607 S PARK VIEW ST 90057

Certificate Information: 607 S PARK VIEW ST 90057

Application / Permit
17016-10003-15610
Plan Check / Job No.
B18LA06078
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
FOUNDATION ONLY EARLY START PERMIT PER IB P/BC 2017-097, FOR BILDING PERMIT 17016-10000-15610.
Permit Issued
Issued on 11/15/2018
Issuing Office
Metro
Current Status
Issued on 11/15/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/29/2018 APPLICANT
Assigned to Plan Check Engineer 3/29/2018 XIAOZHE ZHANG
Corrections Issued 3/29/2018 XIAOZHE ZHANG
Plan Check Approved 4/13/2018 SUEN LIEU
Issued 11/15/2018 LADBS

Permit Application Clearance Information

ZA Case Cleared 4/3/2018 FIPE LEILUA
ZA Case Cleared 4/3/2018 FIPE LEILUA
DAS Clearance Cleared 4/6/2018 XIAOZHE ZHANG
HPOZ Cleared 4/9/2018 LAMBERT GIESSINGER
Historic monument Cleared 4/9/2018 LAMBERT GIESSINGER
Historical monument Cleared 4/10/2018 JIM URQUHART
Project located in CRA area Cleared 4/10/2018 JIM URQUHART
Fire Marshall Fire Life Safety Cleared 4/11/2018 DOMINIQUE MEDINA

Contact Information

Architect Liljegren, Karin J; Lic. No.: C28158 727 W 7TH STREET # 610      LOS ANGELES, CA 90017
Contractor Hopkins George C Construction Co Inc; Lic. No.: 397266-B 919 W GLENOAKS BLVD      GLENDALE, CA 91202
Engineer Adams, Jelisa Thomas; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer Tremayne, William Eijiro; Lic. No.: S5866 130 SUTTER ST STE 400      SAN FRANCISCO, CA 94104

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/14/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/16/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 1/16/2019 Partial Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 1/17/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/18/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/28/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/29/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/30/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 2/11/2019 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 2/28/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/4/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 3/13/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 3/19/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 3/20/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/26/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 3/29/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/29/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/2/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/2/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/11/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/15/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/16/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/16/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/17/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 4/24/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/24/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 4/24/2019 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 4/29/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/3/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 5/3/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/3/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/6/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/6/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/7/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/7/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/9/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 5/10/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 5/13/2019 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 5/13/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 5/16/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/21/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/21/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 5/22/2019 Partial Approval DANIEL COLLINS
Deputy Steel/Welding 5/23/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 5/29/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/29/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/30/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 5/31/2019 Approved DANIEL COLLINS
Reinforced Concrete Frame 6/4/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/5/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/11/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 6/11/2019 Partial Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 6/12/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 6/12/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/14/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 6/14/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/18/2019 Approved HAMID PISHEHVAR
Deputy Drilled-In Anchors 6/25/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/26/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/27/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/27/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 6/27/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 6/28/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/28/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 6/28/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/10/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/11/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/12/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/16/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/16/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/17/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/17/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/19/2019 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 7/19/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/22/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/22/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 7/22/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/23/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 7/23/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 7/23/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/29/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/29/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 7/29/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 7/30/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/30/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 7/30/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 7/31/2019 Approved HAMID PISHEHVAR
Deputy Drilled-In Anchors 8/1/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 8/1/2019 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 8/1/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 8/2/2019 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 8/2/2019 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 8/2/2019 Conditional Approval JEFFREY FULTON
Deputy Drilled-In Anchors 8/6/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/7/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 8/8/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 8/12/2019 Partial Approval DANIEL COLLINS
Deputy Shotcrete 8/20/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 8/20/2019 Partial Approval DANIEL COLLINS
Reinforced Concrete Frame 8/22/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/23/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 8/26/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 8/26/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 8/29/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 8/30/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/5/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 9/10/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/11/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/11/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/12/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/12/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 9/12/2019 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/13/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/13/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/16/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/17/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/18/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/18/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 9/18/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/19/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/19/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 9/19/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/20/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/24/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/25/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/26/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 9/27/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/1/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/2/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/2/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 10/2/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/3/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/4/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/7/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/8/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 10/8/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/9/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/10/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/11/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/15/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/16/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 10/16/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/17/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/18/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/21/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/22/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/22/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/22/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/23/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 10/23/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/23/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/24/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/25/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/28/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/30/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/31/2019 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 10/31/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/1/2019 Conditional Approval KATY RAMIREZ
Reinforced Concrete Frame 11/4/2019 Not Ready for Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 11/5/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/5/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 11/5/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/6/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/6/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/7/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/8/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/12/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/13/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/14/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/14/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/15/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/15/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/18/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/19/2019 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 11/20/2019 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 11/20/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 11/20/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/21/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 11/21/2019 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 11/21/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/22/2019 Conditional Approval RONALD PACHECO
Deputy Reinf. Concrete 11/22/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 11/25/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/26/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 11/26/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 11/27/2019 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/27/2019 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 11/27/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 12/2/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 12/2/2019 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/3/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/3/2019 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 12/3/2019 Not Ready for Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/4/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/5/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/6/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/9/2019 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 12/10/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/11/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/12/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/12/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/12/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/13/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/18/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/19/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/19/2019 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/19/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/20/2019 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 12/30/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 12/31/2019 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 1/2/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 1/3/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/6/2020 Conditional Approval DANIEL COLLINS
Reinforced Concrete Frame 1/6/2020 Partial Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/7/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 1/7/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/8/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/9/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/10/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/10/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/13/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/14/2020 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 1/14/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/15/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/15/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/16/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/16/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/17/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/17/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/21/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/22/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 1/23/2020 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 1/23/2020 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 1/24/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2020 Partial Approval JAMES POWERS
Deputy Shotcrete 1/24/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/28/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/30/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 1/31/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/4/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/4/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/5/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/5/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/6/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/6/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 2/6/2020 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/7/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/7/2020 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 2/14/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/19/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/24/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/26/2020 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 2/26/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 2/27/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/27/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 2/28/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/28/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/2/2020 Conditional Approval JONATHAN QUACH
Deputy Shotcrete 3/9/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/13/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/18/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/19/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/20/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/25/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/26/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/26/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/27/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/8/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/9/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/10/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/10/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/15/2020 Conditional Approval DANIEL COLLINS
Footing/Foundation/Slab 7/29/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/9/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/17/2020 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 9/22/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 9/25/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/15/2020 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 10/16/2020 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/22/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 10/29/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/1/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/2/2020 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 12/3/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/3/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/4/2020 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 12/9/2020 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 12/10/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/10/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/10/2020 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 12/11/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 12/11/2020 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 12/11/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/14/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/27/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 1/29/2021 Conditional Approval KATY RAMIREZ
Deputy Other (see comments) 2/11/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 2/11/2021 Conditional Approval DANIEL COLLINS
Deputy Other (see comments) 2/12/2021 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 2/12/2021 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 3/8/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/9/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/10/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/11/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 3/12/2021 Conditional Approval TIMOTHY BUXTON
Deputy Shotcrete 4/7/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/8/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/9/2021 Conditional Approval KATY RAMIREZ
Deputy Other (see comments) 5/14/2021 Conditional Approval KATY RAMIREZ
Deputy Shotcrete 5/14/2021 Conditional Approval KATY RAMIREZ
Footing/Foundation/Slab 5/26/2021 Partial Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/1/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 6/2/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 3/14/2023 Conditional Approval MICHAEL ROSENBERG