3545 W WILSHIRE BLVD 90010

Certificate Information: 3545 W WILSHIRE BLVD 90010

Application / Permit
18010-10000-00190
Plan Check / Job No.
B18LA00998
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PROPOSED MIXED USE HIGHRISE BUILDINGS : 2 TOWERS - 22 STORY (South Tower) AND 14 STORY (North Tower) 428 APARTMENT UNITS AND 5 LEVELS OF PARKING STRUCTURE WITH GROUND LEVEL RETAIL SPACES, TYPE IA CONSTRUCTION (see comment field)
Permit Issued
Issued on 4/22/2022
Issuing Office
Metro
Current Status
CofO Issued on 6/25/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/26/2018 APPLICANT
Assigned to Plan Check Engineer 3/16/2018 JOHN VASQUEZ
Corrections Issued 3/27/2018 JOHN VASQUEZ
Quality Review Completed 3/28/2018 ALLEN MANALANSAN
Building Plans Picked Up 3/29/2018 APPLICANT
Applicant returned to address corrections 8/22/2018 JOHN VASQUEZ
Applicant returned to address corrections 9/10/2018 MONICA RAMIREZ
Applicant returned to address corrections 3/31/2022 SUEN LIEU
Applicant returned to address corrections 4/4/2022 SUEN LIEU
Applicant returned to address corrections 4/5/2022 SUEN LIEU
Applicant returned to address corrections 4/7/2022 SUEN LIEU
Applicant returned to address corrections 4/8/2022 SUEN LIEU
Applicant returned to address corrections 4/18/2022 SUEN LIEU
Plan Check Approved 4/19/2022 SUEN LIEU
Issued 4/22/2022 APPLICANT
TCO Issued (Expire Date: 12-08-2024) 6/11/2024 ERNESTO CORRAL
TCO Issued (Expire Date: 06-08-2025) 12/10/2024 ADAM BURGESS
Permit Finaled 6/25/2025 ERNESTO CORRAL
CofO Issued 6/25/2025 ERNESTO CORRAL
Permit Finaled 6/25/2025 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 2/24/2021 WALLIE JONG
Permit Cleared 2/24/2021 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 2/25/2021 WALLIE JONG
Highway dedication Cleared 10/21/2021 WALLIE JONG
Driveway location Cleared 10/27/2021 PETE EYRE
Internal circulation Cleared 10/27/2021 PETE EYRE
Sewer availability Cleared 11/1/2021 WALLIE JONG
Low Impact Development Cleared 12/21/2021 IDA MEISAMI-FARD
Stormwater Pollution Mitigatn Cleared 12/21/2021 IDA MEISAMI-FARD
Bicycle Parking Cleared 1/6/2022 MSTAFA AL-MSARI
Encroachment in public way Cleared 1/6/2022 MSTAFA AL-MSARI
Building over 3-story or 36-ft Cleared 1/12/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 1/12/2022 CALOSHA APPROVED
Roof/Waste drainage to street Cleared 1/20/2022 TREVOR QUAN
Green Code Cleared 2/3/2022 AARON COSTA
Abandoned oil well Cleared 2/7/2022 KURT CORRAL
Hydrant and Access approval Cleared 2/7/2022 KURT CORRAL
"T" removal Cleared 2/10/2022 RUBEN VASQUEZ
CPC Cleared 2/10/2022 RUBEN VASQUEZ
Opn space landscape/Water mgmt Cleared 2/10/2022 RUBEN VASQUEZ
Tract Map conditions Cleared 2/10/2022 RUBEN VASQUEZ
Trees in Parkway Cleared 2/10/2022 ADALBERTO VERA
ZA Case Cleared 2/10/2022 RUBEN VASQUEZ
ZA Case Cleared 2/10/2022 RUBEN VASQUEZ
ZA Case Cleared 2/10/2022 RUBEN VASQUEZ
ZA Case Cleared 2/10/2022 RUBEN VASQUEZ
"Q" conditions Cleared 2/17/2022 RUBEN VASQUEZ
CPC Cleared 2/17/2022 RUBEN VASQUEZ
Miscellaneous Cleared 2/17/2022 RUBEN VASQUEZ
Site Plan review Cleared 2/17/2022 RUBEN VASQUEZ
Work Adjacent to Public Way Cleared 2/17/2022 JOSE RODRIGUEZ
Historic Resource Verification Cleared 2/24/2022 DAVID URITA
Project located in CRA area Cleared 2/24/2022 DAVID URITA
ZI Cleared 2/24/2022 DAVID URITA
Fire Marshall Fire Life Safety Cleared 3/2/2022 MENOA AGHAJANI
DAS Clearance Cleared 3/3/2022 JOHN VASQUEZ
Metro Rail approval Cleared 3/28/2022 JOHN VASQUEZ

Contact Information

Architect Minyard,, Charles Nolan; Lic. No.: C33826 650 NORTH CANBRIDGE      ORANGE, CA 92867
Architect Schlossberg,, Larry H; Lic. No.: C17410 GRUEN ASSOCIATES   6330 SAN VICENTE BLVD. STE. 200    LOS ANGELES, CA 90048
Architect Tucker,, Timothy Alan; Lic. No.: C19103 16934 EASTWOOD AVENUE      TORRANCE, CA 90504
Contractor Hunt Construction Group Inc; Lic. No.: 136502-B 7720 N 16TH STREET STE 100      PHOENIX, AZ 85020
Engineer Curtis,, David Jesse; Lic. No.: C75791 330 W 11TH ST APT 709      LOS ANGELES, CA 90015
Engineer Mirahsani,, Ramin; Lic. No.: S6327 10500 NE 8TH ST STE 800      BELLEVUE, WA 98004
Engineer Tang,, Stanley Siu Kei; Lic. No.: C56178 1105 N AVON STREET      BURBANK, CA 91505
Engineer Waggoner,, Michael Alan; Lic. No.: S3738 10641 BENT TREE RD      SANTA ANA, CA 92705
Geologist Grasse,, Scott Wickliffe; Lic. No.: GEO9878 4209 E VERMONT ST      LONG BEACH, CA 90814
Landscape Architect Howell,, Dean Edward; Lic. No.: LA5765 851 N OGDEN DR      LOS ANGELES, CA 90046

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/27/2022 Not Ready for Inspection TED RIES
METHANE-Barrier 5/27/2022 Not Ready for Inspection TED RIES
METHANE-Subgrade 5/27/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 6/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/14/2022 Conditional Approval TED RIES
Footing/Foundation/Slab 6/14/2022 Partial Approval TED RIES
METHANE-Barrier 6/14/2022 Not Ready for Inspection TED RIES
METHANE-Subgrade 6/14/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 6/15/2022 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 6/15/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/22/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/22/2022 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 6/22/2022 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 6/22/2022 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/24/2022 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 6/24/2022 Not Ready for Inspection ERNESTO CORRAL
METHANE-Subgrade 6/24/2022 Not Ready for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 6/30/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 6/30/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Other (see comments) 7/8/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/8/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/8/2022 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/8/2022 Partial Approval DAVID BURKHEAD
METHANE-Barrier 7/8/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 7/8/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 7/11/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/12/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/13/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/13/2022 Conditional Approval TED RIES
Green Building Rough 7/13/2022 Not Ready for Inspection TED RIES
METHANE-Rough 7/13/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/13/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/13/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/14/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/15/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/15/2022 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/15/2022 Partial Approval TED RIES
Green Building Rough 7/15/2022 Not Ready for Inspection TED RIES
METHANE-Rough 7/15/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/15/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/15/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/18/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/19/2022 Conditional Approval WINSTON DUNNING
Green Building Rough 7/19/2022 Not Ready for Inspection TED RIES
METHANE-Rough 7/19/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/19/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/19/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/20/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 7/20/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/22/2022 Conditional Approval TED RIES
Green Building Rough 7/22/2022 Not Ready for Inspection TED RIES
METHANE-Rough 7/22/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/22/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/22/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 7/25/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/27/2022 Conditional Approval TED RIES
Green Building Rough 7/27/2022 Not Ready for Inspection TED RIES
METHANE-Rough 7/27/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/27/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/27/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/28/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/29/2022 Conditional Approval TED RIES
Green Building Rough 7/29/2022 Not Ready for Inspection TED RIES
METHANE-Rough 7/29/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 7/29/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/29/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 8/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/9/2022 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/9/2022 Partial Approval GREGORY POMISH
METHANE-Barrier 8/9/2022 Not Ready for Inspection GREGORY POMISH
METHANE-Subgrade 8/9/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/10/2022 Conditional Approval GREGORY POMISH
Green Building Rough 8/10/2022 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 8/10/2022 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 8/10/2022 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 8/10/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/11/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/12/2022 Conditional Approval TED RIES
Green Building Rough 8/12/2022 Not Ready for Inspection TED RIES
METHANE-Rough 8/12/2022 Partial Inspection TED RIES
Reinforced Concrete Frame 8/12/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 8/12/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 8/15/2022 No Result Entered DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/17/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/18/2022 Conditional Approval GREGORY POMISH
Green Building Rough 8/18/2022 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 8/18/2022 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 8/18/2022 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 8/18/2022 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/19/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 8/19/2022 Partial Approval TED RIES
Structural Steel Frame 8/19/2022 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/22/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/22/2022 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/23/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/23/2022 Conditional Approval TED RIES
Deputy Seismic Resistance 8/23/2022 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/24/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/24/2022 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/25/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/25/2022 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/26/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/26/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/29/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/29/2022 Conditional Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 8/29/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 8/30/2022 Conditional Approval TED RIES
Green Building Rough 8/30/2022 Conditional Approval TED RIES
METHANE-Rough 8/30/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 8/30/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 8/30/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/1/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/2/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/6/2022 Conditional Approval TED RIES
Green Building Rough 9/6/2022 Conditional Approval TED RIES
METHANE-Rough 9/6/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 9/6/2022 Conditional Approval TED RIES
Verify Sprinkler Sign Off 9/6/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/12/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 9/12/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 9/13/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 9/15/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/16/2022 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 9/16/2022 Partial Approval NICK DANERI
Deputy Reinf. Concrete 9/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/20/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 9/20/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 9/21/2022 Not Ready for Inspection TED RIES
METHANE-Rough 9/21/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 9/21/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 9/21/2022 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 9/22/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/22/2022 Conditional Approval TED RIES
Deputy Steel/Welding 9/22/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 9/22/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 9/23/2022 Conditional Approval TED RIES
Deputy Steel/Welding 9/23/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 9/23/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/26/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 9/28/2022 Conditional Approval TED RIES
METHANE-Rough 9/28/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 9/28/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 9/28/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 9/30/2022 Partial Approval TED RIES
Green Building Rough 9/30/2022 Not Ready for Inspection TED RIES
METHANE-Rough 9/30/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 9/30/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 9/30/2022 Not Ready for Inspection TED RIES
Deputy Pre-Stress Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 10/4/2022 Not Ready for Inspection TED RIES
METHANE-Rough 10/4/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/4/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 10/4/2022 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 10/12/2022 Partial Approval TED RIES
Deputy Pre-Stress Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 10/14/2022 Partial Approval TED RIES
Green Building Rough 10/19/2022 Not Ready for Inspection TED RIES
METHANE-Rough 10/19/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 10/19/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 10/19/2022 Not Ready for Inspection TED RIES
Special/Order Compliance 10/20/2022 Partial Approval TED RIES
Reinforced Concrete Frame 10/21/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 10/26/2022 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 10/26/2022 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/26/2022 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 10/27/2022 Partial Approval TED RIES
Reinforced Concrete Frame 10/27/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 11/2/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 11/3/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 11/3/2022 Not Ready for Inspection TED RIES
METHANE-Rough 11/3/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 11/3/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 11/3/2022 Not Ready for Inspection TED RIES
Footing/Foundation/Slab 11/4/2022 Partial Approval TED RIES
METHANE-Barrier 11/4/2022 Not Ready for Inspection TED RIES
METHANE-Subgrade 11/4/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Other (see comments) 11/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/10/2022 Conditional Approval TED RIES
Deputy Steel/Welding 11/10/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Reinforced Concrete Frame 11/14/2022 Partial Approval MARK FERRARI
Deputy Reinf. Concrete 11/15/2022 Conditional Approval TED RIES
Deputy Steel/Welding 11/15/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/16/2022 Conditional Approval TED RIES
Deputy Steel/Welding 11/16/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/17/2022 Conditional Approval TED RIES
Green Building Rough 11/17/2022 Not Ready for Inspection TED RIES
METHANE-Rough 11/17/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 11/17/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 11/17/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/18/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 11/21/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 11/22/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 11/28/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/28/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 11/28/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/28/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 11/28/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 11/29/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/30/2022 Conditional Approval TED RIES
Deputy Steel/Welding 11/30/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 11/30/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 12/1/2022 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 12/2/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/5/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/5/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 12/5/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 12/6/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/7/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/7/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/8/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/8/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/9/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/9/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/9/2022 Partial Approval TED RIES
Masonry Wall/Backfill 12/9/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/12/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/12/2022 Conditional Approval TED RIES
Green Building Rough 12/12/2022 Not Ready for Inspection TED RIES
METHANE-Rough 12/12/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 12/12/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 12/12/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 12/13/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/13/2022 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/13/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/14/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/14/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/15/2022 Conditional Approval TED RIES
Reinforced Concrete Frame 12/15/2022 Partial Approval TED RIES
Deputy Reinf. Concrete 12/16/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 12/16/2022 Partial Inspection TED RIES
Deputy Reinf. Concrete 12/19/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/19/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/19/2022 Not Ready for Inspection TED RIES
METHANE-Rough 12/19/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 12/19/2022 Partial Approval TED RIES
Verify Sprinkler Sign Off 12/19/2022 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 12/20/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/20/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/22/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/22/2022 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/22/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/23/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/23/2022 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/23/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/23/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/23/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/23/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 12/27/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/28/2022 Conditional Approval TED RIES
Deputy Steel/Welding 12/28/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/29/2022 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 12/29/2022 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/29/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/29/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/29/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/3/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/4/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/4/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/4/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 1/5/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/6/2023 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/6/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/6/2023 Conditional Approval TED RIES
Green Building Rough 1/6/2023 Conditional Approval TED RIES
METHANE-Rough 1/6/2023 Conditional Approval TED RIES
Reinforced Concrete Frame 1/6/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 1/6/2023 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/11/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/11/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/11/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/12/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/12/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/12/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 1/13/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/13/2023 Conditional Approval TED RIES
Light Gage Steel Frame 1/17/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 1/18/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/18/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/18/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/18/2023 Partial Approval TED RIES
Green Building Rough 1/18/2023 Not Ready for Inspection TED RIES
METHANE-Rough 1/18/2023 Conditional Approval TED RIES
Reinforced Concrete Frame 1/18/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 1/18/2023 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 1/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/19/2023 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 1/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/20/2023 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 1/20/2023 Conditional Approval NICK DANERI
Deputy Steel/Welding 1/20/2023 Conditional Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 1/20/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 1/23/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/23/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/24/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/24/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/24/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/25/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 1/25/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/25/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 1/25/2023 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/27/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/27/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/30/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/30/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/30/2023 Conditional Approval TED RIES
Insulation 1/30/2023 Partial Approval TED RIES
Light Gage Steel Frame 1/30/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/31/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/31/2023 Conditional Approval TED RIES
Deputy Steel/Welding 1/31/2023 Conditional Approval TED RIES
Insulation 1/31/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 1/31/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 2/1/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/1/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/1/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/1/2023 Partial Approval TED RIES
Insulation 2/1/2023 Partial Approval TED RIES
Special/Order Compliance 2/1/2023 Partial Inspection ALFREDO LOPEZ
Deputy Drilled-In Anchors 2/2/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/2/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/2/2023 Conditional Approval TED RIES
Green Building Rough 2/2/2023 Not Ready for Inspection TED RIES
METHANE-Rough 2/2/2023 Conditional Approval TED RIES
Reinforced Concrete Frame 2/2/2023 Partial Approval TED RIES
Verify Sprinkler Sign Off 2/2/2023 Approved TED RIES
Deputy Drilled-In Anchors 2/6/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/6/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/7/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/7/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 2/7/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/7/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/7/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/9/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2023 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/9/2023 Partial Approval JAMES POWERS
Green Building Rough 2/9/2023 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/9/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/9/2023 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/10/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 2/10/2023 Partial Approval TED RIES
METHANE-Barrier 2/10/2023 Conditional Approval TED RIES
METHANE-Subgrade 2/10/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/14/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/14/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/14/2023 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 2/14/2023 Partial Approval GREGORY POMISH
Structural Steel Frame 2/14/2023 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 2/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/16/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/16/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/16/2023 Conditional Approval GREGORY POMISH
Green Building Rough 2/16/2023 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 2/16/2023 Approved GREGORY POMISH
Reinforced Concrete Frame 2/16/2023 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/17/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/17/2023 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/17/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/17/2023 Partial Approval GREGORY POMISH
METHANE-Barrier 2/17/2023 Conditional Approval GREGORY POMISH
METHANE-Subgrade 2/17/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/22/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/22/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/22/2023 Partial Approval TED RIES
Structural Steel Frame 2/22/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 2/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/23/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/23/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/23/2023 Corrections Issued EDWIN GREGORYONA
Deputy Reinf. Concrete 2/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 2/28/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/28/2023 Conditional Approval TED RIES
Deputy Steel/Welding 2/28/2023 Conditional Approval TED RIES
Green Building Rough 2/28/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 2/28/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/3/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/3/2023 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/3/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/3/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/9/2023 Conditional Approval MICHAEL ROSENBERG
Green Building Rough 3/9/2023 Not Ready for Inspection TED RIES
Light Gage Steel Frame 3/9/2023 Partial Approval TED RIES
Reinforced Concrete Frame 3/9/2023 Not Ready for Inspection TED RIES
Deputy Drilled-In Anchors 3/10/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/10/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/10/2023 Conditional Approval TED RIES
Light Gage Steel Frame 3/10/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/14/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/14/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/15/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/15/2023 Conditional Approval TED RIES
Light Gage Steel Frame 3/15/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 3/16/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/16/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/17/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/17/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/21/2023 Conditional Approval TED RIES
Deputy Steel/Welding 3/21/2023 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 3/21/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 3/23/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/23/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/23/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 3/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/29/2023 Conditional Approval TED RIES
Drywall Nailing 3/29/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 3/30/2023 Conditional Approval TED RIES
Green Building Rough 3/30/2023 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/30/2023 Partial Approval JAMES POWERS
Structural Steel Frame 3/30/2023 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 4/3/2023 Conditional Approval TED RIES
Light Gage Steel Frame 4/3/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 4/4/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/4/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/10/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/10/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/11/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/11/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/12/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/12/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/12/2023 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 4/12/2023 Corrections Issued DAVID BURKHEAD
Deputy Drilled-In Anchors 4/14/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/14/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/14/2023 Conditional Approval TED RIES
Drywall Nailing 4/14/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 4/17/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 4/17/2023 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 4/17/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/18/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/18/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/19/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/19/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 4/19/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/20/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/21/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/21/2023 Conditional Approval TED RIES
Green Building Rough 4/21/2023 Not Ready for Inspection TED RIES
Light Gage Steel Frame 4/21/2023 Partial Approval TED RIES
Reinforced Concrete Frame 4/21/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 4/25/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/25/2023 Conditional Approval TED RIES
Deputy Steel/Welding 4/25/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 4/25/2023 Not Ready for Inspection TED RIES
METHANE-Barrier 4/25/2023 Conditional Approval TED RIES
METHANE-Subgrade 4/25/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/26/2023 Partial Approval NICK DANERI
Deputy Steel/Welding 4/26/2023 Conditional Approval NICK DANERI
Footing/Foundation/Slab 4/26/2023 Partial Approval NICK DANERI
Green Building Rough 4/26/2023 Conditional Approval NICK DANERI
METHANE-Barrier 4/26/2023 Conditional Approval NICK DANERI
METHANE-Subgrade 4/26/2023 Conditional Approval NICK DANERI
Reinforced Concrete Frame 4/26/2023 Partial Approval NICK DANERI
Deputy Reinf. Concrete 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/28/2023 No Access for Inspection TED RIES
Deputy Steel/Welding 4/28/2023 No Access for Inspection TED RIES
Deputy Reinf. Concrete 5/1/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/1/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 5/1/2023 Partial Approval TED RIES
METHANE-Barrier 5/1/2023 Approved TED RIES
METHANE-Subgrade 5/1/2023 Approved TED RIES
Deputy Reinf. Concrete 5/2/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/2/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/3/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/3/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/4/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/4/2023 Conditional Approval TED RIES
Drywall Nailing 5/4/2023 Corrections Issued TED RIES
Deputy Reinf. Concrete 5/8/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/8/2023 Conditional Approval TED RIES
Light Gage Steel Frame 5/8/2023 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 5/9/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/9/2023 Conditional Approval TED RIES
Light Gage Steel Frame 5/9/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 5/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/10/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 5/10/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/10/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/12/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/12/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/16/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/16/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/16/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/16/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/17/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/17/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 5/17/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/17/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/17/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 5/19/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/19/2023 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/19/2023 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 5/22/2023 Approved RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/22/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/22/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 5/22/2023 Partial Approval RAFAEL ESPINOZA
Green Building Rough 5/22/2023 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 5/22/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/22/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/23/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/23/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/23/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/24/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/24/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 5/24/2023 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 5/24/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/24/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 5/24/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/25/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 5/25/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 5/25/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 5/25/2023 Partial Approval RAFAEL ESPINOZA
Insulation 5/25/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 5/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/26/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/30/2023 Conditional Approval TED RIES
Deputy Steel/Welding 5/30/2023 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 5/30/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 5/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/1/2023 Conditional Approval TED RIES
Deputy Steel/Welding 6/1/2023 Conditional Approval TED RIES
Green Building Rough 6/1/2023 Not Ready for Inspection TED RIES
Insulation 6/1/2023 Not Ready for Inspection TED RIES
Light Gage Steel Frame 6/1/2023 Partial Approval TED RIES
Reinforced Concrete Frame 6/1/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 6/2/2023 Conditional Approval TED RIES
Deputy Shotcrete 6/2/2023 Conditional Approval TED RIES
Deputy Steel/Welding 6/2/2023 Conditional Approval TED RIES
Light Gage Steel Frame 6/2/2023 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/6/2023 Conditional Approval TED RIES
Deputy Steel/Welding 6/6/2023 Conditional Approval TED RIES
Light Gage Steel Frame 6/6/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 6/7/2023 Conditional Approval TED RIES
Deputy Steel/Welding 6/7/2023 Conditional Approval TED RIES
Green Building Rough 6/7/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 6/7/2023 Partial Inspection TED RIES
Deputy Reinf. Concrete 6/8/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/8/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 6/8/2023 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/8/2023 Partial Approval RAFAEL ESPINOZA
Insulation 6/8/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/9/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/9/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/9/2023 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 6/9/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/12/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/12/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 6/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/14/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/14/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/14/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/16/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/16/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/16/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/16/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 6/16/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/20/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 6/20/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/21/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/21/2023 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/21/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/21/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/22/2023 Conditional Approval TIMOTHY POWELL
Deputy Steel/Welding 6/22/2023 Conditional Approval TIMOTHY POWELL
Light Gage Steel Frame 6/22/2023 Partial Approval TIMOTHY POWELL
Deputy Reinf. Concrete 6/23/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/23/2023 Conditional Approval RAFAEL ESPINOZA
Insulation 6/23/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 6/26/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/26/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/26/2023 Partial Approval RAFAEL ESPINOZA
Green Building Rough 6/26/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 6/27/2023 Conditional Approval TED RIES
Deputy Steel/Welding 6/27/2023 Conditional Approval TED RIES
Footing/Foundation/Slab 6/27/2023 Partial Inspection TED RIES
Light Gage Steel Frame 6/27/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 6/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 6/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 6/29/2023 No Access for Inspection TED RIES
Deputy Steel/Welding 6/29/2023 No Access for Inspection TED RIES
Deputy Reinf. Concrete 7/6/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/6/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/6/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/6/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/7/2023 Approved DAVID BURKHEAD
Drywall Nailing 7/7/2023 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/7/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/7/2023 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 7/8/2023 Off-Hour Fees Due
Deputy Reinf. Concrete 7/10/2023 Conditional Approval TED RIES
Deputy Steel/Welding 7/10/2023 Conditional Approval TED RIES
Drywall Nailing 7/10/2023 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/10/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 7/12/2023 Conditional Approval TED RIES
Deputy Steel/Welding 7/12/2023 Conditional Approval TED RIES
Light Gage Steel Frame 7/12/2023 Partial Approval TED RIES
Deputy Reinf. Concrete 7/14/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/14/2023 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/14/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/18/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/18/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/18/2023 Conditional Approval TED RIES
Light Gage Steel Frame 7/18/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 7/19/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/19/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/19/2023 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/19/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 7/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 7/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/20/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 7/20/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/20/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 7/21/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 7/21/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/21/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 7/21/2023 Partial Approval RAFAEL ESPINOZA
Insulation 7/21/2023 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 7/22/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/24/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/24/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/24/2023 Conditional Approval TED RIES
Deputy Shotcrete 7/24/2023 Conditional Approval TED RIES
Drywall Nailing 7/24/2023 Partial Approval TED RIES
Light Gage Steel Frame 7/24/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 7/25/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 7/25/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/25/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/25/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/25/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/25/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 7/26/2023 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 7/26/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/26/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/26/2023 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/26/2023 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 7/28/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 7/28/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/28/2023 Conditional Approval TED RIES
Deputy Shotcrete 7/28/2023 Conditional Approval TED RIES
Deputy Steel/Welding 7/28/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 7/28/2023 Not Ready for Inspection TED RIES
Light Gage Steel Frame 7/28/2023 Partial Approval TED RIES
Reinforced Concrete Frame 7/28/2023 Partial Approval TED RIES
Deputy Steel/Welding 7/31/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/1/2023 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 8/1/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 8/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/2/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/2/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/3/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/3/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/3/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/3/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 8/3/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/4/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/4/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/4/2023 Conditional Approval TED RIES
Deputy Shotcrete 8/4/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 8/7/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/7/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/7/2023 Conditional Approval TED RIES
Deputy Shotcrete 8/7/2023 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 8/7/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 8/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 8/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 8/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 8/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 8/10/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 8/10/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 8/10/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 8/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/11/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/14/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 8/14/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/14/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/15/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/15/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/15/2023 Conditional Approval TED RIES
Deputy Steel/Welding 8/15/2023 Conditional Approval TED RIES
Drywall Nailing 8/15/2023 Partial Approval TED RIES
Light Gage Steel Frame 8/15/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 8/16/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/16/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/16/2023 Conditional Approval TED RIES
Deputy Steel/Welding 8/16/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 8/17/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/17/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/17/2023 Conditional Approval TED RIES
Deputy Steel/Welding 8/17/2023 Conditional Approval TED RIES
Deputy Drilled-In Anchors 8/22/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 8/22/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/22/2023 Conditional Approval TED RIES
Deputy Shotcrete 8/22/2023 Conditional Approval TED RIES
Green Building Rough 8/22/2023 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/22/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 8/24/2023 Conditional Approval DARRYL ARNOLD
Deputy Pre-Stress Concrete 8/24/2023 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 8/24/2023 Conditional Approval DARRYL ARNOLD
Deputy Shotcrete 8/24/2023 Conditional Approval DARRYL ARNOLD
Drywall Nailing 8/24/2023 Conditional Approval DARRYL ARNOLD
Light Gage Steel Frame 8/24/2023 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 8/28/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/28/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/28/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/28/2023 Conditional Approval DAVID BURKHEAD
Insulation 8/28/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 8/28/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/29/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/29/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/29/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/29/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/30/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 8/30/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/30/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/30/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 8/31/2023 Conditional Approval VAHE KELEDJIAN
Deputy Pre-Stress Concrete 8/31/2023 Conditional Approval VAHE KELEDJIAN
Deputy Reinf. Concrete 8/31/2023 Conditional Approval VAHE KELEDJIAN
Deputy Shotcrete 8/31/2023 Conditional Approval VAHE KELEDJIAN
Deputy Drilled-In Anchors 9/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/1/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/5/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/5/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/5/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/5/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 9/5/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 9/5/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/6/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/6/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/6/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/6/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/6/2023 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 9/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/7/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/7/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 9/7/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 9/7/2023 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 9/7/2023 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/8/2023 Conditional Approval TED RIES
Deputy Pre-Stress Concrete 9/8/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 9/8/2023 Conditional Approval TED RIES
Deputy Shotcrete 9/8/2023 Conditional Approval TED RIES
Insulation 9/8/2023 Partial Approval TED RIES
Light Gage Steel Frame 9/8/2023 Partial Approval TED RIES
Deputy Drilled-In Anchors 9/11/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/11/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/11/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/11/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 9/11/2023 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 9/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 9/13/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/13/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/13/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/13/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 9/15/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/15/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/15/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 9/15/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/15/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/15/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/18/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/18/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 9/19/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/19/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/19/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/19/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/20/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/21/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/21/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/21/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/21/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 9/22/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/22/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 9/22/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 9/22/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/25/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/26/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/27/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 9/27/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 9/27/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/28/2023 Conditional Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/28/2023 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/29/2023 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 9/29/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 9/29/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 9/29/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/2/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/2/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/3/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/3/2023 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/3/2023 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/4/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/4/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/5/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/5/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/6/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/6/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/6/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/9/2023 Partial Approval LARRY ARNICK
Deputy Pre-Stress Concrete 10/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/10/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/11/2023 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/11/2023 Conditional Approval TED RIES
Insulation 10/11/2023 Partial Approval TED RIES
Light Gage Steel Frame 10/11/2023 Partial Approval TED RIES
Reinforced Concrete Frame 10/11/2023 Partial Approval TED RIES
Deputy Pre-Stress Concrete 10/12/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/12/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 10/12/2023 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 10/12/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 10/12/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/13/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/13/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/16/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/16/2023 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 10/16/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/17/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/17/2023 Conditional Approval RAFAEL ESPINOZA
Insulation 10/17/2023 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/18/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/18/2023 Conditional Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/19/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 10/20/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 10/20/2023 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/20/2023 Partial Approval RAFAEL ESPINOZA
Insulation 10/20/2023 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/20/2023 Partial Approval RAFAEL ESPINOZA
Deputy Pre-Stress Concrete 10/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/23/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Pre-Stress Concrete 10/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 10/25/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/25/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 10/25/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/25/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 10/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 11/2/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/2/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/2/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/2/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/6/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/6/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 11/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/7/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 11/7/2023 Partial Approval NICK DANERI
Footing/Foundation/Slab 11/7/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/8/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 11/9/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/9/2023 Conditional Approval DAVID BURKHEAD
Pre-Inspection 11/9/2023 Partial Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 11/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/14/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/14/2023 Conditional Approval DAVID BURKHEAD
Pre-Inspection 11/14/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/15/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/15/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/15/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/15/2023 Partial Approval DAVID BURKHEAD
Pre-Inspection 11/15/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 11/15/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/16/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/16/2023 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/16/2023 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 11/16/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Pre-Stress Concrete 11/17/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/17/2023 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 11/17/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/20/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/21/2023 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/21/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/21/2023 Conditional Approval DAVID BURKHEAD
Green Building Rough 11/21/2023 Not Ready for Inspection DAVID BURKHEAD
Light Gage Steel Frame 11/21/2023 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 11/21/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/22/2023 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/22/2023 Conditional Approval NICK DANERI
Light Gage Steel Frame 11/22/2023 Order to Comply Issued NICK DANERI
Deputy Pre-Stress Concrete 11/27/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/27/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/27/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/27/2023 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/27/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 11/29/2023 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/29/2023 Conditional Approval NICK DANERI
Deputy Steel/Welding 11/29/2023 Conditional Approval NICK DANERI
Drywall Nailing 11/29/2023 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 11/30/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/30/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 11/30/2023 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 11/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 11/30/2023 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 12/1/2023 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/4/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Pre-Stress Concrete 12/7/2023 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/7/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 12/7/2023 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/7/2023 Partial Approval DAVID BURKHEAD
Green Building Rough 12/7/2023 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 12/7/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/12/2023 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 12/12/2023 Partial Approval GREGORY POMISH
Drywall Nailing 12/13/2023 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/14/2023 Partial Approval JAMES POWERS
Green Building Rough 12/14/2023 No Result Entered ERNESTO CORRAL
Reinforced Concrete Frame 12/14/2023 No Result Entered ERNESTO CORRAL
Deputy Reinf. Concrete 12/15/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/15/2023 Conditional Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 12/15/2023 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/15/2023 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 12/18/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/18/2023 Partial Approval DAVID BURKHEAD
Deputy Pre-Stress Concrete 12/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/21/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 12/21/2023 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/21/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/27/2023 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/27/2023 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 12/27/2023 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/3/2024 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/3/2024 Conditional Approval LARRY ARNICK
Drywall Nailing 1/3/2024 Partial Approval LARRY ARNICK
Green Building Rough 1/3/2024 Partial Approval LARRY ARNICK
Light Gage Steel Frame 1/3/2024 Partial Approval LARRY ARNICK
Reinforced Concrete Frame 1/3/2024 Partial Approval LARRY ARNICK
Deputy Steel/Welding 1/4/2024 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 1/4/2024 Partial Approval LARRY ARNICK
Deputy Shotcrete 1/5/2024 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/5/2024 Conditional Approval DAVID BURKHEAD
Interior/Exterior Lathing 1/5/2024 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/8/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/10/2024 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/10/2024 Conditional Approval DAVID BURKHEAD
Green Building Rough 1/10/2024 Approved DAVID BURKHEAD
Light Gage Steel Frame 1/10/2024 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 1/10/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/11/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/11/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/12/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/12/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/17/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/17/2024 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 1/18/2024 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 1/18/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/19/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/19/2024 Conditional Approval MICHAEL ROSENBERG
Structural Steel Frame 1/26/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/31/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2024 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/15/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/21/2024 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 2/27/2024 Partial Approval DAVID BURKHEAD
Insulation 2/27/2024 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 2/27/2024 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/7/2024 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/14/2024 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 5/2/2024 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/3/2024 Not Ready for Inspection DAVID BURKHEAD
Final 5/8/2024 Corrections Issued DAVID BURKHEAD
Footing/Foundation/Slab 5/8/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 5/8/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/8/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/8/2024 SGSOV Not Ready DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 5/8/2024 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 5/8/2024 Not Ready for Inspection DAVID BURKHEAD
Final 5/17/2024 Corrections Issued DAVID BURKHEAD
Footing/Foundation/Slab 5/17/2024 Approved DAVID BURKHEAD
Green Building Final 5/17/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/17/2024 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/17/2024 SGSOV Not Ready DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 5/17/2024 Not Ready for Inspection DAVID BURKHEAD
Smoke Detectors 5/17/2024 Not Ready for Inspection DAVID BURKHEAD
Final 5/22/2024 Corrections Issued DAVID BURKHEAD
Green Building Final 5/22/2024 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 5/22/2024 Approved DAVID BURKHEAD
Reinforced Concrete Frame 5/22/2024 Approved DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 5/22/2024 SGSOV Approved DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 5/22/2024 Conditional Approval DAVID BURKHEAD
Smoke Detectors 5/22/2024 Partial Approval DAVID BURKHEAD
Pre-Inspection 5/23/2024 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 5/30/2024 Partial Inspection DAVID BURKHEAD
Pre-Inspection 6/3/2024 Partial Inspection DAVID BURKHEAD
Final 6/4/2024 Partial Inspection JEFFREY FULTON
Green Building Final 6/4/2024 Not Ready for Inspection JEFFREY FULTON
SUSMP-Std. Urban Storm Water 6/4/2024 Not Ready for Inspection JEFFREY FULTON
Smoke Detectors 6/4/2024 Not Ready for Inspection JEFFREY FULTON
Pre-Inspection 6/5/2024 Partial Inspection JEFFREY FULTON
Structural Steel Frame 6/6/2024 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 6/7/2024 Partial Approval JEROME BLACKWOOD
Pre-Inspection 6/10/2024 Partial Inspection DAVID BURKHEAD
Final 6/11/2024 OK for TCO DAVID BURKHEAD
Green Building Final 6/11/2024 Approved DAVID BURKHEAD
SUSMP-Std. Urban Storm Water 6/11/2024 Approved DAVID BURKHEAD
Smoke Detectors 6/11/2024 Approved DAVID BURKHEAD
Final 10/10/2024 Corrections Issued DAVID BURKHEAD
Special/Order Compliance 11/13/2024 Approved DAVID BURKHEAD
Special/Order Compliance 5/13/2025 Approved DAVID BURKHEAD
Special/Order Compliance 6/23/2025 Corrections Issued DAVID BURKHEAD