12720 W CASWELL AVE 90066
Certificate Information: 12720 W CASWELL AVE 90066
- Application / Permit
- 17016-10000-37721
- Plan Check / Job No.
- B17LA23220
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 2 SPECIAL CANTILEVERED (BOXED) COLUMN SYSTEM (SCCS) WITH CONCRETE GRADE BEAM. THESE 2 SCCS ARE FOR BOTH ORTHOGONAL DIRECTIONS (NORTH-SOUTH & EAST-WEST). INSTALLATION OF 1 ORDINARY MOMENT FRAME SYSTEM (OMF) WITH CONCRETE TIE BEAM AT EAST SIDE. WORKS ARE AT REAR TUCK-UNDER PARKING AREAS & EXTERIOR SIDE OF WALL, NOT ON TENANTS' UNITS.
- Permit Issued
- Issued on 2/3/2020
- Issuing Office
- Metro
- Current Status
- CofC Issued on 6/15/2026
Permit Application Status History
| Submitted | 12/19/2017 | APPLICANT |
| Assigned to Plan Check Engineer | 12/28/2017 | ERWIN PASCUA |
| Corrections Issued | 12/31/2017 | ERWIN PASCUA |
| Quality Review Completed | 1/5/2018 | SAI KHUM |
| Building Plans Picked Up | 1/17/2018 | APPLICANT |
| Plan Check Approved | 4/17/2018 | ERWIN PASCUA |
| Issued | 2/3/2020 | LADBS |
| OK for CofC | 6/15/2026 | VASIL MIHALEV |
| CofC Issued | 6/15/2026 | VASIL MIHALEV |
Permit Application Clearance Information
| Housing rent stabilization | Cleared | 2/3/2020 | PHILLIP MUNGUIA |
Contact Information
| Contractor | Sal Co Construction; Lic. No.: 779079-B | 2700 CAHUENGA BLVD # 1103 LOS ANGELES, CA 90068 |
| Engineer | Labib, Youhanna T; Lic. No.: S4549 | 209 E EL SEGUNDO BLVD EL SEGUNDO, CA 90245 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 3/12/2020 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/8/2020 | Approved | GRANT WOODS |
| Deputy Drilled-In Anchors | 4/20/2020 | Conditional Approval | GRANT WOODS |
| Deputy Reinf. Masonry | 4/20/2020 | Conditional Approval | GRANT WOODS |
| Deputy Drilled-In Anchors | 4/23/2020 | Conditional Approval | GRANT WOODS |
| Deputy Reinf. Concrete | 4/23/2020 | Conditional Approval | GRANT WOODS |
| Footing/Foundation/Slab | 4/24/2020 | Not Ready for Inspection | SORIN CIRSTOIU |
| Structural Steel Frame | 4/24/2020 | Not Ready for Inspection | SORIN CIRSTOIU |
| Wood Frame | 4/24/2020 | Not Ready for Inspection | SORIN CIRSTOIU |
| Footing/Foundation/Slab | 4/27/2020 | Not Ready for Inspection | GRANT WOODS |
| Structural Steel Frame | 4/27/2020 | Not Ready for Inspection | GRANT WOODS |
| Wood Frame | 4/27/2020 | Not Ready for Inspection | GRANT WOODS |
| Footing/Foundation/Slab | 4/28/2020 | Approved | GRANT WOODS |
| Structural Steel Frame | 4/28/2020 | Approved | GRANT WOODS |
| Wood Frame | 4/28/2020 | Not Ready for Inspection | GRANT WOODS |
| Deputy Reinf. Concrete | 4/29/2020 | Conditional Approval | GRANT WOODS |
| Wood Frame | 4/30/2020 | Partial Approval | SORIN CIRSTOIU |
| Insulation | 5/6/2020 | Approved | GRANT WOODS |
| Deputy Steel/Welding | 5/12/2020 | Conditional Approval | GRANT WOODS |
| Wood Frame | 5/13/2020 | Not Ready for Inspection | GRANT WOODS |
| Wood Frame | 5/14/2020 | Partial Approval | GRANT WOODS |
| Interior/Exterior Lathing | 5/18/2020 | Not Ready for Inspection | GRANT WOODS |
| Interior/Exterior Lathing | 5/19/2020 | Approved | GRANT WOODS |
| Final | 6/2/2020 | Partial Inspection | GRANT WOODS |
| SGSOV-Seismic Gas S/O Valve | 6/2/2020 | SGSOV Not Ready | GRANT WOODS |
| Smoke Detectors | 6/2/2020 | Not Ready for Inspection | GRANT WOODS |
| Special/Order Compliance | 4/23/2021 | Corrections Issued | GRANT WOODS |
| Final | 6/15/2026 | OK for CofC | VASIL MIHALEV |
| SGSOV-Seismic Gas S/O Valve | 6/15/2026 | SGSOV Not Required | VASIL MIHALEV |
| Smoke Detectors | 6/15/2026 | Approved | VASIL MIHALEV |