Deputy Drilled-In Anchors
|
1/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2019
|
Partial Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/11/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
2/28/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/4/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
3/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
4/24/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
5/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
5/13/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
5/13/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
5/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
5/22/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
5/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/31/2019
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
6/4/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
6/11/2019
|
Partial Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
6/12/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
6/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
6/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/18/2019
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Drilled-In Anchors
|
6/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
6/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
6/27/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
6/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
6/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/11/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
7/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/19/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Steel/Welding
|
7/19/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
7/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
7/22/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
7/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
7/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
7/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
7/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
7/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
7/30/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
7/31/2019
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Drilled-In Anchors
|
8/1/2019
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
8/1/2019
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Shotcrete
|
8/1/2019
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
8/2/2019
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
8/2/2019
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Shotcrete
|
8/2/2019
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
8/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
8/12/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
8/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
8/22/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
8/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
8/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
9/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
9/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
9/12/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
9/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
9/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
9/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
9/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/1/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
10/2/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/4/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
10/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
10/8/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
10/16/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
10/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
10/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
10/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/1/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
11/4/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
11/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
11/5/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
11/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/7/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
11/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
11/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/19/2019
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
11/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
11/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
11/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
11/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
11/21/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/22/2019
|
Conditional Approval
|
RONALD PACHECO
|
|
Deputy Reinf. Concrete
|
11/22/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
11/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
11/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
11/27/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
12/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
12/2/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/3/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
12/3/2019
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/4/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/4/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/9/2019
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
12/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
12/30/2019
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Drilled-In Anchors
|
12/31/2019
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
1/2/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
1/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
1/6/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/8/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/14/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
1/14/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/15/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/15/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/16/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/16/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/17/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/17/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/21/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/22/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
1/23/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
1/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Shotcrete
|
1/24/2020
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
1/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/30/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/31/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/4/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/5/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/6/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
2/6/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/7/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/14/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/19/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/24/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
2/26/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/27/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/27/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/28/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/2/2020
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Shotcrete
|
3/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/13/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/18/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/19/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/20/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/25/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/26/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/26/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/27/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
4/8/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
4/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
4/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
4/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
4/15/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
7/29/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/17/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
9/22/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
9/25/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/15/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
10/16/2020
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
10/22/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
10/29/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/1/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/2/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
12/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/3/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/4/2020
|
Conditional Approval
|
LANNY MERRICK
|
|
Deputy Reinf. Concrete
|
12/9/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
12/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/10/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
12/11/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
12/11/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
12/11/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/14/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/27/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/29/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Other (see comments)
|
2/11/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
2/11/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
2/12/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
2/12/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
3/8/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/9/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/10/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/11/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
3/12/2021
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Deputy Shotcrete
|
4/7/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
4/8/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
4/9/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Other (see comments)
|
5/14/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
5/14/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
5/26/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
6/1/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
6/2/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
3/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|