1920 S MANNING AVE 1-7 90025
Certificate Information: 1920 S MANNING AVE 1-7 90025
- Application / Permit
- 17016-10000-36598
- Plan Check / Job No.
- B17LA22567
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 3 ORDINARY MOMENT FRAME SYSTEMS (OMF) WITH CONCRETE TIE BEAM. 1 OMF EACH AT REAR AND 2 SIDES. WORKS ARE AT REAR TUCK-UNDER PARKING AREAS, NOT ON TENANTS' UNITS.
- Permit Issued
- Issued on 11/12/2020
- Issuing Office
- Current Status
- CofC Issued on 3/12/2021
Permit Application Status History
| Submitted | 12/11/2017 | APPLICANT |
| Assigned to Plan Check Engineer | 1/4/2018 | ERWIN PASCUA |
| Corrections Issued | 1/17/2018 | ERWIN PASCUA |
| Quality Review Completed | 1/19/2018 | SAI KHUM |
| Building Plans Picked Up | 1/23/2018 | APPLICANT |
| Plan Check Approved | 2/21/2018 | ERWIN PASCUA |
| Issued | 11/12/2020 | APPLICANT |
| OK for CofC | 3/4/2021 | GRANT WOODS |
| CofC Issued | 3/12/2021 | HENRY BAGHDASSARIAN |
Permit Application Clearance Information
| Housing rent stabilization | Cleared | 11/4/2020 | MICHAEL SOTO |
Contact Information
| Contractor | Optimum Seismic Inc; Lic. No.: 1012702-B | 5508 S SANTA FE AVENUE VERNON, CA 90058 |
| Engineer | , ; Lic. No.: C82891 | 23022 SAMUEL ST APT 36 TORRANCE, CA 90505 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 11/18/2020 | Approved | GRANT WOODS |
| Deputy Drilled-In Anchors | 12/15/2020 | Conditional Approval | GRANT WOODS |
| Footing/Foundation/Slab | 12/16/2020 | Approved | SORIN CIRSTOIU |
| Structural Steel Frame | 12/16/2020 | Approved | SORIN CIRSTOIU |
| Wood Frame | 12/16/2020 | Approved | SORIN CIRSTOIU |
| Deputy Drilled-In Anchors | 12/18/2020 | Conditional Approval | PAUL DAVIDSON |
| Deputy Reinf. Concrete | 12/18/2020 | Conditional Approval | SORIN CIRSTOIU |
| Interior/Exterior Lathing | 1/22/2021 | Approved | GRANT WOODS |
| Final | 3/4/2021 | OK for CofC | GRANT WOODS |
| METHANE-Final | 3/4/2021 | Approved | GRANT WOODS |
| SGSOV-Seismic Gas S/O Valve | 3/4/2021 | SGSOV Approved | GRANT WOODS |
| Smoke Detectors | 3/4/2021 | Approved | GRANT WOODS |