METHANE-Subgrade
|
1/16/2021
|
Approved
|
JEFF BYTHEWAY
|
Pre-Inspection
|
1/16/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
2/8/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
2/9/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
2/10/2021
|
Approved
|
JEFF BYTHEWAY
|
Footing/Foundation/Slab
|
2/10/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
2/11/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
2/17/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
2/18/2021
|
Conditional Approval
|
PAUL DAVIDSON
|
Deputy Shotcrete
|
2/19/2021
|
Approved
|
DERRICK SPENCER
|
Deputy Shotcrete
|
2/23/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
2/24/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
2/25/2021
|
Approved
|
JEFF BYTHEWAY
|
Green Building Rough
|
2/25/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
2/25/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
2/26/2021
|
Approved
|
JEFF BYTHEWAY
|
Green Building Rough
|
2/27/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
2/27/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
3/1/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
3/1/2021
|
Approved
|
JEFF BYTHEWAY
|
Green Building Rough
|
3/1/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
3/1/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
3/2/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
3/3/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
3/9/2021
|
Conditional Approval
|
ALAN NOVAK
|
Deputy Reinf. Masonry
|
3/10/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
3/11/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
3/12/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Masonry Frame
|
3/12/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
3/30/2021
|
Approved
|
JEFF BYTHEWAY
|
Footing/Foundation/Slab
|
3/30/2021
|
Approved
|
JEFF BYTHEWAY
|
Green Building Rough
|
3/30/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
3/31/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Drilled-In Anchors
|
4/26/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
4/30/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
5/7/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
5/10/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
5/10/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
5/11/2021
|
Conditional Approval
|
SORIN CIRSTOIU
|
Reinforced Concrete Frame
|
5/12/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
5/13/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
5/13/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
5/18/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Masonry Frame
|
5/18/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
5/19/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
6/16/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
6/18/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
6/24/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
6/24/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
6/25/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
6/28/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Shotcrete
|
6/29/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
6/30/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Masonry Frame
|
6/30/2021
|
Conditional Approval
|
JEFF BYTHEWAY
|
Deputy Reinf. Masonry
|
7/1/2021
|
Approved
|
DERRICK SPENCER
|
Deputy Drilled-In Anchors
|
7/23/2021
|
Approved
|
JEFF BYTHEWAY
|
Reinforced Concrete Frame
|
8/4/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Wall Anchors
|
8/4/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
8/6/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Reinf. Concrete
|
8/9/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
8/26/2021
|
Approved
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
8/26/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Wood Frame
|
8/26/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
9/13/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
10/5/2021
|
Approved
|
JEFF BYTHEWAY
|
Wood Frame
|
10/12/2021
|
Partial Approval
|
DERRICK SPENCER
|
Deputy Wood Construction
|
11/12/2021
|
Approved
|
JEFF BYTHEWAY
|
Wood Frame
|
11/12/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
11/15/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
11/16/2021
|
Approved
|
JEFF BYTHEWAY
|
Wood Frame
|
11/16/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
11/17/2021
|
Approved
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
11/17/2021
|
Partial Inspection
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
11/18/2021
|
Approved
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
11/18/2021
|
Corrections Issued
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
11/19/2021
|
Approved
|
JEFF BYTHEWAY
|
Wood Frame
|
11/23/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Wood Frame
|
12/2/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
12/8/2021
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
12/9/2021
|
Approved
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
12/9/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
12/10/2021
|
Approved
|
JEFF BYTHEWAY
|
Drywall Nailing
|
12/10/2021
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
12/20/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Wood Frame
|
12/28/2021
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/12/2022
|
Approved
|
JEFF BYTHEWAY
|
Wood Frame
|
1/12/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/21/2022
|
Approved
|
JEFF BYTHEWAY
|
SUSMP-Std. Urban Storm Water
|
1/21/2022
|
Approved
|
JEFF BYTHEWAY
|
Wood Frame
|
1/21/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/24/2022
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/25/2022
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/26/2022
|
Approved
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/27/2022
|
Approved
|
JEFF BYTHEWAY
|
Insulation
|
1/27/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
Deputy Wood Construction
|
1/28/2022
|
Approved
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
2/4/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
2/4/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Wood Frame
|
2/4/2022
|
Corrections Issued
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
2/9/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Insulation
|
2/9/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Wood Frame
|
2/9/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
2/11/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
2/16/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
2/22/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Insulation
|
2/22/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
2/25/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
2/25/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
3/2/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
Insulation
|
3/2/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Special/Order Compliance
|
3/2/2022
|
Partial Inspection
|
DAVID TSAU
|
Drywall Nailing
|
3/7/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
3/7/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Interior/Exterior Lathing
|
3/7/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
3/10/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
3/11/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Floor/Roof Diaphrgm/Shear Wall
|
3/17/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Insulation
|
3/17/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Wood Frame
|
3/17/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Interior/Exterior Lathing
|
3/22/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
3/23/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
3/23/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
3/24/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Insulation
|
3/30/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
3/30/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
3/31/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
3/31/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/5/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Insulation
|
4/5/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/12/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/13/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/14/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/15/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Wood Frame
|
4/18/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/25/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/26/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
4/26/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
4/28/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
5/2/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
5/10/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
5/12/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
5/17/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Special/Order Compliance
|
5/19/2022
|
Approved
|
JEFF BYTHEWAY
|
Interior/Exterior Lathing
|
5/24/2022
|
Approved
|
JEFF BYTHEWAY
|
Drywall Nailing
|
6/2/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Wood Frame
|
6/9/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
6/16/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
Drywall Nailing
|
7/1/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
7/14/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Reinforced Masonry Frame
|
7/29/2022
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
8/2/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
8/17/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
8/31/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
Light Gage Steel Frame
|
8/31/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Drywall Nailing
|
9/2/2022
|
Approved
|
JEFF BYTHEWAY
|
Drywall Nailing
|
10/13/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
Interior/Exterior Lathing
|
10/25/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
Interior/Exterior Lathing
|
11/18/2022
|
Approved
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
12/15/2022
|
Approved
|
DERRICK SPENCER
|
Special/Order Compliance
|
1/20/2023
|
Approved
|
DERRICK SPENCER
|
Masonry Wall/Backfill
|
1/24/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Final
|
4/25/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Green Building Final
|
4/25/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Reinforced Concrete Frame
|
4/25/2023
|
Approved
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
4/25/2023
|
Approved
|
DERRICK SPENCER
|
SGSOV-Seismic Gas S/O Valve
|
4/25/2023
|
SGSOV Approved
|
DERRICK SPENCER
|
Smoke Detectors
|
4/25/2023
|
Approved
|
DERRICK SPENCER
|
Final
|
5/3/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Green Building Final
|
5/3/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Verify Rec and Parks Fee Memo
|
5/5/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Final
|
5/12/2023
|
Partial Inspection
|
NICK LAROCCA
|
Green Building Final
|
5/12/2023
|
Not Ready for Inspection
|
NICK LAROCCA
|
Final
|
5/16/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
Green Building Final
|
5/16/2023
|
Approved
|
DERRICK SPENCER
|
Final
|
7/27/2023
|
OK to Issue CofO
|
DERRICK SPENCER
|
Pre-Inspection
|
7/31/2023
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
8/1/2023
|
Approved
|
DERRICK SPENCER
|
Final
|
8/4/2023
|
OK to Issue CofO
|
DERRICK SPENCER
|