|
Pre-Inspection
|
3/23/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Grading
|
6/17/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/1/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/1/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/2/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/2/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/3/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/3/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/4/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/4/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/7/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/7/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/8/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/8/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/9/2020
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/9/2020
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
12/9/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/10/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/10/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
12/11/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Shotcrete
|
12/11/2020
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
12/16/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
12/28/2020
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Pre-Inspection
|
12/29/2020
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
1/8/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/11/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
1/13/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
1/14/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
1/14/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
1/15/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Green Building Rough
|
1/25/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
1/25/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
1/25/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
1/27/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
2/3/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
2/9/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
2/10/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
2/10/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
2/11/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
2/19/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Masonry
|
2/22/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Masonry Wall/Backfill
|
2/23/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
2/24/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
2/25/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
2/25/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/1/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
3/23/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/25/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
3/26/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Excavation/Setback/Form/Re-Bar
|
3/26/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/8/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
4/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/9/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/9/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
4/12/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/12/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/14/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/27/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/29/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
4/30/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/3/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/4/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/5/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
5/5/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/6/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
5/6/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
5/7/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
5/17/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
5/19/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
5/20/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
5/20/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
5/20/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
5/21/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
5/27/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
5/27/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
6/3/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2021
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
6/9/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
6/10/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
6/11/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
6/22/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
6/23/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
6/28/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
7/8/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
7/8/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
7/15/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
7/22/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
7/28/2021
|
Approved
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
7/30/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/2/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
8/9/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
8/12/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/17/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
8/18/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/27/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
8/30/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/2/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
9/9/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
9/10/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
9/16/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
9/22/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
9/23/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Deputy Wood Construction
|
9/28/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
10/6/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
10/8/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
11/5/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
11/9/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
11/18/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
11/29/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
12/8/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
12/14/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
12/17/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
12/27/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
1/3/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
1/12/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
1/19/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
1/26/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Interior/Exterior Lathing
|
1/28/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
2/1/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
2/10/2022
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
2/16/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
2/25/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
2/25/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/1/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/2/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/7/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Interior/Exterior Lathing
|
3/10/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/14/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/16/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
3/18/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
3/21/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
3/30/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
4/5/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
4/13/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
4/15/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
4/21/2022
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Drywall Nailing
|
4/28/2022
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Light Gage Steel Frame
|
6/21/2022
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Wood Construction
|
7/15/2022
|
Conditional Approval
|
TED RIES
|
|
Wood Frame
|
7/15/2022
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
7/19/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
7/25/2022
|
Approved
|
TED RIES
|
|
Drywall Nailing
|
8/24/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/24/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
10/3/2022
|
Approved
|
TED RIES
|
|
Special/Order Compliance
|
10/20/2022
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/2/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
11/7/2022
|
Approved
|
TED RIES
|
|
Deputy Reinf. Concrete
|
3/15/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/16/2023
|
Conditional Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
3/16/2023
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
3/21/2023
|
Partial Approval
|
TED RIES
|
|
Drywall Nailing
|
3/24/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/28/2023
|
Partial Approval
|
TED RIES
|
|
Light Gage Steel Frame
|
4/13/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Final
|
4/14/2023
|
Corrections Issued
|
TED RIES
|
|
Footing/Foundation/Slab
|
4/14/2023
|
Partial Approval
|
TED RIES
|
|
Green Building Final
|
4/14/2023
|
Partial Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
4/14/2023
|
Partial Approval
|
TED RIES
|
|
Reinforced Masonry Frame
|
4/14/2023
|
Partial Approval
|
TED RIES
|
|
SGSOV-Seismic Gas S/O Valve
|
4/14/2023
|
SGSOV Approved
|
TED RIES
|
|
Smoke Detectors
|
4/14/2023
|
Approved
|
TED RIES
|
|
Final
|
4/26/2023
|
Partial Inspection
|
TED RIES
|
|
Footing/Foundation/Slab
|
4/26/2023
|
Partial Inspection
|
TED RIES
|
|
Green Building Final
|
4/26/2023
|
Partial Inspection
|
TED RIES
|
|
Reinforced Concrete Frame
|
4/26/2023
|
Partial Inspection
|
TED RIES
|
|
Reinforced Masonry Frame
|
4/26/2023
|
Partial Inspection
|
TED RIES
|
|
Special/Order Compliance
|
4/27/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
5/1/2023
|
Partial Inspection
|
TED RIES
|
|
Footing/Foundation/Slab
|
5/1/2023
|
Conditional Approval
|
TED RIES
|
|
Green Building Final
|
5/1/2023
|
Partial Approval
|
TED RIES
|
|
Reinforced Concrete Frame
|
5/1/2023
|
Conditional Approval
|
TED RIES
|
|
Reinforced Masonry Frame
|
5/1/2023
|
Conditional Approval
|
TED RIES
|
|
Special/Order Compliance
|
11/1/2023
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
12/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Final
|
12/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Rec and Parks Fee Memo
|
12/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/7/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/15/2024
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
9/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
2/10/2026
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
4/10/2026
|
OK to Issue CofO
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/10/2026
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
4/10/2026
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/10/2026
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
4/10/2026
|
Approved
|
DAVID BURKHEAD
|