1775 S BELOIT AVE 1-16 90025

Certificate Information: 1775 S BELOIT AVE 1-16 90025

Application / Permit
18010-10000-00323
Plan Check / Job No.
B18LA01654
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 7-story, 16-unit, Apartment building over 1 level subterranean parking garage: 5-story, Type IIIA, residential above a podium, 2 story, Type IA, residential over ground level and 1-level subterranean parking garages.
Permit Issued
Issued on 11/21/2019
Issuing Office
Metro
Current Status
CofO Issued on 8/11/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/5/2018 APPLICANT
Assigned to Plan Check Engineer 3/1/2018 MINYE PAK
Corrections Issued 3/27/2018 KESETE HAREGOT
Quality Review Completed 4/4/2018 SIAVOSH POURSABAHIAN
Building Plans Picked Up 4/6/2018 APPLICANT
Applicant returned to address corrections 5/1/2018 KESETE HAREGOT
Applicant returned to address corrections 8/9/2018 KESETE HAREGOT
Applicant returned to address corrections 2/26/2019 KESETE HAREGOT
Plan Check Approved 3/7/2019 KESETE HAREGOT
Issued 11/21/2019 LADBS
CofO in Progress 8/4/2023 DERRICK SPENCER
CofO in Progress 8/7/2023 DERRICK SPENCER
Permit Finaled 8/11/2023 HENRY BAGHDASSARIAN
CofO Issued 8/11/2023 HENRY BAGHDASSARIAN
Permit Finaled 8/11/2023 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Address approval Cleared 4/9/2018 FATIMA GUERRA
CPC Cleared 4/17/2018 IVORY CHAMBESHI
Eng Process Fee Ord 176,300 Cleared 4/20/2018 JAMES KHO
Sewer availability Cleared 4/20/2018 JAMES KHO
Highway dedication Cleared 7/17/2018 ANDREW SLUSSER
Specific Plan Cleared 7/23/2018 BRIAN CARR
Internal circulation Cleared 7/24/2018 CLIVE GRAWE
Specific Plan Cleared 7/24/2018 CLIVE GRAWE
Low Impact Development Cleared 8/22/2018 RYAN HUDSON
Roof/Waste drainage to street Cleared 8/22/2018 NAZILA NOORIFAR
Stormwater Pollution Mitigatn Cleared 8/22/2018 RYAN HUDSON
Green Code Cleared 10/30/2018 KESETE HAREGOT
DAS Clearance Cleared 11/29/2018 KESETE HAREGOT
Construction within easement Cleared 12/3/2018 RIDWAN HARDY
Frnt yard landscape/Water mgmt Cleared 12/5/2018 SOPHIE GABEL-SCHEINBAU
Opn space landscape/Water mgmt Cleared 12/5/2018 SOPHIE GABEL-SCHEINBAU
Construction near power lines Cleared 12/8/2018 RIDWAN HARDY
Hydrant and Access approval Cleared 12/19/2018 ROBERT DUFF
Fire Marshall Fire Life Safety Cleared 2/26/2019 OSCAR SALGADO JR
Building over 3-story or 36-ft Cleared 3/7/2019 CALOSHA APPROVED

Contact Information

Architect Shubin,, Russell James; Lic. No.: C19250 3834 WILLAT AVENUE      CULVER CITY, CA 90232
Contractor M A S Construction Group Inc; Lic. No.: 1014814-B 1543 7TH STREET SUITE 100      SANTA MONICA, CA 90401
Engineer Labib,, Youhanna T; Lic. No.: S4549 319 MAIN STREET      EL SEGUNDO, CA 90245
Engineer Larocca,, Francis Joseph; Lic. No.: C75121 1821 PACIFIC COAST HWY 38      HERMOSA BEACH, CA 90254

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/13/2020 Approved JEFF BYTHEWAY
Deputy Grading 11/16/2020 Conditional Approval PAUL DAVIDSON
Deputy Grading 11/17/2020 Approved JEFF BYTHEWAY
Deputy Grading 11/18/2020 Approved JEFF BYTHEWAY
Deputy Grading 11/19/2020 Approved JEFF BYTHEWAY
Deputy Grading 11/20/2020 Approved JEFF BYTHEWAY
Deputy Other (see comments) 11/23/2020 Approved JEFF BYTHEWAY
Deputy Other (see comments) 11/24/2020 Approved JEFF BYTHEWAY
Deputy Other (see comments) 11/25/2020 Approved JEFF BYTHEWAY
Deputy Grading 11/30/2020 Approved JEFF BYTHEWAY
Deputy Grading 12/1/2020 Approved JEFF BYTHEWAY
Deputy Grading 12/2/2020 Approved JOHN DODGE
Deputy Grading 12/3/2020 Approved JOHN DODGE
Deputy Grading 12/4/2020 Approved JOHN DODGE
Deputy Grading 12/7/2020 Approved JEFF BYTHEWAY
Deputy Grading 12/8/2020 Approved JEFF BYTHEWAY
Deputy Grading 12/9/2020 No Access for Inspection TED RIES
Deputy Grading 12/10/2020 Approved JEFF BYTHEWAY
Deputy Grading 12/11/2020 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 12/21/2020 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 12/22/2020 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 12/23/2020 Not Ready for Inspection JEFF BYTHEWAY
Deputy Shotcrete 12/24/2020 Conditional Approval TED RIES
Green Building Rough 12/24/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Rough 12/24/2020 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 12/24/2020 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 12/24/2020 Approved JEFF BYTHEWAY
Deputy Shotcrete 12/28/2020 Approved JEFF BYTHEWAY
Deputy Shotcrete 12/29/2020 Approved JEFF BYTHEWAY
Deputy Shotcrete 1/5/2021 Approved DERRICK SPENCER
Excavation/Setback/Form/Re-Bar 1/16/2021 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 1/16/2021 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Barrier 1/16/2021 Approved JEFF BYTHEWAY
METHANE-Subgrade 1/16/2021 Approved JEFF BYTHEWAY
Pre-Inspection 1/16/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/8/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/9/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/10/2021 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/10/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/11/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/17/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/18/2021 Conditional Approval PAUL DAVIDSON
Deputy Shotcrete 2/19/2021 Approved DERRICK SPENCER
Deputy Shotcrete 2/23/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/24/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 2/25/2021 Approved JEFF BYTHEWAY
Green Building Rough 2/25/2021 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 2/25/2021 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 2/26/2021 Approved JEFF BYTHEWAY
Green Building Rough 2/27/2021 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 2/27/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/1/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/1/2021 Approved JEFF BYTHEWAY
Green Building Rough 3/1/2021 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 3/1/2021 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 3/2/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/3/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 3/9/2021 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 3/10/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 3/11/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 3/12/2021 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 3/12/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/30/2021 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 3/30/2021 Approved JEFF BYTHEWAY
Green Building Rough 3/30/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/31/2021 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/26/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/30/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/7/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/10/2021 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 5/10/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/11/2021 Conditional Approval SORIN CIRSTOIU
Reinforced Concrete Frame 5/12/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/13/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/13/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 5/18/2021 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 5/18/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Masonry 5/19/2021 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/16/2021 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/18/2021 Approved JEFF BYTHEWAY
Deputy Shotcrete 6/24/2021 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/24/2021 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 6/25/2021 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/28/2021 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 6/29/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/30/2021 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 6/30/2021 Conditional Approval JEFF BYTHEWAY
Deputy Reinf. Masonry 7/1/2021 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 7/23/2021 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 8/4/2021 Partial Approval JEFF BYTHEWAY
Wall Anchors 8/4/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/6/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/9/2021 Approved JEFF BYTHEWAY
Deputy Wood Construction 8/26/2021 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 8/26/2021 Partial Approval JEFF BYTHEWAY
Wood Frame 8/26/2021 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 9/13/2021 Approved JEFF BYTHEWAY
Deputy Wood Construction 10/5/2021 Approved JEFF BYTHEWAY
Wood Frame 10/12/2021 Partial Approval DERRICK SPENCER
Deputy Wood Construction 11/12/2021 Approved JEFF BYTHEWAY
Wood Frame 11/12/2021 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 11/15/2021 Approved JEFF BYTHEWAY
Deputy Wood Construction 11/16/2021 Approved JEFF BYTHEWAY
Wood Frame 11/16/2021 Partial Inspection JEFF BYTHEWAY
Deputy Wood Construction 11/17/2021 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 11/17/2021 Partial Inspection JEFF BYTHEWAY
Deputy Wood Construction 11/18/2021 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 11/18/2021 Corrections Issued JEFF BYTHEWAY
Deputy Wood Construction 11/19/2021 Approved JEFF BYTHEWAY
Wood Frame 11/23/2021 Partial Approval JEFF BYTHEWAY
Wood Frame 12/2/2021 Partial Approval JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 12/7/2021 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 12/8/2021 Approved JEFF BYTHEWAY
Deputy Wood Construction 12/9/2021 Approved JEFF BYTHEWAY
Light Gage Steel Frame 12/9/2021 Not Ready for Inspection JEFF BYTHEWAY
Deputy Wood Construction 12/10/2021 Approved JEFF BYTHEWAY
Drywall Nailing 12/10/2021 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 12/20/2021 Partial Approval JEFF BYTHEWAY
Wood Frame 12/28/2021 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 1/12/2022 Approved JEFF BYTHEWAY
Wood Frame 1/12/2022 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 1/21/2022 Approved JEFF BYTHEWAY
SUSMP-Std. Urban Storm Water 1/21/2022 Approved JEFF BYTHEWAY
Wood Frame 1/21/2022 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 1/24/2022 Approved JEFF BYTHEWAY
Deputy Wood Construction 1/25/2022 Approved JEFF BYTHEWAY
Deputy Wood Construction 1/26/2022 Approved JEFF BYTHEWAY
Deputy Wood Construction 1/27/2022 Approved JEFF BYTHEWAY
Insulation 1/27/2022 Partial Inspection JEFF BYTHEWAY
Deputy Wood Construction 1/28/2022 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 2/4/2022 Partial Approval JEFF BYTHEWAY
Insulation 2/4/2022 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 2/4/2022 Corrections Issued JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 2/9/2022 Not Ready for Inspection JEFF BYTHEWAY
Insulation 2/9/2022 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 2/9/2022 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 2/11/2022 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 2/16/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 2/22/2022 Not Ready for Inspection JEFF BYTHEWAY
Insulation 2/22/2022 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 2/25/2022 Partial Approval JEFF BYTHEWAY
Insulation 2/25/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 3/2/2022 Partial Inspection JEFF BYTHEWAY
Insulation 3/2/2022 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 3/2/2022 Partial Inspection DAVID TSAU
Drywall Nailing 3/7/2022 Partial Approval JEFF BYTHEWAY
Insulation 3/7/2022 Not Ready for Inspection JEFF BYTHEWAY
Interior/Exterior Lathing 3/7/2022 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 3/10/2022 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 3/11/2022 Partial Approval JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 3/17/2022 Not Ready for Inspection JEFF BYTHEWAY
Insulation 3/17/2022 Partial Approval JEFF BYTHEWAY
Wood Frame 3/17/2022 Not Ready for Inspection JEFF BYTHEWAY
Interior/Exterior Lathing 3/22/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 3/23/2022 Partial Approval JEFF BYTHEWAY
Insulation 3/23/2022 Partial Approval JEFF BYTHEWAY
Insulation 3/24/2022 Not Ready for Inspection JEFF BYTHEWAY
Insulation 3/30/2022 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 3/30/2022 Partial Approval JEFF BYTHEWAY
Insulation 3/31/2022 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 3/31/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 4/5/2022 Partial Approval JEFF BYTHEWAY
Insulation 4/5/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 4/12/2022 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 4/13/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 4/14/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 4/15/2022 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 4/18/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 4/25/2022 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 4/26/2022 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 4/26/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 4/28/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 5/2/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 5/10/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 5/12/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 5/17/2022 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 5/19/2022 Approved JEFF BYTHEWAY
Interior/Exterior Lathing 5/24/2022 Approved JEFF BYTHEWAY
Drywall Nailing 6/2/2022 Partial Approval JEFF BYTHEWAY
Wood Frame 6/9/2022 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 6/16/2022 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 7/1/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 7/14/2022 Partial Approval JEFF BYTHEWAY
Reinforced Masonry Frame 7/29/2022 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 8/2/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 8/17/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 8/31/2022 Not Ready for Inspection JEFF BYTHEWAY
Light Gage Steel Frame 8/31/2022 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/2/2022 Approved JEFF BYTHEWAY
Drywall Nailing 10/13/2022 Partial Approval JEFF BYTHEWAY
Interior/Exterior Lathing 10/25/2022 Partial Approval SORIN CIRSTOIU
Interior/Exterior Lathing 11/18/2022 Approved DERRICK SPENCER
Interior/Exterior Lathing 12/15/2022 Approved DERRICK SPENCER
Special/Order Compliance 1/20/2023 Approved DERRICK SPENCER
Masonry Wall/Backfill 1/24/2023 Not Ready for Inspection DERRICK SPENCER
Final 4/25/2023 Not Ready for Inspection DERRICK SPENCER
Green Building Final 4/25/2023 Not Ready for Inspection DERRICK SPENCER
Reinforced Concrete Frame 4/25/2023 Approved DERRICK SPENCER
Reinforced Masonry Frame 4/25/2023 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 4/25/2023 SGSOV Approved DERRICK SPENCER
Smoke Detectors 4/25/2023 Approved DERRICK SPENCER
Final 5/3/2023 Not Ready for Inspection DERRICK SPENCER
Green Building Final 5/3/2023 Not Ready for Inspection DERRICK SPENCER
Verify Rec and Parks Fee Memo 5/5/2023 Not Ready for Inspection NICK LAROCCA
Final 5/12/2023 Partial Inspection NICK LAROCCA
Green Building Final 5/12/2023 Not Ready for Inspection NICK LAROCCA
Final 5/16/2023 Not Ready for Inspection DERRICK SPENCER
Green Building Final 5/16/2023 Approved DERRICK SPENCER
Final 7/27/2023 OK to Issue CofO DERRICK SPENCER
Pre-Inspection 7/31/2023 Approved DERRICK SPENCER
Pre-Inspection 8/1/2023 Approved DERRICK SPENCER
Final 8/4/2023 OK to Issue CofO DERRICK SPENCER